AI-generated · Aug 23, 2025Uninstall outdated equipment and install brand-new items to support a Uninterruptible Power and Cooling Distribution Unit replacement/installation, with a Site Lead/Project Manager to oversee tasks per the Performance Work Statement. Tasks include capturing and re-filling cooling fluid, demolishing existing piping, running new PEX piping to in-row coolers, furnishing and installing a new 350A shut-trip breaker with a NEMA-1 enclosure and tying the existing EPO into the new shunt-trip breaker; shutting down and locking out the existing 3-feeder conduit and wire from the MDP, intercepting the feeder to the line side of the new breaker/enclosure, and installing load-side feeder conduit and wire from the new shunt trip breaker to the new UPS. The contractor will demo the existing UPS, remove it from the data center, dispose/recycle the old unit, install Power Modules and Battery Cabinets, and assume the existing raised-floor structure will support moving the old UPS, with raised-floor modifications handled by others.
Site visit is required on 16 June 2025 at 0900 MDT, located at 217 Dell Rnage Blvd, Cheyenne, WY 82009; if no requests for the site visit are received by 11 June 2025 at 1200 MDT, it will be canceled. Questions are due by 19 June 2025.
The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. 5.3.4 Demo existing piping 5.3.5 Run new Pex piping to the in-row coolers. 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure. Tie existing EPO into new Shunt Trip breaker. 5.3.7 Existing 3 Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS. 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old UPS. 5.3.9 Install Power Modules and Battery Cabinets 5.3.10 Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others. SITE VISIT: 16 JUNE 2025 AT 0900 MDT at 217 Dell Rnage Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 11 JUNE 2025 AT 1200 MDT, IT WILL BE CANCELED. QUESTIONS DUE: 19 JUNE 2025
From Combined Synopsis/Solicitation posted on Jun 02, 2025Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Jun 02, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA