Coeur d'Alene Nursery Ammonia Refrigeration System Maintenance and Upgrade 1284LL25Q0058
Summary
AI-generated · Aug 27, 2025Maintain and upgrade an ammonia refrigeration system at Coeur d'Alene Nursery, performing all supplies and services listed in the Schedule. The system was installed in 2003 and has operated since 2004; the software OS is obsolete and many mechanical valve and solenoid components have worn from continuous use.
Familiarize with the system, identify the full type and number of valves to replace, procure the necessary components, install them, and test functionality. The Schedule lists severely failing valves identified by various technicians. Valves vary in type and installation, and some minor re-plumbing corrections may be needed to address prior installation errors, particularly thermosyphon relief valves. All valve and solenoid replacements must be sealed, tested for operation, and surveyed to industry standards.
This solicitation and resultant contract require the Contractor to provide all supplies and services specified in the Schedule. The components were installed as a new system in 2003 and have been in operation since 2004. In addition to the software operating system, which is obsolete, mechanical components of many valves and solenoids have become worn over time due to constant operation since 2004. It will be the responsibility of the contractor to familiarize themselves with the refrigeration system, assess the full type and number of valves to be replaced, procure the necessary components, install them, and test functionality. Assessments by various technicians have located and identified severely failing valves, which are listed in the Schedule. Valves are various in type and installation, and some minor corrections will be required from the Contractor to rectify or re-plumb systems that were previously installed incorrectly, most notably thermosyphon relief valves. All valve and solenoid replacements shall be checked for seal, operation, and survey according to industry standards.
From Combined Synopsis/Solicitation posted on Aug 26, 2025This solicitation and resultant contract require the Contractor to provide all supplies and services specified in the Schedule. The components were installed as a new system in 2003 and have been in operation since 2004. In addition to the software operating system, which is obsolete, mechanical components of many valves and solenoids have become worn over time due to constant operation since 2004. It will be the responsibility of the contractor to familiarize themselves with the refrigeration system, assess the full type and number of valves to be replaced, procure the necessary components, install them, and test functionality. Assessments by various technicians have located and identified severely failing valves, which are listed in the Schedule. Valves are various in type and installation, and some minor corrections will be required from the Contractor to rectify or re-plumb systems that were previously installed incorrectly, most notably thermosyphon relief valves. All valve and solenoid replacements shall be checked for seal, operation, and survey according to industry standards. NOTE: This solicitation has been amended to be solicited unrestricted.
From Combined Synopsis/Solicitation posted on Sep 10, 2025This solicitation and resultant contract require the Contractor to provide all supplies and services specified in the Schedule. The components were installed as a new system in 2003 and have been in operation since 2004. In addition to the software operating system, which is obsolete, mechanical components of many valves and solenoids have become worn over time due to constant operation since 2004. It will be the responsibility of the contractor to familiarize themselves with the refrigeration system, assess the full type and number of valves to be replaced, procure the necessary components, install them, and test functionality. Assessments by various technicians have located and identified severely failing valves, which are listed in the Schedule. Valves are various in type and installation, and some minor corrections will be required from the Contractor to rectify or re-plumb systems that were previously installed incorrectly, most notably thermosyphon relief valves. All valve and solenoid replacements shall be checked for seal, operation, and survey according to industry standards. NOTE: This solicitation has been amended to be solicited unrestricted. NOTE 2: SF-30 for amendment 0001 was just uploaded due to a system error at time of original amendment posting.
From Combined Synopsis/Solicitation posted on Sep 12, 2025Notice history
3-
Combined Synopsis/Solicitation Posted Aug 26, 2025
-
Combined Synopsis/Solicitation Posted Sep 10, 2025View changes (3)
- Description: Description was updated
- Response Deadline: Sep 10, 2025 → Sep 16, 2025
- Set-Aside: Total Small Business Set-Aside (FAR 19.5) → No Set aside used
-
Combined Synopsis/Solicitation LATEST Posted Sep 12, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded