Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 3 notices 9 documents

Hiawatha NF GAOA Grand Island Trails Improvement 12445525Q0061

Solicitation 12445525Q0061 Copied Notice ID dd390fd49a04493b95a4fd0f9e0a627c Copied AGRICULTURE, DEPARTMENT OF — USDA-FS, CSA EAST 13
SAM.gov
Posted
Jul 23, 2025
Deadline
Aug 14, 2025
Set-aside
SBA
NAICS
237990
PSC
Z1LB

Summary

AI-generated · Aug 24, 2025

Extensive reconstruction and deferred maintenance at 21 Grand Island Trail locations on the Hiawatha National Forest, including about 2.5 miles of linear grading and general restoration (clearing and brushing, tread rehabilitation, stump removal, and ditching). Install 14 culverts, either new or replacing existing failing culverts. No additional material is to be brought in for trail rehabilitation beyond what is specifically identified in the project specifications (Section J).

Pre-bid meeting times have been updated across notices. One notice offered a choice of 8:00 am or 10:00 am, with an upcoming amendment noted. A subsequent notice revised the options to 8:00 am or 12:00 pm, with the core project scope unchanged.

This project is for extensive reconstruction and deferred maintenance at 21 locations along the Grand Island Trail Improvements on the Hiawatha National Forest (HNF). Trail reconstruction consisting of approximately 2.5 miles of linear grading which includes general restoration (clearing and brushing, tread rehabilitation, stump removal and ditching). There will also be 14 culverts installed, either new or replacing existing failing culverts. No additional material to be brought in to rehabilitate trail unless specifically identified. See Section J attachments for project specifications.

From Combined Synopsis/Solicitation posted on Jul 23, 2025

**The pre-bid meeting times for this project will be 8-6-2025 at 8 am or 10 am (pick one). Amendment forthcoming. This project is for extensive reconstruction and deferred maintenance at 21 locations along the Grand Island Trail Improvements on the Hiawatha National Forest (HNF). Trail reconstruction consisting of approximately 2.5 miles of linear grading which includes general restoration (clearing and brushing, tread rehabilitation, stump removal and ditching). There will also be 14 culverts installed, either new or replacing existing failing culverts. No additional material to be brought in to rehabilitate trail unless specifically identified. See Section J attachments for project specifications.

From Combined Synopsis/Solicitation posted on Jul 31, 2025

**The pre-bid meeting times for this project will be 8-6-2025 at 8 am or 12 pm (pick one). This project is for extensive reconstruction and deferred maintenance at 21 locations along the Grand Island Trail Improvements on the Hiawatha National Forest (HNF). Trail reconstruction consisting of approximately 2.5 miles of linear grading which includes general restoration (clearing and brushing, tread rehabilitation, stump removal and ditching). There will also be 14 culverts installed, either new or replacing existing failing culverts. No additional material to be brought in to rehabilitate trail unless specifically identified. See Section J attachments for project specifications.

From Combined Synopsis/Solicitation posted on Aug 04, 2025

Notice history

3
  1. Combined Synopsis/Solicitation Posted Jul 23, 2025
  2. Combined Synopsis/Solicitation Posted Jul 31, 2025
    • Description: Description was updated
  3. Combined Synopsis/Solicitation LATEST Posted Aug 04, 2025
    • Description: Description was updated

Details

Solicitation number 12445525Q0061
Notice ID dd390fd49a04493b95a4fd0f9e0a627c
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Z1LB
NAICS 237990
Place of performance Munising, Michigan
Archive date Aug 29, 2025

Award Information

Not yet awarded

Contacts

primary
Cassandra Potts

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA EAST 13

Place of Performance

Munising, Michigan 49862
USA

Dates

Posted Jul 23, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Aug 14, 2025 11 months ago