Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 2 notices 2 documents

Gate Barrier PLC Replacement FA485525BarrierMantinence

Solicitation FA485525BarrierMantinence Copied Notice ID 6cc028e6b7ff49cdbddd0f365792ed4c Copied DEPT OF DEFENSE — FA4855 27 SOCONS LGC
SAM.gov
Posted
Sep 17, 2025
Deadline
Sep 22, 2025
Set-aside
SBA
NAICS
561621
PSC
6150

Summary

AI-generated · Sep 16, 2025

Replace the programmable logic controller (PLC) that operates a gate barrier system.

The provided description is blank, so the exact scope, technical requirements, location, timeline, and any special conditions (such as certifications, brand-name requirements, or site visit prerequisites) are not available from this record.

The PLCs for the barrier system at Cannon AFB, main gate are inoperable. 27 SOCES are looking to engineer and revise PLC programs in the currently installed M238 MOOG PLCs to retrofit them to work off modern MicroLogix software to overcome the obsolete MODICON PLCs. Once the new programs have been revised and installed on new MicroLogix PLCs, a Field Engineer will be needed to travel to the customer's site, Cannon AFB, to install the new components in all 5 wedge barrier control panels. Once the new PLCs and I/O modules have been installed, the Field Engineer will begin the debug process to ensure that the new control system operates properly. A final test and turnover will be done prior to departure from the site. Within 4 weeks after the project is complete, the vendor's Engineers will provide revised electrical drawings that will be submitted to Cannon AFB point of contact.

From Solicitation posted on Sep 15, 2025

The PLCs for the barrier system at Cannon AFB, main gate are inoperable. 27 SOCES are looking to engineer and revise PLC programs in the currently installed M238 MOOG PLCs to retrofit them to work off modern MicroLogix software to overcome the obsolete MODICON PLCs. Once the new programs have been revised and installed on new MicroLogix PLCs, a Field Engineer will be needed to travel to the customer's site, Cannon AFB, to install the new components in all 5 wedge barrier control panels. Once the new PLCs and I/O modules have been installed, the Field Engineer will begin the debug process to ensure that the new control system operates properly. A final test and turnover will be done prior to departure from the site. Within 4 weeks after the project is complete, the vendor's Engineers will provide revised electrical drawings that will be submitted to Cannon AFB point of contact.

From Solicitation posted on Sep 17, 2025

Notice history

2
  1. Solicitation Posted Sep 15, 2025 View
  2. Solicitation LATEST Posted Sep 17, 2025
    • Response Deadline: Sep 18, 2025Sep 22, 2025

Details

Solicitation number FA485525BarrierMantinence
Notice ID 6cc028e6b7ff49cdbddd0f365792ed4c
Notice type Solicitation
Product / Service (PSC) 6150
NAICS 561621
Place of performance Cannon AFB, New Mexico
Archive date Oct 07, 2025

Award Information

Not yet awarded

Contacts

primary
Joshua Cameron

Email

Phone

secondary
Peter Iannuzzo

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE SPECIAL OPERATIONS COMMAND
FA4855 27 SOCONS LGC

Place of Performance

Cannon AFB, New Mexico 88103
USA

Dates

Posted Sep 17, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 22, 2025 10 months ago