56--GA-FWS DIVISION OF ENGINEERING-GRAVEL 140F0S25Q0027
Summary
AI-generated · Aug 26, 2025Delivery of 6,500 tons of Georgia DOT standard General Aggregate Base (GAB) with fines, 3,200 tons of #57 stone, and 80 tons of GDOT Type 3 riprap to Piedmont National Wildlife Refuge, GA, with delivery conducted in two phases. Phase 1 covers delivery and tailgate spread of #57 stone to a 3–4 inch depth, with the government performing roadway rehabilitation using the material and a requirement to meet a minimum of 30 loads per day. Phase 2 covers delivery and tailgate spread of GAB to a 5–6 inch depth, with the same 30 loads-per-day minimum. Vendors must provide pricing, confirm delivery dates or propose alternative dates (after deer season), attest that they understand the GDOT GAB, #57 stone, and riprap standards, supply a CAGE Code, and include the specified subject line in communications; a SOW is attached.
Initial inquiry sought capability to supply these materials; the formal solicitation then established the two-phase delivery and spread plan, performance expectations (depths and daily load minimums), and submission requirements (pricing, delivery dates, understanding of specs, CAGE Code). An award has been made to Ecology Mir Group LLC for $342,913.71.
This is a sources sought for 6,500 tons of Georgia Department of Transportation standard General Aggregate Base (GAB) with fines, 3,200 tons of #57 stone, and 80 tons of GDOT type 3 riprap with delivery and tailgate spread to Piedmont National Wildlife Refuge, GA. See attached SOW. Interested vendors please respond back with: 1. CAGE Code 2. Unique Entity ID 3. Confirmation that you are a provider of Georgia DOT spec GAB, #57 stone, and riprap and/or a transportation/logistics firm Please identify "140F0S25Q0027 - Sources Sought for Piedmont NWR" in the subject line of your email
From Sources Sought posted on Jul 15, 2025This is a combined synopsis/solicitation for 6,500 tons of Georgia Department of Transportation standard General Aggregate Base (GAB) with fines, 3,200 tons of #57 stone, and 80 tons of GDOT type 3 riprap with delivery to Piedmont National Wildlife Refuge, GA. NOTE: Material delivery will be done in two phases: 1) Phase one, Delivery and tailgate spread of #57 stone, government will perform all roadway rehabilitation utilizing delivered materials. #57 stone is to be spread to a 3-4" depth. Supply of #57 stone is to meet a minimum of 30 loads per day. 2) Phase two, Delivery and tailgate spread of GAB, government will perform all roadway rehabilitation utilizing delivered materials. GAB is to be spread to a 5-6" depth. Supply of GAB is to meet a minimum of 30 loads per day. See attached SOW in solicitation packet. Vendors are asked to provide: 1. Pricing 2. Confirmation of delivery dates or indicate alternate dates for consideration (after deer season) 3. Statement that the vendor understands the standard for Georgia Department of Transportation standard General Aggregate Base (GAB), #57 stone, and Type 3 RipRap. 4. CAGE Code Please identify "140F0S25Q0027 - Gravel for Piedmont NWR" in the subject line of your email Submit your questions and responses to Robert_Sung@fws.gov
From Combined Synopsis/Solicitation posted on Aug 12, 2025This is a combined synopsis/solicitation for 6,500 tons of Georgia Department of Transportation standard General Aggregate Base (GAB) with fines, 3,200 tons of #57 stone, and 80 tons of GDOT type 3 riprap with delivery to Piedmont National Wildlife Refuge, GA. NOTE: Material delivery will be done in two phases: 1) Phase one, Delivery and tailgate spread of #57 stone, government will perform all roadway rehabilitation utilizing delivered materials. #57 stone is to be spread to a 3-4" depth. Supply of #57 stone is to meet a minimum of 30 loads per day. 2) Phase two, Delivery and tailgate spread of GAB, government will perform all roadway rehabilitation utilizing delivered materials. GAB is to be spread to a 5-6" depth. Supply of GAB is to meet a minimum of 30 loads per day. See attached SOW in solicitation packet. Vendors are asked to provide: 1. Pricing 2. Confirmation of delivery dates or indicate alternate dates for consideration (after deer season) 3. Statement that the vendor understands the standard for Georgia Department of Transportation standard General Aggregate Base (GAB), #57 stone, and Type 3 RipRap. 4. CAGE Code Please identify "140F0S25Q0027 - Gravel for Piedmont NWR" in the subject line of your email Submit your questions and responses to Robert_Sung@fws.gov
From Combined Synopsis/Solicitation posted on Aug 13, 2025GA-FWS DIVISION OF ENGINEERING-GRAVEL
From Award Notice posted on Aug 22, 2025Notice history
4-
-
Combined Synopsis/Solicitation Posted Aug 12, 2025View changes (5)
- Title: 56--Sources Sought for Gravel - Piedmont NWR, GA → 56--Gravel - Piedmont NWR, GA
- Description: Description was updated
- Notice Type: Sources Sought → Combined Synopsis/Solicitation
- Response Deadline: Jul 24, 2025 → Aug 18, 2025
- Set-Aside: None → Total Small Business Set-Aside (FAR 19.5)
-
Combined Synopsis/Solicitation Posted Aug 13, 2025No changes from previous notice
-
Award Notice LATEST Posted Aug 22, 2025
Details
Award Information
Award Notices
Posted: Aug 22, 2025
GA-FWS DIVISION OF ENGINEERING-GRAVEL
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| ECOLOGY MIR GROUP LLC | KH5HQMQVN6A5 | 7DCV4 | FAIRFAX, VA |
Contacts
Phone