Z2DZ--Refeed Electrical from Generator Room to ATS# 3 36C25925Q0638

Solicitation 36C25925Q0638 Copied Notice ID 454433d5b5f54b49b33c44f5799b1a87 Copied VETERANS AFFAIRS, DEPARTMENT OF — NETWORK CONTRACT OFFICE 19 (36C259)
SAM.gov
Posted
Aug 12, 2025
Deadline
Aug 18, 2025
Set-aside
None
NAICS
238210
PSC
Z2DZ

Summary

AI-generated · Aug 24, 2025

Install a new electrical feeder from the generator room to ATS #3 to support critical hospital loads (including MRI) while the facility remains operational. The work must be staged to keep backup power uninterrupted, with the new feeder in place before demolishing the old feeder and tie-in to ATS #3 and Panel EGR. Access will occur in an active emergency department; outages for MRI-related systems are tightly limited (four hours total), and coordination with MRI activities and hospital operations is essential. If both emergency rooms would need to be closed, barriers are required at entrances, and two ER rooms are involved; COR-approved access for the contractor will be badge-controlled, with normal business hours preferred (7:00 a.m.–3:30 p.m.).

The RFQ package includes a detailed Q&A with requirements on scheduling, access, outages, and sequencing, plus an ICRA plan to be provided to bidders. Conduit/wire requirements specify 4/0 conductors with a #4 ground in a 2.5–3 inch conduit, routed within or alongside existing conduits (permanent utilities must be secured and away from damage). An alternate route outside the canopy is not allowed for permanent work. The new feeder must be installed and ready before demolishing the old feeder to maintain continuous service; the EGP panel can be shut off by coordinating with staff, and no separate notice is required for that portion. Work will proceed during normal hours where possible, with a submittal schedule outlining access days prior to start.

Original Sources Sought Notice Posted 07/01/2025 36C25925R0090

From Presolicitation posted on Jul 17, 2025

REQUEST FOR QUOTE (RFQ) 36C25925Q0638

From Solicitation posted on Jul 17, 2025

36C25925Q0638 0001

From Solicitation posted on Jul 26, 2025

RFQ 36C25925Q0638 Refeed Electrical from Generator Room to ATS #3 Vendor Questions and VA answers in red CONTRACTOR Q&As #1 Question No. 1: How many days' notice do we need to provide to access the two ER rooms and pipe out of both? Answer No. 1: Please provide an overall schedule to include the days that you will need access to the rooms as a submittal prior to start of work Question No. 2: How long can each ER be shut down? And can both be shut down simultaneously, or will they need to be phased down? Answer No. 2: Please provide an overall schedule to include the days that you will need access to the rooms as a submittal prior to start of work Question No. 3: Is there a way to coordinate access to the 2 ER Rooms in the same day, shut down the ATS 3, which powers all or most of the hospitals MRI machines, and Panel EGR to tie it all in, in the same week and shut down ATS#3 and the panel feeding it, all in the same week? Answer No. 3: Part 1: both ER rooms would be able to be closed at the same time, in doing so a barrier would have to be placed at the entrances, as only one tile can be out at a time otherwise. Part 2: ATS-3 is critical and down time is limited to four hours in total, it can not be down for a week. Question No. 4: What are the hours we can work, without noise affecting patients with drilling through concrete walls? Answer No. 4: There is no best time to work. Patient occupancy fluctuates. COR work hours are 7:00am to 1530pm. Question No. 5: What are the busiest days for MRIS? Answer No. 5: It varies, as it supports our emergency patients as well as regularly scheduled patients, two weeks notice and coordination will ensure goal is met for outage. Question No. 6: How long can we shut MRIS down? Answer No. 6: No more than 4 hours. Provide schedule of work Question No. 7: Do we need to shut down the Panel EGP, which supplies ATS #3 and features a 225 amp breaker, in order to work on it, or can we work on it while it's live? Answer No. 7: Panel EGP is only energized when the generator is running, there will be no problem in shutting the main breaker off, located left of the panel in generator control gear, as long as electrical staff is made aware at the time, no notice would be required for this portion of the project. Question No. 8. Please confirm award contractor will have access to the emergency room during construction. Answer No. 8: Yes, the contractor will have access to the emergency room, however, the COR will have to badge the contractors in Question No. 9: Since construction will be performed in an active emergency room, will an ICRA plan be provided to all bidders? Answer No. 9: Yes an ICRA will be provided to all bidders Question No. 10: Can the VA specify conduit and wire size/type that needs to be installed? Answer No. 10: 4) 4/0s 1) #4 ground, in a 2 1/2' or 3 conduit, contractor s choice. Question No 11: Can an alternate route be considered? Outside above the canopy walkway possibly? This would keep us from having to go through ER areas. Answer No. 11: Conduit needs to be ran with existing conduits, everything currently ran on the outside is for temporary equipment only, permanent utilities need to be physically secured and away from damage. Question No. 12: Does the new feeder need to be in place and ready to terminate before we can demo the old feeder? Or can we demo old feeder as we install new feeder? Answer No. 12: Yes, new feeder needs to be in place prior to demo of existing feeder, providing continuity of backup generator feed serving critical loads and patients. Question No. 13: Please confirm if we can do all of the install during normal working hours. Answer No. 13: Normal business hours would be best as this is an emergency room, which never shuts down.

From Solicitation posted on Aug 12, 2025

Notice history

4
  1. Presolicitation Posted Jul 17, 2025 View
  2. Solicitation Posted Jul 17, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Jul 17, 2025Aug 18, 2025
    • Set-Aside: Service-Disabled Veteran-Owned Small Business Set AsideNone
  3. Solicitation Posted Jul 26, 2025
    • Description: Description was updated
  4. Solicitation LATEST Posted Aug 12, 2025
    • Description: Description was updated

Details

Solicitation number 36C25925Q0638
Notice ID 454433d5b5f54b49b33c44f5799b1a87
Notice type Solicitation
Product / Service (PSC) Z2DZ
NAICS 238210
Archive date Sep 17, 2025

Award Information

Awardees
0

Contacts

primary
Frances Basham (CO)

Contracting Specialist

Email

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
NETWORK CONTRACT OFFICE 19 (36C259)

Place of Performance

Dates

Posted Aug 12, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 18, 2025 11 months ago