Active registration
Tyne Engineering Inc
Burlington, ON
General information for Tyne Engineering Inc
Physical address
730 Darlene Crt, Burlington, On, L7L 5V1
Mailing address
730 Darlene Crt, Burlington, ON, L7L 5V1
Website
tyneengineering.com
Points of contact for Tyne Engineering Inc
SAM.gov Points of Contact
Kim
Kershner
Government Business POC
Electronic Business POC
730 Darlene Court, Burlington, ON, L7L 5V1
Vince
Robinson
Alternate Government Business POC
Alternate Electronic Business POC
730 Darlene Court, Burlington, ON, L7L 5V1
Additional contact details may be available
NAICS codes for Tyne Engineering Inc
| Code | Description | Small Business |
|---|---|---|
|
334517
PRIMARY
|
Irradiation Apparatus Manufacturing
|
No
|
| 221113 | Nuclear Electric Power Generation | No |
| 334419 | Other Electronic Component Manufacturing | No |
| 334513 | Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables | No |
|
334519
|
Other Measuring and Controlling Device Manufacturing
|
No
|
|
541330
|
Engineering Services
|
No
|
|
541715
|
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
|
No
|
PSC codes for Tyne Engineering Inc
| Code | Description |
|---|---|
| 1140 | NUCLEAR COMPONENTS |
| 4460 | AIR PURIFICATION EQUIPMENT |
| 4470 | NUCLEAR REACTORS |
|
6625
|
ELECTRICAL AND ELECTRONIC PROPERTIES MEASURING AND TESTING INSTRUMENTS
|
|
6630
|
CHEMICAL ANALYSIS INSTRUMENTS
|
|
6640
|
LABORATORY EQUIPMENT AND SUPPLIES
|
|
6660
|
METEOROLOGICAL INSTRUMENTS AND APPARATUS
|
|
6665
|
HAZARD-DETECTING INSTRUMENTS AND APPARATUS
|
|
6680
|
LIQUID AND GAS FLOW, LIQUID LEVEL, AND MECHANICAL MOTION MEASURING INSTRUMENTS
|
|
H144
|
QUALITY CONTROL- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS
|
|
H244
|
EQUIPMENT AND MATERIALS TESTING- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS
|
|
J044
|
MAINTENANCE, REPAIR, AND REBUILDING OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS
|
|
K044
|
MODIFICATION OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS
|
|
N044
|
INSTALLATION OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS
|
|
Z2ME
|
REPAIR OR ALTERATION OF EPG FACILITIES - NUCLEAR
|