Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice 4 documents

CS UPS & COOLING SYSTEM W50S8W25Q0011

Solicitation W50S8W25Q0011 Copied Notice ID cc9ce8e97d3f424097147dc6413a9472 Copied DEPT OF DEFENSE — W7N9 USPFO ACTIVITY WYANG 153
SAM.gov
Posted
Jun 02, 2025
Deadline
Jul 02, 2025
Set-aside
SBA
NAICS
335999
PSC
6140

Summary

AI-generated · Aug 23, 2025

Uninstall outdated equipment and install brand-new items to support a Uninterruptible Power and Cooling Distribution Unit replacement/installation, with a Site Lead/Project Manager to oversee tasks per the Performance Work Statement. Tasks include capturing and re-filling cooling fluid, demolishing existing piping, running new PEX piping to in-row coolers, furnishing and installing a new 350A shut-trip breaker with a NEMA-1 enclosure and tying the existing EPO into the new shunt-trip breaker; shutting down and locking out the existing 3-feeder conduit and wire from the MDP, intercepting the feeder to the line side of the new breaker/enclosure, and installing load-side feeder conduit and wire from the new shunt trip breaker to the new UPS. The contractor will demo the existing UPS, remove it from the data center, dispose/recycle the old unit, install Power Modules and Battery Cabinets, and assume the existing raised-floor structure will support moving the old UPS, with raised-floor modifications handled by others.

Site visit is required on 16 June 2025 at 0900 MDT, located at 217 Dell Rnage Blvd, Cheyenne, WY 82009; if no requests for the site visit are received by 11 June 2025 at 1200 MDT, it will be canceled. Questions are due by 19 June 2025.

The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. 5.3.4 Demo existing piping 5.3.5 Run new Pex piping to the in-row coolers. 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure. Tie existing EPO into new Shunt Trip breaker. 5.3.7 Existing 3 Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS. 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old UPS. 5.3.9 Install Power Modules and Battery Cabinets 5.3.10 Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others. SITE VISIT: 16 JUNE 2025 AT 0900 MDT at 217 Dell Rnage Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 11 JUNE 2025 AT 1200 MDT, IT WILL BE CANCELED. QUESTIONS DUE: 19 JUNE 2025

From Combined Synopsis/Solicitation posted on Jun 02, 2025

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted Jun 02, 2025 View

Details

Solicitation number W50S8W25Q0011
Notice ID cc9ce8e97d3f424097147dc6413a9472
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 6140
NAICS 335999
Place of performance Cheyenne, Wyoming
Archive date Jul 17, 2025

Award Information

Not yet awarded

Contacts

primary
Kristopher W Kahle

Email

Phone

secondary
Christopher Davalos

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
NATIONAL GUARD BUREAU
W7N9 USPFO ACTIVITY WYANG 153

Place of Performance

Cheyenne, Wyoming 82009
USA

Dates

Posted Jun 02, 2025 1 year ago
Last Updated Aug 06, 2026 1 day ago
Due Jul 02, 2025 1 year ago