Hybrid vessel Charging System Project at Caven Point Marine Terminal W912DS25C0008
Summary
AI-generated · Aug 24, 2025Hybrid Vessel Shore Power Charging System project at Caven Point Marine Terminal in Hudson County, Gateway, NJ requires demolition of existing timber fender piles and timber rub rail, removal of pavement and trench drain, to install seven new mooring dolphins that will support the hybrid shore power infrastructure.
Awarded to Michels Construction, Inc. for $7,691,140 to perform the work.
Hybrid Vessel Shore Power Charging System at Caven Point Marine Terminal, Hudson County, Gateway, NJ. The work that will be performed under this contract will includes demolition of existing timber fender piles, timber rub rail, and removal of existing pavement and trench drain for the installation of seven (7) new mooring dolphins.
From Award Notice posted on Jul 18, 2025Notice history
1-
Award Notice LATEST Posted Jul 18, 2025
Details
Award Information
Award Notices
Posted: Jul 18, 2025
Hybrid Vessel Shore Power Charging System at Caven Point Marine Terminal, Hudson County, Gateway, NJ. The work that will be performed under this contract will includes demolition of existing timber fender piles, timber rub rail, and removal of existing pavement and trench drain for the installation...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| MICHELS CONSTRUCTION, INC. | CDE7H8M86MB5 | 9C1R4 | Brownsville, WI |
Contacts
Agency
Place of Performance
USA