Contacts, documents and full notice history are available with a subscription.
Award Notice SBA 1 notice

Intracoastal and Okeechobee Waterway Maintenance Dredging Vicinity of St. Lucie Inlet and Jupiter Inlet, Martin and Palm Beach Counties, Florida W912EP25CA013

Solicitation W912EP25CA013 Copied Notice ID 74ef168b48e1444ea2f0438d309f1b20 Copied DEPT OF DEFENSE — W074 ENDIST JACKSNVLLE
SAM.gov
Posted
Sep 25, 2025
Deadline
No deadline
Set-aside
SBA
NAICS
237990
PSC
Z1KF

Summary

AI-generated · Sep 29, 2025

Maintenance dredging of the Intracoastal Waterway in the Jupiter and St. Lucie Inlet areas, with about 100,000 cubic yards removed near Jupiter Inlet from IWW Cuts P-1 through P-9 and piped to the beach placement area immediately south of Jupiter Inlet; and about 200,000 cubic yards removed near St. Lucie Inlet from IWW Cuts M-1 through M-6 and OWW Cut-1, with the material placed in the St. Lucie inshore impoundment basin for future beach nourishment use.

Incidental work includes endangered species and turbidity monitoring for both sites, with vibration monitoring and beach tilling required at the Jupiter Inlet beach site. The contract was awarded to Southwind Construction Corp for $7,233,731.25.

Project will consist of maintenance dredging from the Intracoastal Waterway channel (IWW) in the vicinity of Jupiter and St. Lucie Inlets. These two areas are approximately 16 IWW channel miles apart. The Jupiter Inlet portion of the project consists of maintenance dredging approximately 100,000 cubic yards from IWW Cuts P-1 through P-9. The excavated material will be piped to the beach placement area immediately south of Jupiter Inlet. The St. Lucie Inlet work consists of maintenance dredging approximately 200,000 cubic yards from IWW Cuts M-1 through M-6 and OWW cut-1. Excavated material will be placed in the St. Lucie inshore impoundment basin for future use as beach renourishment fill. Incidental work for both project areas will include endangered species monitoring, turbidity monitoring. Vibration monitoring and beach tilling will be required at the Jupiter Inlet beach site.

From Award Notice posted on Sep 25, 2025

Notice history

1
  1. Award Notice LATEST Posted Sep 25, 2025

Details

Solicitation number W912EP25CA013
Notice ID 74ef168b48e1444ea2f0438d309f1b20
Award number W912EP25CA013
Notice type Award Notice
Product / Service (PSC) Z1KF
NAICS 237990
Place of performance Florida
Archive date Oct 10, 2025

Award Information

Awardee
1
Total Awarded
$7,233,731.25
Award Date
Sep 25, 2025

Award Notices

Intracoastal and Okeechobee Waterway Maintenance Dredging Vicinity of St. Lucie Inlet and Jupiter Inlet, Martin and Palm Beach Counties, Florida View Notice

Posted: Sep 25, 2025

Project will consist of maintenance dredging from the Intracoastal Waterway channel (IWW) in the vicinity of Jupiter and St. Lucie Inlets. These two areas are approximately 16 IWW channel miles apart. The Jupiter Inlet portion of the project consists of maintenance dredging approximately 100,000 cub...

Awardees

Company Name UEI CAGE Code Location
SOUTHWIND CONSTRUCTION CORP KMRHQL3M2NJ7 0EXU7 Evansville, IN

Documents

No files available

View on SAM.gov

Contacts

primary
Timothy G. Humphrey

Email

secondary
Guesley Leger

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTH ATLANTIC
W074 ENDIST JACKSNVLLE

Place of Performance

Florida 34996
USA

Dates

Posted Sep 25, 2025 10 months ago
Last Updated Aug 06, 2026 2 days ago
Awarded Sep 25, 2025 10 months ago