CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Roads 6982AF26B000001
Summary
AI-generated · Jan 30, 2026Improvements to about 56.5 miles of roads inside Mojave National Preserve to improve safety and visitor access. Work includes resurfacing, restoration, and rehabilitation; Kelso-Cima Road (19.3 miles) and South Kelbaker Road (22.3 miles) will undergo full-depth reclamation with new asphalt, widened to 26 feet, with select realignments, and safety enhancements such as rumble strips, signing, pavement markings, and paved pullouts. Morningstar Mine Road (14.9 miles) will be fully reclaimed with a surface-course aggregate, with realignment at the Kelso-Cima and Morningstar intersection. Major quantities indicate roughly 110,000 tons of asphalt concrete pavement, 133,000 tons of roadway aggregate, 81,000 tons of surface aggregate, 110,000 cubic yards of excavation, 49 miles of full-depth reclamation (method 2, 6-inch depth), 17,000 linear feet of concrete barrier for low-water crossings, 44 miles of fencing, tortoise barrier and crossing structures, and 12,000 cubic yards of rip rap.
The project is in a natural-resource sensitive area, with environmental constraints that will affect construction scheduling and methods. Emphasis will be placed on meeting safety and visitor relations needs, traffic control, and timely completion. Prior experience on similarly large highway-rehabilitation projects is required, with an estimated construction duration of 24 to 30 months.
THIS IS NOT AN INVITATION FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. CA NP MOJA 11(2) 10(2) KELSO-CIMA AND KELBAKER ROADS FULL AND OPEN COMPETITION WITH HUBZone PRICE PREFERENCE PROJECT DETAILS: The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access. Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road. The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts. Low water crossings typically consist of buried concrete barriers with riprap revetment. The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection, The estimated cost for the work is between $80,000,000 and $120,000,000. The anticipated advertisement date for the project is February 2026 with construction commencement in early/mid 2026. Construction duration is estimated at 24 to 30 months. The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude in is required. Principle work items include: 110,000 tons of asphalt concrete pavement, 133,000 tons of roadway aggregate, 81,000 tons of aggregate surface course, 110,000 cubic yards of roadway excavation, 49 miles of full depth reclamation, method 2, 6-inch depth, 17,000 linear feet of concrete barrier (low water crossings), 44 miles of fence, tortoise barrier, 2,400 linear feet of tortoise crossing structure, and 12,000 cubic yards of rip rap
From Presolicitation posted on Jan 29, 2026Notice history
1-
Presolicitation LATEST Posted Jan 29, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA