Gate Barrier PLC Replacement FA485525BarrierMantinence
Summary
AI-generated · Sep 16, 2025Replace the programmable logic controller (PLC) that operates a gate barrier system.
The provided description is blank, so the exact scope, technical requirements, location, timeline, and any special conditions (such as certifications, brand-name requirements, or site visit prerequisites) are not available from this record.
The PLCs for the barrier system at Cannon AFB, main gate are inoperable. 27 SOCES are looking to engineer and revise PLC programs in the currently installed M238 MOOG PLCs to retrofit them to work off modern MicroLogix software to overcome the obsolete MODICON PLCs. Once the new programs have been revised and installed on new MicroLogix PLCs, a Field Engineer will be needed to travel to the customer's site, Cannon AFB, to install the new components in all 5 wedge barrier control panels. Once the new PLCs and I/O modules have been installed, the Field Engineer will begin the debug process to ensure that the new control system operates properly. A final test and turnover will be done prior to departure from the site. Within 4 weeks after the project is complete, the vendor's Engineers will provide revised electrical drawings that will be submitted to Cannon AFB point of contact.
From Solicitation posted on Sep 15, 2025The PLCs for the barrier system at Cannon AFB, main gate are inoperable. 27 SOCES are looking to engineer and revise PLC programs in the currently installed M238 MOOG PLCs to retrofit them to work off modern MicroLogix software to overcome the obsolete MODICON PLCs. Once the new programs have been revised and installed on new MicroLogix PLCs, a Field Engineer will be needed to travel to the customer's site, Cannon AFB, to install the new components in all 5 wedge barrier control panels. Once the new PLCs and I/O modules have been installed, the Field Engineer will begin the debug process to ensure that the new control system operates properly. A final test and turnover will be done prior to departure from the site. Within 4 weeks after the project is complete, the vendor's Engineers will provide revised electrical drawings that will be submitted to Cannon AFB point of contact.
From Solicitation posted on Sep 17, 2025Notice history
2-
Solicitation Posted Sep 15, 2025
-
Solicitation LATEST Posted Sep 17, 2025View changes (1)
- Response Deadline: Sep 18, 2025 → Sep 22, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance