Data Center San Antonio - Furniture Purchase and Install HC102825R0040
Summary
AI-generated · Aug 23, 2025Provide and install new systems furniture for Data Center San Antonio, including purchase, delivery, and installation, with electrical and communication cabling connections. Work spans lobby, administrative, and office areas and must render the spaces operational to support mission requirements. Follow the Design Intent Drawings (Appendix A) and the Furniture Installation and General Requirements (Appendix B). Access to protected proposal documents requires submitting an access request and meeting SAM registration/Point of Contact requirements; allow up to 5 days for access after SAM updates and up to 2 weeks for new registrations.
Amendment 0001 changes the period of performance. A subsequent AMD02 notice extends the due date to July 22, 2025 and references attachments for the SAT Furniture RFP and Q&A. The core scope remains the same: furnish and install new systems furniture across the specified spaces, including required cabling.
AMENDMENT 0001 - CHANGE TO PERIOD OF PERFORMANCE. Contractor shall provide and install through purchase, delivery, and installation - new systems furniture, as described in this PWS, as shown on the Design Intent Drawings (Appendix A), and as described in the Furniture Installation and General Requirements (Appendix B). Work shall occur throughout various lobby, administrative and office areas of Data Center San Antonio. Furniture installation includes electrical and communication cabling connections. Furniture installation will render the spaces operational to fulfill mission requirements. Accessing Protected Proposal Documents: The Access Request Link is located below Attachments/Links header. If you cannot request RFP HC102825R0040 protected document access: -Are you logged into SAM? -Are you a registered SAM Point of Contact within your organization? -Is your organization represented by NAICS 337214? -Is your organization an SBA certified Small Business? RFP HC102825R0040 issuing office has limited to zero assistance ability with SAM registrations. Please visit https://sam.gov/help for SAM registration support. Allow up to 5 days before attempting to access controlled documents for recently updated SAM registrations. Allow at least 2 weeks before attempting to access controlled documents for new SAM registrations.
From Solicitation posted on Jun 04, 2025AMD02: Due date extended to 22 July 2025. See attachments: 1. RFP AMD02 HC102825R0040 SAT Furniture 2. HC102825R0040 Question and Answers. ----------------------------------------------------------------------------------------- AMENDMENT 0001 - CHANGE TO PERIOD OF PERFORMANCE. Contractor shall provide and install through purchase, delivery, and installation - new systems furniture, as described in this PWS, as shown on the Design Intent Drawings (Appendix A), and as described in the Furniture Installation and General Requirements (Appendix B). Work shall occur throughout various lobby, administrative and office areas of Data Center San Antonio. Furniture installation includes electrical and communication cabling connections. Furniture installation will render the spaces operational to fulfill mission requirements. Accessing Protected Proposal Documents: The Access Request Link is located below Attachments/Links header. If you cannot request RFP HC102825R0040 protected document access: -Are you logged into SAM? -Are you a registered SAM Point of Contact within your organization? -Is your organization represented by NAICS 337214? -Is your organization an SBA certified Small Business? RFP HC102825R0040 issuing office has limited to zero assistance ability with SAM registrations. Please visit https://sam.gov/help for SAM registration support. Allow up to 5 days before attempting to access controlled documents for recently updated SAM registrations. Allow at least 2 weeks before attempting to access controlled documents for new SAM registrations.
From Solicitation posted on Jul 15, 2025Notice history
2-
Solicitation Posted Jun 04, 2025
-
Solicitation LATEST Posted Jul 15, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jun 30, 2025 → Jul 22, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA