Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 2 notices 4 documents

Data Center San Antonio - Furniture Purchase and Install HC102825R0040

Solicitation HC102825R0040 Copied Notice ID 7bf0e985cbc54bd398f277160465e357 Copied DEPT OF DEFENSE — IT CONTRACTING DIVISION - PL83
SAM.gov
Posted
Jul 15, 2025
Deadline
Jul 22, 2025
Set-aside
SBA
NAICS
337214
PSC
N099

Summary

AI-generated · Aug 23, 2025

Provide and install new systems furniture for Data Center San Antonio, including purchase, delivery, and installation, with electrical and communication cabling connections. Work spans lobby, administrative, and office areas and must render the spaces operational to support mission requirements. Follow the Design Intent Drawings (Appendix A) and the Furniture Installation and General Requirements (Appendix B). Access to protected proposal documents requires submitting an access request and meeting SAM registration/Point of Contact requirements; allow up to 5 days for access after SAM updates and up to 2 weeks for new registrations.

Amendment 0001 changes the period of performance. A subsequent AMD02 notice extends the due date to July 22, 2025 and references attachments for the SAT Furniture RFP and Q&A. The core scope remains the same: furnish and install new systems furniture across the specified spaces, including required cabling.

AMENDMENT 0001 - CHANGE TO PERIOD OF PERFORMANCE. Contractor shall provide and install through purchase, delivery, and installation - new systems furniture, as described in this PWS, as shown on the Design Intent Drawings (Appendix A), and as described in the Furniture Installation and General Requirements (Appendix B). Work shall occur throughout various lobby, administrative and office areas of Data Center San Antonio. Furniture installation includes electrical and communication cabling connections. Furniture installation will render the spaces operational to fulfill mission requirements. Accessing Protected Proposal Documents: The Access Request Link is located below Attachments/Links header. If you cannot request RFP HC102825R0040 protected document access: -Are you logged into SAM? -Are you a registered SAM Point of Contact within your organization? -Is your organization represented by NAICS 337214? -Is your organization an SBA certified Small Business? RFP HC102825R0040 issuing office has limited to zero assistance ability with SAM registrations. Please visit https://sam.gov/help for SAM registration support. Allow up to 5 days before attempting to access controlled documents for recently updated SAM registrations. Allow at least 2 weeks before attempting to access controlled documents for new SAM registrations.

From Solicitation posted on Jun 04, 2025

AMD02: Due date extended to 22 July 2025. See attachments: 1. RFP AMD02 HC102825R0040 SAT Furniture 2. HC102825R0040 Question and Answers. ----------------------------------------------------------------------------------------- AMENDMENT 0001 - CHANGE TO PERIOD OF PERFORMANCE. Contractor shall provide and install through purchase, delivery, and installation - new systems furniture, as described in this PWS, as shown on the Design Intent Drawings (Appendix A), and as described in the Furniture Installation and General Requirements (Appendix B). Work shall occur throughout various lobby, administrative and office areas of Data Center San Antonio. Furniture installation includes electrical and communication cabling connections. Furniture installation will render the spaces operational to fulfill mission requirements. Accessing Protected Proposal Documents: The Access Request Link is located below Attachments/Links header. If you cannot request RFP HC102825R0040 protected document access: -Are you logged into SAM? -Are you a registered SAM Point of Contact within your organization? -Is your organization represented by NAICS 337214? -Is your organization an SBA certified Small Business? RFP HC102825R0040 issuing office has limited to zero assistance ability with SAM registrations. Please visit https://sam.gov/help for SAM registration support. Allow up to 5 days before attempting to access controlled documents for recently updated SAM registrations. Allow at least 2 weeks before attempting to access controlled documents for new SAM registrations.

From Solicitation posted on Jul 15, 2025

Notice history

2
  1. Solicitation Posted Jun 04, 2025 View
  2. Solicitation LATEST Posted Jul 15, 2025
    • Description: Description was updated
    • Response Deadline: Jun 30, 2025Jul 22, 2025

Details

Solicitation number HC102825R0040
Notice ID 7bf0e985cbc54bd398f277160465e357
Notice type Solicitation
Product / Service (PSC) N099
NAICS 337214
Place of performance San Antonio, Texas
Archive date Aug 06, 2025

Award Information

Not yet awarded

Contacts

primary
Eric Mead

Email

secondary
John M. Ross

Email

Agency

DEPT OF DEFENSE
DEFENSE INFORMATION SYSTEMS AGENCY (DISA)
IT CONTRACTING DIVISION - PL83

Place of Performance

San Antonio, Texas 78226
USA

Dates

Posted Jul 15, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 22, 2025 1 year ago