Expand Emergency Power Design - AE Sole Source W912PL-25-Z-1AHT
Summary
AI-generated · Aug 24, 2025Expand emergency power design—sole-source to the original source under FAR 6.302-1(a)(2)(ii) for follow-on architecture/engineering design work when necessary to avoid substantial duplication of cost or unacceptable delays. This indicates the government will not compete the contract; instead, it will rely on the original AE contractor to expand the emergency power design.
FAR Reference Update: As implemented by Federal Acquisition Regulation FAR 6.302-1(a)(2)(ii)) is appropriate for follow-on contracts with the original source when necessary to avoid substantial duplication of cost or unacceptable delays.
From Special Notice posted on Aug 14, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
85012