Combined Synopsis/Solicitation SBA Expired 1 notice 3 documents

HVAC Replacement at USCG STA Washington 30252PR260000011

Solicitation 30252PR260000011 Copied Notice ID 5af279c064bc4bbdab82ba136888fa1b Copied HOMELAND SECURITY, DEPARTMENT OF — BASE NATIONAL CAPITAL REGION(000G8)
SAM.gov
Posted
Apr 23, 2026
Deadline
Apr 30, 2026
Set-aside
SBA
NAICS
238220
PSC
N041

Summary

AI-generated · Apr 24, 2026

Replace HVAC at USCG STA Washington per the attached SOW, including performing heat-load calculations using the existing ductwork to determine the appropriate size for indoor and outdoor units, and providing the owner with a written copy of those calculations. If the heat-load results require ductwork changes, the contractor must modify/resize and install them. Install a new EPA-approved A2L refrigerant system (R-454B or R-32, preferably R-454B); pull an entirely new line-set from the heat pump to the air handler, including new suction and liquid lines, and install a new liquid-line drier for each circuit indoors near the air handler to prevent corrosion.

Remove and dispose of the current indoor and outdoor units (the units will be without refrigerant during removal). Replace wiring and conduit from the existing service disconnects to the new equipment, and replace any corroded or damaged conduit or wiring discovered during demolition. If any disconnects are not fused, replace them with new fused disconnects. Replace all thermostat control wiring inside and outside with UV-rated wire, and provide and replace the existing thermostat to match the system function.

HVAC replacemet in accordance with the Attached SOW, to include: a. Determine heat load calculations for the HVAC system using installed ducting system. Use heat load calculations to determine an appropriate size/capacity for indoor and outdoor units utilizing installed ducting. Provide owner with a written copy of load calculations. If it is determined that any duct work needs to be modified, changed or resized in any way due to the heat load calculations, contractor shall provide and install. New unit shall be EPA approved A2L based refrigerant either R-454B or R-32, preferably R-454B. Contractor shall pull and entire new line-set to include new suction lines and liquid lines that run from heat pump to air handler. Contractor shall install a new liquid line drier for each circuit and locate the new liquid line drier indoors near the air handler to prevent unnecessary corrosion from outside elements. b. Remove and dispose of the current outdoor and indoor units. Unit will not have refrigerant in it. c. Replace wiring and conduit from existing service disconnects to new pieces of equipment. Replace any corroded or damaged conduit or wiring found during the demo of existing equipment. If disconnects are not fused, then contractor shall replace any and all associated disconnects with new fused ones. d. Replace all thermostat control wiring inside and outside with new UV rated wire. Provide and replace existing thermostat to match the system function.

From Combined Synopsis/Solicitation posted on Apr 23, 2026

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Apr 23, 2026 View

Details

Solicitation number 30252PR260000011
Notice ID 5af279c064bc4bbdab82ba136888fa1b
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) N041
NAICS 238220
Place of performance Bolling AFB, District of Columbia
Archive date May 15, 2026

Award Information

Not yet awarded

Contacts

primary
Samuel Salerno

Email

Phone

Agency

HOMELAND SECURITY, DEPARTMENT OF
US COAST GUARD
BASE NATIONAL CAPITAL REGION(000G8)

Place of Performance

Bolling AFB, District of Columbia 20032
USA

Dates

Posted Apr 23, 2026 3 months ago
Last Updated Aug 06, 2026 1 day ago
Due Apr 30, 2026 3 months ago