Summary

AI-generated · Sep 14, 2025

Road maintenance on Encino Vista Road in the Coyote Ranger District of the Santa Fe National Forest. Base work includes: drain dip construction by excavating and compacting about 300 cubic yards of native material; road widening by excavating and compacting about 530 cubic yards to achieve a total width of 12 feet; aggregate surfacing with 1,800 tons of aggregate furnished, placed, and compacted; road reconditioning along 6.5 miles including ditch, shoulder, and roadbed maintenance; and culvert replacement installing one 36-inch round corrugated metal pipe (30 feet long) on top of about 15 cubic feet of uncompacted bedding material.

Between notices, the project has progressed from a presolicitation to a formal solicitation, indicating bids are now being invited for the same base items described above; no additional scope changes are indicated in the provided information.

The Santa Fe National Forest is pursuing road maintenance activities to be accomplished on the Coyote Ranger District. Base items include drain dip construction, road widening, aggregate surfacing, road reconditioning, and culvert replacement. Drain dip construction will involve the excavation and compaction of approximately 300 cubic yards of native material. Road widening will involve the excavation and compaction of approximately 530 cubic yards of native material and will result in total road widths of twelve (12) feet. Aggregate surfacing will involve the furnishing, placement, and compaction of 1800 tons of aggregate. Road reconditioning will involve ditch maintenance, shoulder maintenance, and roadbed maintenance along a length of 6.5 miles. Lastly, culvert replacement will involve the placement of one round corrugated metal pipe with a diameter of 36 inches and a length of 30 feet on top of approximately 15 cubic feet of uncompacted bedding material.

From Presolicitation posted on Sep 10, 2025

The Santa Fe National Forest is pursuing road maintenance activities to be accomplished on the Coyote Ranger District. Base items include drain dip construction, road widening, aggregate surfacing, road reconditioning, and culvert replacement. Drain dip construction will involve the excavation and compaction of approximately 300 cubic yards of native material. Road widening will involve the excavation and compaction of approximately 530 cubic yards of native material and will result in total road widths of twelve (12) feet. Aggregate surfacing will involve the furnishing, placement, and compaction of 1800 tons of aggregate. Road reconditioning will involve ditch maintenance, shoulder maintenance, and roadbed maintenance along a length of 6.5 miles. Lastly, culvert replacement will involve the placement of one round corrugated metal pipe with a diameter of 36 inches and a length of 30 feet on top of approximately 15 cubic feet of uncompacted bedding material.

From Solicitation posted on Sep 11, 2025

****NOTICE: AT THIS TIME, THIS SOLICITATIONS RESPONSE DATE IS BEING EXTENDED INDEFINETLY DUE TO THE GOVERNMENT SHUTDOWN. ONCE THE GOVERNMENT HAS RESUMED NORMAL OPERATIONS THIS POSTING WILL BE UPDATED TO REFLECT A NEW DUE DATE ALONG WITH A NEW SITE VISIT DATE.**** The Santa Fe National Forest is pursuing road maintenance activities to be accomplished on the Coyote Ranger District. Base items include drain dip construction, road widening, aggregate surfacing, road reconditioning, and culvert replacement. Drain dip construction will involve the excavation and compaction of approximately 300 cubic yards of native material. Road widening will involve the excavation and compaction of approximately 530 cubic yards of native material and will result in total road widths of twelve (12) feet. Aggregate surfacing will involve the furnishing, placement, and compaction of 1800 tons of aggregate. Road reconditioning will involve ditch maintenance, shoulder maintenance, and roadbed maintenance along a length of 6.5 miles. Lastly, culvert replacement will involve the placement of one round corrugated metal pipe with a diameter of 36 inches and a length of 30 feet on top of approximately 15 cubic feet of uncompacted bedding material.

From Solicitation posted on Oct 02, 2025

****NOTICE: solicitation due date to October 24th, 2025. This amendment sets a new site visit date and time; Site Visit will be on October 15th, 2025 @ 10:00 AM Local time. Location will be at the Intersection between NFSRs 103 and 76. GPS Coordinates are 36.1992, -106.7706.**** The Santa Fe National Forest is pursuing road maintenance activities to be accomplished on the Coyote Ranger District. Base items include drain dip construction, road widening, aggregate surfacing, road reconditioning, and culvert replacement. Drain dip construction will involve the excavation and compaction of approximately 300 cubic yards of native material. Road widening will involve the excavation and compaction of approximately 530 cubic yards of native material and will result in total road widths of twelve (12) feet. Aggregate surfacing will involve the furnishing, placement, and compaction of 1800 tons of aggregate. Road reconditioning will involve ditch maintenance, shoulder maintenance, and roadbed maintenance along a length of 6.5 miles. Lastly, culvert replacement will involve the placement of one round corrugated metal pipe with a diameter of 36 inches and a length of 30 feet on top of approximately 15 cubic feet of uncompacted bedding material.

From Solicitation posted on Oct 07, 2025

Award Notice

From Award Notice posted on Feb 18, 2026

Notice history

5
  1. Presolicitation Posted Sep 10, 2025 View
  2. Solicitation Posted Sep 11, 2025
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Sep 10, 2025Oct 09, 2025
  3. Solicitation Posted Oct 02, 2025
    • Description: Description was updated
    • Response Deadline: Oct 09, 2025Oct 31, 2025
  4. Solicitation Posted Oct 07, 2025
    • Description: Description was updated
    • Response Deadline: Oct 31, 2025Oct 24, 2025
  5. Award Notice LATEST Posted Feb 18, 2026

Details

Solicitation number 127EAX25R0020
Notice ID 6986e211bec34c7593368ab2a9b90220
Award number 127EAX26C0012
Notice type Award Notice
Product / Service (PSC) Z1LB
NAICS 237310
Place of performance Gallina, New Mexico
Archive date Mar 05, 2026

Award Information

Awardee
1
Total Awarded
$249,776.00
Award Date
Feb 18, 2026

Award Notices

Encino Vista Road Maintenance View Notice

Posted: Feb 18, 2026

Award Notice

Awardees

Company Name UEI CAGE Code Location
Crystal Springs of Fillmore LLC SHPTAS3EN9F7 159G1 Logan, UT

Documents

No files available

View on SAM.gov

Contacts

primary
Troy A. McCullough

Email

Agency

AGRICULTURE, DEPARTMENT OF
FOREST SERVICE
USDA-FS, CSA SOUTHWEST 7

Place of Performance

Gallina, New Mexico 87017
USA

Dates

Posted Feb 18, 2026 5 months ago
Last Updated Aug 06, 2026 1 day ago
Awarded Feb 18, 2026 5 months ago