Byron White Courthouse Barrier Replacement EQ8PSCC-25-0023
Summary
AI-generated · Feb 24, 2026Demolish and remove the existing Delta wedge barriers at the Byron White Courthouse garage entrance and exit, and design and construct a new Active Vehicular Barrier (AVB) system using HySecurity StrongArm M30 and M50 barriers to secure the garage, including the necessary supporting infrastructure.
The current wedge barriers are inoperable due to power issues and heavy rust, and they lack safety devices to protect life and property. A HySecurity StrongArm drop arm is required for reliable operation in these conditions. The project is design-build and requires that all work be performed by USMS-approved security installers.
This project is a total small business set a side. The General Services Administration is intiating a design build project to demolish and remove the existing Delta wedge barriers at the garage entrace and exit location located at the Bryon White Courthouse. Upon complete removal of the wedge barriers and components, installation of Hysecurity StrongArm M30 and M50 barriers shall be installed to provide a secure environment to the garage. Currently the existing wedge barriers are inoperable due to current power issues and heavy rust corrosion. The existing setup also does not include safety devices to ensure the safe operation of the wedge barriers to life and property. The USMS require Hysecurity Strong Arm drop arm to provide acceptable operation due to the environmental conditions and proven operation. This project includes a design and construction of a new Active behicular barrier (AVB) system and supporting infrastructure at the garage entrace and exist. Only USMS approved securtiy installers can be used on this project.
From Presolicitation posted on Feb 23, 2026This project is a total small business set a side. The General Services Administration is intiating a design build project to demolish and remove the existing Delta wedge barriers at the garage entrace and exit location located at the Bryon White Courthouse. Upon complete removal of the wedge barriers and components, installation of Hysecurity StrongArm M30 and M50 barriers shall be installed to provide a secure environment to the garage. Currently the existing wedge barriers are inoperable due to current power issues and heavy rust corrosion. The existing setup also does not include safety devices to ensure the safe operation of the wedge barriers to life and property. The USMS require Hysecurity Strong Arm drop arm to provide acceptable operation due to the environmental conditions and proven operation. This project includes a design and construction of a new Active behicular barrier (AVB) system and supporting infrastructure at the garage entrace and exist. Only electrical contractor is required to be USMS approved.
From Presolicitation posted on Feb 24, 2026Notice history
2Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA