Contacts, documents and full notice history are available with a subscription.
Solicitation 8A Expired 1 notice

EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA W911KB25RA010

Solicitation W911KB25RA010 Copied Notice ID 2b73af669fc8449b88ffbe6cbf503024 Copied DEPT OF DEFENSE — W2SN ENDIST ALASKA
SAM.gov
Posted
Jul 31, 2025
Deadline
May 02, 2025
Set-aside
8A
NAICS
236220
PSC
Y1PZ

Summary

AI-generated · Aug 24, 2025

Design-build project to design and replace four 1,500 kW standby generators and associated electrical equipment that provide primary power to Eielson Air Force Base Power Plant Building B6203. The two bulk fuel storage tanks will remain in place but must be inspected and a status report provided detailing any concerns, issues, and deficiencies; the non-functioning bulk fuel tank fuel gauge must be replaced, and signage for the generators and bulk fuel storage tanks must be replaced. Three firms—Bristol Building Constructors, LLC; Red Point Construction, LLC; STG Pacific, LLC—have been selected to move to Phase 2.

Maintain specified power availability: 4,500 kW standby and 4,095 kW prime from April 15 through September 15; 3,000 kW standby and 2,730 kW prime from May 1 through July 31. Outside these periods, no generator shutdown is allowed. A 30-day notification is required for anticipated electrical shutdowns. The contractor must provide a construction phasing plan, schedule, and assumptions in the ECIFP Report and within the design drawings and specifications.

*********************************************************************** THIS IS TO IDENTIFY THE CONTRACTORS SELECTED TO MOVE TO PHASE 2 FOR THIS ACQUISITION. THE THREE CONTRACTORS ARE AS FOLLOWS: BRISTOL BUILDING CONSTRUCTORS, LLC RED POINT CONSTRUCTION, LLC STG PACIFIC, LLC *********************************************************************** This is a Design Build project to design and replace the existing four 1,500 kW standby generators and associated electrical equipment that provide primary power to the Eielson Air Force Base (EAFB) Power Plant Building B6203. The two bulk fuel storage tanks are to remain but are required to be inspected and a status report provided, detailing any concerns, issues and deficiencies. The bulk fuel tank fuel gauge equipment is not functioning and must be replaced. The signage for the generators and bulk fuel storage tanks must be replaced. Contractor must maintain a minimum of 4,500kW (standby rated) power and 4,095kW (Prime rated) power available for the site and power plant from April 15th through September 15th. The contractor must maintain a minimum of 3,000kW (standby rated) power and 2,730kW (Prime rated) power available for the site and power plant from May 1st to July 31st. All other times of the year the contractor is not allowed to shut down a generator. 30-day notification of anticipated electrical shutdowns are required. The contractor must provide construction phasing plan, schedule, and assumptions in the Engineering Considerations and Instructions for Field Personnel (ECIFP) Report and within the design drawings and specifications.

From Solicitation posted on Jul 31, 2025

Notice history

1
  1. Solicitation LATEST Posted Jul 31, 2025

Details

Solicitation number W911KB25RA010
Notice ID 2b73af669fc8449b88ffbe6cbf503024
Notice type Solicitation
Product / Service (PSC) Y1PZ
NAICS 236220
Set-aside 8a Competed
Archive date Apr 24, 2026

Award Information

Awardee
1

Awardees

Company Name UEI CAGE Code Location
N/A N/A N/A

Documents

No files available

View on SAM.gov

Contacts

primary
Mark Corn

Email

Phone

secondary
THERESA AFRANK

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION PACIFIC OCEAN
W2SN ENDIST ALASKA

Place of Performance

POWER PLANT B6203, EIELSON AIR FORCE BASE, ALASKA
99702

Dates

Posted Jul 31, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due May 02, 2025 1 year ago