B16 Generator PLC Upgrade W50S7X26BA001
Summary
AI-generated · Mar 20, 2026Upgrade the B16 Generator PLC at 52010 Jayhawk Drive, Building 16, McConnell AFB, Wichita, KS. A single firm-fixed-price contract will cover all labor, transportation, materials, tools, equipment, appliances, and supervision to inspect, troubleshoot, and repair or replace the generator PLC controls; restore the PLC to its original installation parameters; verify restored generator operations and communications; and perform a function check of operations in both standalone and parallel modes. Base bid and an option are included; the option would install a Hot Switch Bypass to eliminate single points of failure and allow the current HMI to communicate with each generator’s PLCs.
The prime contractor must subcontract with 3E Company, Kohler’s OEM regional representative. The contract duration is 60 calendar days after notice to proceed, including inspection and punch list. This project is 100% set aside for small businesses. Funds are not currently available for this acquisition, and no contract will be awarded until funds are available.
The Kansas National Guard intends to issue an Invitation for Bids to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the upgrade B16 Generator PLC located at 52010 Jayhawk drive, building 16, McConnell AFB, Wichita Kansas. Line Items will include the Base Bid and an Option. The Base bid work shall consist of but is not limited to the following: Inspect, troubleshoot, and repair or replace generator PLC controls. The contractor is to troubleshoot and repair PLC to original installation parameters, verify restored PLC Generator set operations and communication and ensure repairs with a function check of generator operations in standalone and parallel modes. There is an option line to install a Hot Switch Bypass to remove the single points of failure and allow the current HMI to communicate all operations to each individual generators PLCs. NOTE: Prime contractor is required to subcontract with 3E Company (electrical Engineering and Equipment Co.) since they are the designated OEM regional representative of Kohler. The contract duration will be 60 calendar days after notice to proceed to include inspection and punch list. This project is set aside 100% for Small Businesses. The North American Industry Classification System (NAICS) Code is 238210, with a small business size standard of $19,000,000. The magnitude of construction is between $500,000 and $1,000,000. Funds are not presently available for this acquisition. No contract will be made until appropriate funds are made available.
From Solicitation posted on Mar 19, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
67221