Award Notice 8AN 1 notice

Cochiti Main Building Insulation Replacement W912PP25QA019

Solicitation W912PP25QA019 Copied Notice ID 3720226aa64e47a3bf4bb104a26fc36c Copied DEPT OF DEFENSE — W075 ENDIST ALBUQUERQUE
SAM.gov
Posted
Sep 17, 2025
Deadline
No deadline
Set-aside
8AN
NAICS
238310
PSC
Z2JZ

Summary

AI-generated · Sep 28, 2025

Insulation replacement and electrical retrofit at the Cochiti Dam and Reservoir Maintenance Building: remove the existing ceiling insulation (about 2,450 sq ft) and exterior wall insulation (about 900 sq ft) in the main maintenance bay and welding bay, plus exterior wall insulation (about 1,150 sq ft) in the west bay. Replace with vinyl-faced fiberglass blanket insulation rated at least R-13. During ceiling insulation removal, completely remove lighting fixtures, the suspended ceiling, and abandoned ductwork above it without damaging cabling, fire and security alarm devices, or wiring; dispose of all removed materials and seal any exposed roof and wall voids before installing new insulation. After insulation is installed, install six new linear LED high-bay fixtures (12,000 lumens) directly into existing ceiling junction boxes, replacing boxes if they do not meet current electrical code or are unsafe. Reattach or reinstall fire and security alarm devices near their original locations and tether wiring securely.

All work must comply with applicable state and federal regulations, building codes, and current safety practices. Provide manufacturer manuals for any installed equipment. The project aims to eliminate condensation hazards from failed insulation and to improve the sustainability of the Maintenance Building. This contract was set aside for 8(a) firms as a sole-source action.

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The work will consist of removing the existing insulation on the ceiling (approximately 2,450 sq ft) and exterior walls (approximately 900 sq ft) of the main maintenance bay and welding bay, and the exterior walls only in the west bay of the Maintenance Building (approximately 1,150 sq ft) and replacing it with vinyl-faced fiberglass blanket insulation rated at least R-13. Prior to removal of the existing ceiling insulation in the main maintenance bay the Contractor will completely remove the existing lighting fixtures, the suspended ceiling and the abandoned ductwork above it, being careful to not damage existing cabling, fire and security alarm devices and wiring in the process. The Contractor will also provide the means for, and execute the disposal of, all existing suspended ceiling and insulation materials removed as part of this Statement of Work. The Contractor will ensure that that any exposed voids through the roof and exterior walls are properly sealed prior to installing any new insulation materials. Following the installation of the new insulation materials, the Contractor will install six new linear LED high-bay 12,000-lumen lighting fixtures directly into the existing junction boxes mounted on the ceiling of the main maintenance bay. If needed, the Contractor will replace these junction boxes if they don t meet current electrical code or are otherwise unsafe or obsolete. The Contractor will also reattach or reinstall all fire and security alarm system devices to the main ceiling in the closest vicinity to their original locations and properly tether (using hook-and-loop strips) all existing wiring for those devices. All work will be performed in accordance with all State and Federal regulations and applicable building codes. The Contractor will furnish copies of any and all manufacturer s operation and maintenance manuals associated with this equipment. The intent of this contract is to eliminate the personnel hazards of excess condensation caused by the failed existing insulation. Replacing this insulation will also significantly increase the sustainability of the Cochiti Dam and Reservoir Maintenance Building. All work is to be done according to industry standard practices, within all Federal and State regulations and current building codes, utilizing current safety practices, skills and materials appropriate to this type of work.

From Award Notice posted on Sep 17, 2025

Notice history

1
  1. Award Notice LATEST Posted Sep 17, 2025

Details

Solicitation number W912PP25QA019
Notice ID 3720226aa64e47a3bf4bb104a26fc36c
Award number W912PP25PA032
Notice type Award Notice
Product / Service (PSC) Z2JZ
NAICS 238310
Set-aside 8(a) Sole Source
Place of performance Pena Blanca, New Mexico
Archive date Oct 02, 2025

Award Information

Awardee
1
Total Awarded
$138,121.62
Award Date
Sep 17, 2025

Award Notices

Cochiti Main Building Insulation Replacement View Notice

Posted: Sep 17, 2025

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The work will consist of removing the existing insulation on the ceiling (approximately 2,450 sq ft) and exterior walls (approximately 900 sq ft) of the main maintenance bay and we...

Awardees

Company Name UEI CAGE Code Location
RYMARC CONSTRUCTION INC E4MARCDDH3K3 66JZ9 Albuquerque, NM

Documents

No files available

View on SAM.gov

Contacts

primary
Loretta Sanchez

Email

Phone

secondary
KAREN K IRVING

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTH PACIFIC
W075 ENDIST ALBUQUERQUE

Place of Performance

Pena Blanca, New Mexico 87041
USA

Dates

Posted Sep 17, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Awarded Sep 17, 2025 10 months ago