Award Notice 4 notices

CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION W51DQV25RA004

Solicitation W51DQV25RA004 Copied Notice ID fd9dc5df29584d5da00b230b2e65c173 Copied DEPT OF DEFENSE — W2SR ENDIST CARIBBEAN(PROVIS)
SAM.gov
Posted
Sep 30, 2025
Deadline
No deadline
Set-aside
None
NAICS
237990
PSC
Z2KB

Summary

AI-generated · Aug 23, 2025

Contract 3 Phase 1 Excavation and Stabilization requests site development to support construction, including dredging, debris removal, installation of sheet piles, and bridge protection measures. Work covers site development of Ciudad Deportiva Roberto Clemente MMA; dredging of ADP SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5; a 3,000-meter access channel across San José Lagoon; bridge fenders to protect Moscoso Bridge piers near the SJL access channel; a 450-meter transition channel between the main channel and SJL; a 900-meter main channel from Barbosa Bridge to the SJL transition channel constructed as a wall-stabilized channel with steel sheet pile walls and a concrete cap, plus about a 61-meter riprap channel at Barbosa Bridge to protect the foundation from scour as flow is reestablished through CMP.

Records 1–3 depict the same scope, with no award data provided (awards show $0.00 and no awardees listed). No changes are noted between notices; the solicitation remains CMP-ERP Contract 3 Phase 1, Excavation and Stabilization and includes the same dredging, debris removal, sheet-pile installation, and bridge-protection elements.

This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.

From Solicitation posted on Jun 25, 2025

This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.

From Solicitation posted on Jul 11, 2025

This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.

From Solicitation posted on Jul 28, 2025

This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic Disposal Pit (ADP) SJ1A with disposal at ADPs SJ2A, SJ3, and SJ4/5, dredging of 3,000 meters-long access channel across San Jos? Lagoon (SJL), bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel, dredging of 450 meters-long transition channel between main channel and SJL access channel, dredging of 900 meters long main channel from the Barbosa bridge to San Jose Lagoon transition channel as a wall-stabilized channel composed of steel sheet pile walls with concrete cap along main channel with natural bottom, and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour associated with reestablishing flow through the CMP.

From Award Notice posted on Sep 30, 2025

Notice history

4
  1. Solicitation Posted Jun 25, 2025 View
  2. Solicitation Posted Jul 11, 2025
    No changes from previous notice
  3. Solicitation Posted Jul 28, 2025
    • Response Deadline: Jul 30, 2025Aug 11, 2025
  4. Award Notice LATEST Posted Sep 30, 2025

Details

Solicitation number W51DQV25RA004
Notice ID fd9dc5df29584d5da00b230b2e65c173
Award number W51DQVCA007
Notice type Award Notice
Product / Service (PSC) Z2KB
NAICS 237990
Archive date Oct 05, 2025

Award Information

Awardees
2
Total Awarded
$57,427,000.00
Award Date
Sep 30, 2025

Award Notices

CANO MARTIN PENA ECOSYSTEM RESTORATION PROJECT (CMP-ERP) CONTRACT 3 PHASE 1, EXCAVATION AND STABILIZATION View Notice

Posted: Sep 30, 2025

This project includes site development to support construction such as dredging, debris removal, installation of sheet piles, and bridge protection measures. The contract includes the site development of Ciudad Deportiva Roberto Clemente (CDRC) Material Management Area (MMA), dredging of the Aquatic...

Awardees

Company Name UEI CAGE Code Location
NOVEL CONSTRUCTION LLC Y1VMLB3LNKN9 8G3N5 San Juan, PR
N/A N/A N/A

Documents

No files available

View on SAM.gov

Contacts

primary
Anika Hillaire

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
W2SR ENDIST CARIBBEAN(PROVIS)

Place of Performance

U.S. Army Corps of Engineers, Caribbean District 383 Franklin D. Roosevelt Ave San Juan, Puerto Rico 00918
00918

Dates

Posted Sep 30, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Awarded Sep 30, 2025 10 months ago