5-Ton Electric ARC Furnace W519TC25RA021
Summary
AI-generated · Aug 24, 2025Provide detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training, and the procurement of one 5-ton Electric Arc furnace (with the option for a second) plus supporting equipment such as a baghouse dust collection system, compressed air and argon storage tanks, and one 5-ton AOD system, plus the demolition and removal of the existing 5-ton arc furnace. All materials and labor must make the equipment safely operational and compliant with relevant industry and national standards.
Between notices, the scope remains the same, with Record 2 presenting a presolicitation (early posting) and Record 1 the formal solicitation; there is no substantive change to requirements—only the posting stage. The project still requires full design, installation, commissioning, training, and demolition of the existing furnace, with all necessary materials and labor to meet standards.
Provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc furnace (with the option for a second) and necessary supporting equipment such as bag house dust collection system, compressed Air and Argon storage tanks, (1) 5-ton AOD system, plus the demolition and removal of the existing 5-Ton Arc furnace. These items shall include all materials and labor necessary to make the equipment safely operational and to meet all relevant industry and national standards, per the requirements identified within this document
From Presolicitation posted on Aug 14, 2025Provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc furnace (with the option for a second) and necessary supporting equipment such as bag house dust collection system, compressed Air and Argon storage tanks, (1) 5-ton AOD system, plus the demolition and removal of the existing 5-Ton Arc furnace. These items shall include all materials and labor necessary to make the equipment safely operational and to meet all relevant industry and national standards, per the requirements identified within this document.
From Solicitation posted on Aug 14, 2025Provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc furnace (with the option for a second) and necessary supporting equipment such as bag house dust collection system, compressed Air and Argon storage tanks, (1) 5-ton AOD system, plus the demolition and removal of the existing 5-Ton Arc furnace. These items shall include all materials and labor necessary to make the equipment safely operational and to meet all relevant industry and national standards, per the requirements identified within this document.
From Solicitation posted on Sep 16, 2025Notice history
3-
Presolicitation Posted Aug 14, 2025
-
Solicitation Posted Aug 14, 2025View changes (2)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
-
Solicitation LATEST Posted Sep 16, 2025View changes (1)
- Response Deadline: Sep 15, 2025 → Sep 22, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA