Buckley SFB - Daikin Chiller Servicing FA254326Q0025
Summary
AI-generated · Aug 07, 2026Three 200-ton Daikin air-cooled chillers (Model AWV014AFFNGGN00) at Buckley SFB require a one-time corrective action. Tasks include updating the units from beta software to the latest stable manufacturer release, calibrating sensors, integrating the chillers with the existing Building Automation System, and diagnosing and repairing a known compressor degradation issue on all three units. This is not a recurring maintenance contract, but a corrective effort to fix installation issues and recommission the equipment.
Work must be performed and fully certified under UFC 3-410-01 for Heating, Ventilating, and Air Conditioning Systems. The contractor must have the software tools, licensing, and diagnostic equipment to flash firmware and troubleshoot the compressors without voiding existing warranties. Completion is required within 30 days after award, with additional details in the attached RFQ, including the Statement of Work and applicable provisions/clauses.
The 460th Civil Engineering Squadron requires a qualified contractor to handle a recovery project for three (3) 200-ton Daikin air-cooled chillers, specifically Model AWV014AFFNGGN00 located on Buckley SFB. Since their installation in 2018, these units have been running on beta software, so the primary task is to update them to the latest stable manufacturer release. In addition, the contractor shall calibrate the sensors, integrate the chillers with the existing Building Automation System, and specifically diagnose and repair a known compressor degradation issue on all three units. This isn't a standard recurring maintenance contract; it is a one-time corrective requirement designed to fix lingering issues from the original installation and get the units safely recommissioned. The service shall be completed within 30 days after receipt of award. This requirement needs to be accomplished and fully certified under (Unified Facilities Criteria) UFC 3-410-01: Heating, Ventilating, and Air Conditioning Systems. A contractor possessing the software tools, licensing, and diagnostic equipment to flash the firmware and troubleshoot the compressor without voiding existing equipment warranties is required. Please see the attached RFQ document which contains further details regarding this solicitation including the Statement of Work and included provisions/clauses.
From Combined Synopsis/Solicitation posted on Aug 07, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA