Furnish and Install Brand Name Rite Heating Boiler, Model #450 WG – JBSA Lackland FA301625Q0216
Summary
AI-generated · Aug 28, 2025Furnish and install one brand-name Rite Boiler, Model 450 WG, including removal and disposal of the existing boiler and all incidental labor and materials needed to deliver a fully operational system under the Statement of Work. The work applies to Building 10504, a four-story dormitory on Lackland with about 165,841 square feet of space and a central HVAC setup that currently includes 264 fan-coil units, four VAVs, four AHUs, 29 terminal units for common areas, three outside air units with energy recovery wheels, and a 250-ton air-cooled chiller; heating is provided by a 4,500 MBH gas-fired boiler that must be replaced to support hot-water distribution.
A mandatory site visit will be held to assess conditions. Review the RFQ attachments for the exact submission requirements and instructions, including the process and deadlines for submitting questions and bid responses.
This is a combined synopsis/solicitation is to Furnish and install one (1) brand name Rite Boiler, Model 450 WG, including removal and disposal of the existing unit and all incidental labor and materials necessary to deliver a fully operational system, in accordance with the Statement of Work (SOW). Overview: Building 10504 is a four-story dormitory facility built in 2006, located at Lackland. The gross square footage of the facility is approximately 165,841 square feet (SF). The facility s Heating, Ventilation and Air Conditioning (HVAC) system consists of 264 Fan Coil Units (FCUs) that serve dormitory rooms, along with four (4) Variable Air Volume (VAV), four (4) Air Handling Units (AHUs) and 29 associated terminal units that provide heating and cooling to the building s common areas. Additionally, three Outside Air Units (OAUs), each equipped with an energy recovery wheel, are located on the attic level and provide conditioned outside air to improve ventilation and indoor air quality. The HVAC system is supported by a 250-ton air-cooled chiller that supplies chilled water to the FCUs, AHUs, and OAUs. Heating is provided by a 4,500 MBH (Milli-BTU per Hour) gas-fired boiler that distributes hot water throughout the building and must be replaced. Key Dates: Site Visit -- 10:30 a.m. CDT, Thursday, September 4, 2025 Questions Due -- 1:30 p.m. CDT, Monday, September 8,2025 Response Due Date -- no later than 1:30 p.m. CDT, Friday, September 12, 2025 Attachments: 1. Solicitation FA301625Q0216 2. Statement of Work (SOW) MPLS B10504 LAK BOILER WT - 21 Aug 2025 Final 3. SSJ Brand Name Boiler B10504 -- Lackland AFB - Redact *PLEASE REFER TO THE ATTACHED RFQ FOR SPECIFIC SUBMISSION REQUIREMENTS/INSTRUCTIONS AND KEYDATES TO INCLUDE A SITE VISIT.
From Combined Synopsis/Solicitation posted on Aug 27, 20252 September 2025 - Amendment 0001 information: The purpose of this amendment is to: 1. Change the Question Due Date to Friday, 1:30 p.m. CST, September 5, 2025. 2. Change the Response Due Date to Wednesday, 3:00 p.m. CST, September 10, 2025. 3. All other terms and conditions shall remain unchanged. Refer to the revised attachments. *Note when submitting a proposal please ensure response is to the latest Amendment Posted* ============================================================================================ This is a combined synopsis/solicitation is to Furnish and install one (1) brand name Rite Boiler, Model 450 WG, including removal and disposal of the existing unit and all incidental labor and materials necessary to deliver a fully operational system, in accordance with the Statement of Work (SOW). Overview: Building 10504 is a four-story dormitory facility built in 2006, located at Lackland. The gross square footage of the facility is approximately 165,841 square feet (SF). The facility s Heating, Ventilation and Air Conditioning (HVAC) system consists of 264 Fan Coil Units (FCUs) that serve dormitory rooms, along with four (4) Variable Air Volume (VAV), four (4) Air Handling Units (AHUs) and 29 associated terminal units that provide heating and cooling to the building s common areas. Additionally, three Outside Air Units (OAUs), each equipped with an energy recovery wheel, are located on the attic level and provide conditioned outside air to improve ventilation and indoor air quality. The HVAC system is supported by a 250-ton air-cooled chiller that supplies chilled water to the FCUs, AHUs, and OAUs. Heating is provided by a 4,500 MBH (Milli-BTU per Hour) gas-fired boiler that distributes hot water throughout the building and must be replaced. Key Dates: Site Visit -- 10:30 a.m. CDT, Thursday, September 4, 2025 Questions Due -- 1:30 p.m. CDT, Monday, September 8,2025 Response Due Date -- no later than 1:30 p.m. CDT, Friday, September 12, 2025 Attachments: 1. Solicitation FA301625Q0216 2. Statement of Work (SOW) MPLS B10504 LAK BOILER WT - 21 Aug 2025 Final 3. SSJ Brand Name Boiler B10504 -- Lackland AFB - Redact *PLEASE REFER TO THE ATTACHED RFQ FOR SPECIFIC SUBMISSION REQUIREMENTS/INSTRUCTIONS AND KEYDATES TO INCLUDE A SITE VISIT.
From Combined Synopsis/Solicitation posted on Sep 02, 2025Amendment 0002 The purpose of this amendment is to: 1. Post the Questions and Answers resulting from the Site Visit. 2. Post the Site Visit Attendance Sheet. All other terms and conditions shall remain unchanged. Please refer to the attached documents. =========================================================================== 2 September 2025 - Amendment 0001 information: The purpose of this amendment is to: 1. Change the Question Due Date to Friday, 1:30 p.m. CST, September 5, 2025. 2. Change the Response Due Date to Wednesday, 3:00 p.m. CST, September 10, 2025. 3. All other terms and conditions shall remain unchanged. Refer to the revised attachments. *Note when submitting a proposal please ensure response is to the latest Amendment Posted* ========================================================================== This is a combined synopsis/solicitation is to Furnish and install one (1) brand name Rite Boiler, Model 450 WG, including removal and disposal of the existing unit and all incidental labor and materials necessary to deliver a fully operational system, in accordance with the Statement of Work (SOW). Overview: Building 10504 is a four-story dormitory facility built in 2006, located at Lackland. The gross square footage of the facility is approximately 165,841 square feet (SF). The facility s Heating, Ventilation and Air Conditioning (HVAC) system consists of 264 Fan Coil Units (FCUs) that serve dormitory rooms, along with four (4) Variable Air Volume (VAV), four (4) Air Handling Units (AHUs) and 29 associated terminal units that provide heating and cooling to the building s common areas. Additionally, three Outside Air Units (OAUs), each equipped with an energy recovery wheel, are located on the attic level and provide conditioned outside air to improve ventilation and indoor air quality. The HVAC system is supported by a 250-ton air-cooled chiller that supplies chilled water to the FCUs, AHUs, and OAUs. Heating is provided by a 4,500 MBH (Milli-BTU per Hour) gas-fired boiler that distributes hot water throughout the building and must be replaced. Key Dates: Site Visit -- 10:30 a.m. CDT, Thursday, September 4, 2025 Questions Due -- 1:30 p.m. CDT, Monday, September 8,2025 Response Due Date -- no later than 1:30 p.m. CDT, Friday, September 12, 2025 Attachments: 1. Solicitation FA301625Q0216 2. Statement of Work (SOW) MPLS B10504 LAK BOILER WT - 21 Aug 2025 Final 3. SSJ Brand Name Boiler B10504 -- Lackland AFB - Redact *PLEASE REFER TO THE ATTACHED RFQ FOR SPECIFIC SUBMISSION REQUIREMENTS/INSTRUCTIONS AND KEYDATES TO INCLUDE A SITE VISIT.
From Combined Synopsis/Solicitation posted on Sep 08, 2025Notice history
3-
-
Combined Synopsis/Solicitation Posted Sep 02, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 12, 2025 → Sep 10, 2025
-
Combined Synopsis/Solicitation LATEST Posted Sep 08, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA