Expand Emergency Power Design - AE Sole Source W912PL-25-Z-1AHT
Summary
AI-generated · Aug 24, 2025Expand emergency power design—sole-source to the original source under FAR 6.302-1(a)(2)(ii) for follow-on architecture/engineering design work when necessary to avoid substantial duplication of cost or unacceptable delays. This indicates the government will not compete the contract; instead, it will rely on the original AE contractor to expand the emergency power design.
FAR Reference Update: As implemented by Federal Acquisition Regulation FAR 6.302-1(a)(2)(ii)) is appropriate for follow-on contracts with the original source when necessary to avoid substantial duplication of cost or unacceptable delays.
From Special Notice posted on Aug 14, 2025Notice history