Hiawatha NF GAOA Grand Island Trails Improvement 12445525Q0061
Summary
AI-generated · Aug 24, 2025Extensive reconstruction and deferred maintenance at 21 Grand Island Trail locations on the Hiawatha National Forest, including about 2.5 miles of linear grading and general restoration (clearing and brushing, tread rehabilitation, stump removal, and ditching). Install 14 culverts, either new or replacing existing failing culverts. No additional material is to be brought in for trail rehabilitation beyond what is specifically identified in the project specifications (Section J).
Pre-bid meeting times have been updated across notices. One notice offered a choice of 8:00 am or 10:00 am, with an upcoming amendment noted. A subsequent notice revised the options to 8:00 am or 12:00 pm, with the core project scope unchanged.
This project is for extensive reconstruction and deferred maintenance at 21 locations along the Grand Island Trail Improvements on the Hiawatha National Forest (HNF). Trail reconstruction consisting of approximately 2.5 miles of linear grading which includes general restoration (clearing and brushing, tread rehabilitation, stump removal and ditching). There will also be 14 culverts installed, either new or replacing existing failing culverts. No additional material to be brought in to rehabilitate trail unless specifically identified. See Section J attachments for project specifications.
From Combined Synopsis/Solicitation posted on Jul 23, 2025**The pre-bid meeting times for this project will be 8-6-2025 at 8 am or 10 am (pick one). Amendment forthcoming. This project is for extensive reconstruction and deferred maintenance at 21 locations along the Grand Island Trail Improvements on the Hiawatha National Forest (HNF). Trail reconstruction consisting of approximately 2.5 miles of linear grading which includes general restoration (clearing and brushing, tread rehabilitation, stump removal and ditching). There will also be 14 culverts installed, either new or replacing existing failing culverts. No additional material to be brought in to rehabilitate trail unless specifically identified. See Section J attachments for project specifications.
From Combined Synopsis/Solicitation posted on Jul 31, 2025**The pre-bid meeting times for this project will be 8-6-2025 at 8 am or 12 pm (pick one). This project is for extensive reconstruction and deferred maintenance at 21 locations along the Grand Island Trail Improvements on the Hiawatha National Forest (HNF). Trail reconstruction consisting of approximately 2.5 miles of linear grading which includes general restoration (clearing and brushing, tread rehabilitation, stump removal and ditching). There will also be 14 culverts installed, either new or replacing existing failing culverts. No additional material to be brought in to rehabilitate trail unless specifically identified. See Section J attachments for project specifications.
From Combined Synopsis/Solicitation posted on Aug 04, 2025Notice history
3-
-
Combined Synopsis/Solicitation Posted Jul 31, 2025View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation LATEST Posted Aug 04, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA