CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION W51DQV25RA004
Summary
AI-generated · Aug 23, 2025Contract 3 Phase 1 Excavation and Stabilization requests site development to support construction, including dredging, debris removal, installation of sheet piles, and bridge protection measures. Work covers site development of Ciudad Deportiva Roberto Clemente MMA; dredging of ADP SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5; a 3,000-meter access channel across San José Lagoon; bridge fenders to protect Moscoso Bridge piers near the SJL access channel; a 450-meter transition channel between the main channel and SJL; a 900-meter main channel from Barbosa Bridge to the SJL transition channel constructed as a wall-stabilized channel with steel sheet pile walls and a concrete cap, plus about a 61-meter riprap channel at Barbosa Bridge to protect the foundation from scour as flow is reestablished through CMP.
Records 1–3 depict the same scope, with no award data provided (awards show $0.00 and no awardees listed). No changes are noted between notices; the solicitation remains CMP-ERP Contract 3 Phase 1, Excavation and Stabilization and includes the same dredging, debris removal, sheet-pile installation, and bridge-protection elements.
This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.
From Solicitation posted on Jun 25, 2025This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.
From Solicitation posted on Jul 11, 2025This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.
From Solicitation posted on Jul 28, 2025This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.
From Award Notice posted on Sep 30, 2025Notice history
4-
-
Solicitation Posted Jul 11, 2025No changes from previous notice
-
Award Notice LATEST Posted Sep 30, 2025
Details
Award Information
Award Notices
Posted: Sep 30, 2025
This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| NOVEL CONSTRUCTION LLC | Y1VMLB3LNKN9 | 8G3N5 | San Juan, PR |
| N/A | N/A | N/A |
Contacts
Phone
Agency
Place of Performance
00918