5-Ton Electric ARC Furnace
Description
Provide the following: Detailed design engineering, specification development, project management, equipment installation, concrete work, construction services, equipment commissioning, training and the procurement of (1) 5-Ton Electric Arc furnace (with the option for a second) and necessary supporting equipment such as bag house dust collection system, compressed Air and Argon storage tanks, (1) 5-ton AOD system, plus the demolition and removal of the existing 5-Ton Arc furnace. These items shall include all materials and labor necessary to make the equipment safely operational and to meet all relevant industry and national standards, per the requirements identified within this document.
Award Information
Not yet awarded
Notice Timeline
Presolicitation
Aug 14, 2025
Solicitation
Aug 14, 2025
View changes (2)- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
Place of Performance
USA
Contacts
Christine Szalo
christine.a.szalo.civ@army.mil
520-693-0301
Daniel Sinnott
Daniel.s.Sinnott.civ@army.mil
3097822790