Contacts, documents and full notice history are available with a subscription.
Award Notice 5 notices

Alvin Bush Dam Rock Wall Stabilization, Kettle Creek, Clinton County, PA W912DR26BA002

Solicitation W912DR26BA002 Copied Notice ID 07e66c43478344399bc8f26cd90220e8 Copied DEPT OF DEFENSE — W2SD ENDIST BALTIMORE
SAM.gov
Posted
Jun 10, 2026
Deadline
No deadline
Set-aside
None
NAICS
237990
PSC
Y1PZ

Summary

AI-generated · Jan 29, 2026

Two reinforced concrete rock-anchored walls will be constructed to stabilize the Alvin Bush Dam rock wall along Kettle Creek, preventing progressive rock erosion and rock fall into the spillway that could endanger Kettle Creek Road. The scope includes drainage improvements, paving, grading, spoils management, access roads, stairs, railing, fencing, and other incidental work, delivered under a design-bid-build, firm-fixed-price contract with an estimated construction magnitude between $10,000,000 and $25,000,000.

Obtain the necessary permits to perform the work; at minimum, a permit from the Pennsylvania Department of Environmental Protection National Pollution will be required.

PRE-SOLICITATION NOTICEAlvin Bush Dam Rock Wall StabilizationThe U.S. Army Corps of Engineers (USACE) Baltimore District is procuring a single award contract for a design-bid-build firm-fixed-price contract using the procedures of FAR 14 and 36. The magnitude of construction is between $10,000,000 and $25,000,000. This solicitation will be available on or about 12 February 2026 from the Procurement Integrated Enterprise Environment (PIEE). Related Notices: W912DR25X13XJProject Scope:1. Alvin Bush Dam has a roadway alongside its spillway. The primary features of the dam include an earthen embankment; an uncontrolled spillway with concrete weir; and a gated outlet consisting of a control tower and concrete lined tunnel through bedrock. The wall is approaching 62 years old, is deteriorated, and has nearly eroded back to the state roadway.2. The scope of the project consists of constructing two reinforced concrete rock anchored walls to prevent continued progressive rock erosion which has led to fallen rock accumulation within the spillway and will ultimately lead to failure of Kettle Creek Road. The project also includes proposed drainage improvements, paving, grading, spoils, access roads, stairs, railing, fencing and other work incidental to the related work.3. Obtain the necessary permits to perform the work cited above. As a minimum, a permit from the Pennsylvania Department of Environmental Protection National Pollution will be required.

From Presolicitation posted on Jan 28, 2026

Alvin Bush Dam Rock Wall StabilizationThe U.S. Army Corps of Engineers (USACE) Baltimore District is procuring a single award contract for a design-bid-build firm-fixed-price contract using the procedures of FAR 14 and 36. The magnitude of construction is between Between $25,000,000 and $100,000,000. Related Notices: W912DR25X13XJProject Scope:1. Alvin Bush Dam has a roadway alongside its spillway. The primary features of the dam include an earthen embankment; an uncontrolled spillway with concrete weir; and a gated outlet consisting of a control tower and concrete lined tunnel through bedrock. The wall is approaching 62 years old, is deteriorated, and has nearly eroded back to the state roadway.2. The scope of the project consists of constructing two reinforced concrete rock anchored walls to prevent continued progressive rock erosion which has led to fallen rock accumulation within the spillway and will ultimately lead to failure of Kettle Creek Road. The project also includes proposed drainage improvements, paving, grading, spoils, access roads, stairs, railing, fencing and other work incidental to the related work.3. Obtain the necessary permits to perform the work cited above. As a minimum, a permit from the Pennsylvania Department of Environmental Protection National Pollution will be required.Please see attachments for complete details.

From Solicitation posted on Feb 12, 2026

Alvin Bush Dam Rock Wall StabilizationThe U.S. Army Corps of Engineers (USACE) Baltimore District is procuring a single award contract for a design-bid-build firm-fixed-price contract using the procedures of FAR 14 and 36. The magnitude of construction is between Between $25,000,000 and $100,000,000. Related Notices: W912DR25X13XJProject Scope:1. Alvin Bush Dam has a roadway alongside its spillway. The primary features of the dam include an earthen embankment; an uncontrolled spillway with concrete weir; and a gated outlet consisting of a control tower and concrete lined tunnel through bedrock. The wall is approaching 62 years old, is deteriorated, and has nearly eroded back to the state roadway.2. The scope of the project consists of constructing two reinforced concrete rock anchored walls to prevent continued progressive rock erosion which has led to fallen rock accumulation within the spillway and will ultimately lead to failure of Kettle Creek Road. The project also includes proposed drainage improvements, paving, grading, spoils, access roads, stairs, railing, fencing and other work incidental to the related work.3. Obtain the necessary permits to perform the work cited above. As a minimum, a permit from the Pennsylvania Department of Environmental Protection National Pollution will be required.Please see attachments for complete details.

From Solicitation posted on Apr 02, 2026

Alvin Bush Dam Rock Wall StabilizationThe U.S. Army Corps of Engineers (USACE) Baltimore District is procuring a single award contract for a design-bid-build firm-fixed-price contract using the procedures of FAR 14 and 36. The magnitude of construction is between Between $25,000,000 and $100,000,000. Related Notices: W912DR25X13XJProject Scope:1. Alvin Bush Dam has a roadway alongside its spillway. The primary features of the dam include an earthen embankment; an uncontrolled spillway with concrete weir; and a gated outlet consisting of a control tower and concrete lined tunnel through bedrock. The wall is approaching 62 years old, is deteriorated, and has nearly eroded back to the state roadway.2. The scope of the project consists of constructing two reinforced concrete rock anchored walls to prevent continued progressive rock erosion which has led to fallen rock accumulation within the spillway and will ultimately lead to failure of Kettle Creek Road. The project also includes proposed drainage improvements, paving, grading, spoils, access roads, stairs, railing, fencing and other work incidental to the related work.3. Obtain the necessary permits to perform the work cited above. As a minimum, a permit from the Pennsylvania Department of Environmental Protection National Pollution will be required.Please see attachments for complete details.

From Solicitation posted on Apr 09, 2026

Alvin Bush Dam Rock Wall StabilizationThe U.S. Army Corps of Engineers (USACE) Baltimore District is procuring a single award contract for a design-bid-build firm-fixed-price contract using the procedures of FAR 14 and 36. The magnitude of construction is between Between $25,000,000 and $100,000,000. Related Notices: W912DR25X13XJProject Scope:1. Alvin Bush Dam has a roadway alongside its spillway. The primary features of the dam include an earthen embankment; an uncontrolled spillway with concrete weir; and a gated outlet consisting of a control tower and concrete lined tunnel through bedrock. The wall is approaching 62 years old, is deteriorated, and has nearly eroded back to the state roadway.2. The scope of the project consists of constructing two reinforced concrete rock anchored walls to prevent continued progressive rock erosion which has led to fallen rock accumulation within the spillway and will ultimately lead to failure of Kettle Creek Road. The project also includes proposed drainage improvements, paving, grading, spoils, access roads, stairs, railing, fencing and other work incidental to the related work.3. Obtain the necessary permits to perform the work cited above. As a minimum, a permit from the Pennsylvania Department of Environmental Protection National Pollution will be required.Please see attachments for complete details.

From Award Notice posted on Jun 10, 2026

Notice history

5
  1. Presolicitation Posted Jan 28, 2026 View
  2. Solicitation Posted Feb 12, 2026
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Feb 11, 2026Apr 23, 2026
  3. Solicitation Posted Apr 02, 2026
    • Status: InactiveActive
  4. Solicitation Posted Apr 09, 2026
    No changes from previous notice
  5. Award Notice LATEST Posted Jun 10, 2026

Details

Solicitation number W912DR26BA002
Notice ID 07e66c43478344399bc8f26cd90220e8
Award number W912DR26CA013
Notice type Award Notice
Product / Service (PSC) Y1PZ
NAICS 237990
Archive date Sep 30, 2026

Award Information

Awardee
1
Total Awarded
$17,055,100.00
Award Date
Jun 09, 2026

Award Notices

Alvin Bush Dam Rock Wall Stabilization, Kettle Creek, Clinton County, PA View Notice

Posted: Jun 10, 2026

Alvin Bush Dam Rock Wall StabilizationThe U.S. Army Corps of Engineers (USACE) Baltimore District is procuring a single award contract for a design-bid-build firm-fixed-price contract using the procedures of FAR 14 and 36. The magnitude of construction is between Between $25,000,000 and $100,000,000...

Awardees

Company Name UEI CAGE Code Location
ALLISON PARK CONTRACTORS, INC. H9JEUCAFKBZ5 0J929 GIBSONIA

Documents

No files available

View on SAM.gov

Contacts

primary
Clark Miller

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTH ATLANTIC
ENDIST BALTIMORE
W2SD ENDIST BALTIMORE

Place of Performance

Albin Bush DamKettle Creek, Clinton County, PA
17764

Dates

Posted Jun 10, 2026 2 months ago
Last Updated Jun 12, 2026 1 month ago
Awarded Jun 09, 2026 2 months ago