***CANCELDED*** Command Post Blackberry/ATHOC Upgrade FA442725Q1138
Summary
AI-generated · Aug 24, 2025Upgrade the Command Post Giant Voice System activation point at Building 31, Room 58 by replacing the Federal Signal SS2000 siren encoder with a computer directly connected to an MSK modem, enabling activation via MSK-based signaling and integration with the AtHoc IP Integration Module. Provide updated wiring diagrams and ensure the new setup can trigger the GVS.
Conduct on-site verification and testing with 60th Communications Squadron personnel to confirm the computer-based activation works and that the AtHoc IP Integration Module properly connects and outputs to the Travis AFB GVS when activated from AtHoc. Deliver and validate the integration with 60th CS, and provide updated wiring diagrams. All new equipment must carry a one-year warranty; contractor must repair or replace defective materials or workmanship within 12 months from acceptance, and a technician must be on-call 24/7.
The objective of this requirement is to upgrade the Command Post AtHOC Internet Protocol (IP) Integration Module (IIM) activation point for the Giant Voice Mass Notification System from a Federal Signal SS2000 siren encoder to a radio directly connected to a computer with a Minimum Shift Keying (MSK) modem. Description: Perform conversion of the Command Post Bldg. 31 Rm 58 Giant Voice System (GVS) activation point from a Federal Signal SS2000 siren encoder to a computer with an MSK modem. Verify and test with 60th Communications Squadron (60th CS) personnel present the computers ability to activate GVS directly. Verify and test AtHoc IP Integration Module connection and output through Travis AFB GVS demonstrating successful activation from AtHoc with 60th CS personnel present. Provide updated wiring diagrams to 60th CS personnel. All new equipment provided should have a one year warranty. The Contractor shall repair or replace any defect material or workmanship of equipment manufactured within 12 months from the date of acceptance. The Contractor shall have a technician available on call 24-7.
From Combined Synopsis/Solicitation posted on Aug 15, 2025Awaiting RFI answers from end-user. Solicitation will be extended to allow time for RFI answers to be posted. The objective of this requirement is to upgrade the Command Post AtHOC Internet Protocol (IP) Integration Module (IIM) activation point for the Giant Voice Mass Notification System from a Federal Signal SS2000 siren encoder to a radio directly connected to a computer with a Minimum Shift Keying (MSK) modem. Description: Perform conversion of the Command Post Bldg. 31 Rm 58 Giant Voice System (GVS) activation point from a Federal Signal SS2000 siren encoder to a computer with an MSK modem. Verify and test with 60th Communications Squadron (60th CS) personnel present the computers ability to activate GVS directly. Verify and test AtHoc IP Integration Module connection and output through Travis AFB GVS demonstrating successful activation from AtHoc with 60th CS personnel present. Provide updated wiring diagrams to 60th CS personnel. All new equipment provided should have a one year warranty. The Contractor shall repair or replace any defect material or workmanship of equipment manufactured within 12 months from the date of acceptance. The Contractor shall have a technician available on call 24-7.
From Combined Synopsis/Solicitation posted on Aug 24, 2025ACQUISITION CANCELED Per Combo/Solicitiation Notice to Offeror(s)/Supplier(s): The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. Awaiting RFI answers from end-user. Solicitation will be extended to allow time for RFI answers to be posted. The objective of this requirement is to upgrade the Command Post AtHOC Internet Protocol (IP) Integration Module (IIM) activation point for the Giant Voice Mass Notification System from a Federal Signal SS2000 siren encoder to a radio directly connected to a computer with a Minimum Shift Keying (MSK) modem. Description: Perform conversion of the Command Post Bldg. 31 Rm 58 Giant Voice System (GVS) activation point from a Federal Signal SS2000 siren encoder to a computer with an MSK modem. Verify and test with 60th Communications Squadron (60th CS) personnel present the computers ability to activate GVS directly. Verify and test AtHoc IP Integration Module connection and output through Travis AFB GVS demonstrating successful activation from AtHoc with 60th CS personnel present. Provide updated wiring diagrams to 60th CS personnel. All new equipment provided should have a one year warranty. The Contractor shall repair or replace any defect material or workmanship of equipment manufactured within 12 months from the date of acceptance. The Contractor shall have a technician available on call 24-7.
From Combined Synopsis/Solicitation posted on Aug 27, 2025Notice history
3-
-
Combined Synopsis/Solicitation Posted Aug 24, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 24, 2025 → Aug 28, 2025
-
Combined Synopsis/Solicitation LATEST Posted Aug 27, 2025View changes (2)
- Title: Command Post Blackberry/ATHOC Upgrade → ***CANCELDED*** Command Post Blackberry/ATHOC Upgrade
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA