EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA W911KB25RA010
Summary
AI-generated · Aug 24, 2025Design-build project to design and replace four 1,500 kW standby generators and associated electrical equipment that provide primary power to Eielson Air Force Base Power Plant Building B6203. The two bulk fuel storage tanks will remain in place but must be inspected and a status report provided detailing any concerns, issues, and deficiencies; the non-functioning bulk fuel tank fuel gauge must be replaced, and signage for the generators and bulk fuel storage tanks must be replaced. Three firms—Bristol Building Constructors, LLC; Red Point Construction, LLC; STG Pacific, LLC—have been selected to move to Phase 2.
Maintain specified power availability: 4,500 kW standby and 4,095 kW prime from April 15 through September 15; 3,000 kW standby and 2,730 kW prime from May 1 through July 31. Outside these periods, no generator shutdown is allowed. A 30-day notification is required for anticipated electrical shutdowns. The contractor must provide a construction phasing plan, schedule, and assumptions in the ECIFP Report and within the design drawings and specifications.
*********************************************************************** THIS IS TO IDENTIFY THE CONTRACTORS SELECTED TO MOVE TO PHASE 2 FOR THIS ACQUISITION. THE THREE CONTRACTORS ARE AS FOLLOWS: BRISTOL BUILDING CONSTRUCTORS, LLC RED POINT CONSTRUCTION, LLC STG PACIFIC, LLC *********************************************************************** This is a Design Build project to design and replace the existing four 1,500 kW standby generators and associated electrical equipment that provide primary power to the Eielson Air Force Base (EAFB) Power Plant Building B6203. The two bulk fuel storage tanks are to remain but are required to be inspected and a status report provided, detailing any concerns, issues and deficiencies. The bulk fuel tank fuel gauge equipment is not functioning and must be replaced. The signage for the generators and bulk fuel storage tanks must be replaced. Contractor must maintain a minimum of 4,500kW (standby rated) power and 4,095kW (Prime rated) power available for the site and power plant from April 15th through September 15th. The contractor must maintain a minimum of 3,000kW (standby rated) power and 2,730kW (Prime rated) power available for the site and power plant from May 1st to July 31st. All other times of the year the contractor is not allowed to shut down a generator. 30-day notification of anticipated electrical shutdowns are required. The contractor must provide construction phasing plan, schedule, and assumptions in the Engineering Considerations and Instructions for Field Personnel (ECIFP) Report and within the design drawings and specifications.
From Solicitation posted on Jul 31, 2025Notice history
1Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| N/A | N/A | N/A |
Contacts
Phone
Phone
Agency
Place of Performance
99702