AI-generated · Mar 13, 2026Replace the iDXA scanner and perform minor architectural renovations, install a ceiling-mounted patient lift, and carry out necessary electrical and data upgrades in Room C211, Building 1 at the Cincinnati VA Medical Center. The contractor must provide all supervision, labor, tools, transportation, and all materials, supplies, and equipment needed to complete the work, including conduit, cabling, terminations, and testing, and all work must comply with applicable VA, OSHA, and NIST standards and regulations.
All responsible sources may submit quotations. Bidders must demonstrate SDVOSB eligibility and certified status in SBA records, and must meet related nonmanufacturer and subcontracting requirements if pursuing Veterans First contracts. Joint ventures are allowed if they meet the applicable rules, and a certification of compliance is required to be eligible for award. Debarment can result from willful misrepresentation of SDVOSB status. This notice is a presolicitation and a formal solicitation will be issued later; the Contracting Officer will resolve items not addressed by regulation or policy.
The Cincinnati VA Medical Center has a requirement for the replacement of the iDXA scanner, performing minor architectural renovations, installing a ceiling-mounted patient lift, and making necessary electrical and data upgrades in Room C211 located in building 1 within the Cincinnati VA Medical Center. The contractor shall furnish all supervision, labor, tools, transportation, miscellaneous materials, supplies and equipment necessary for the completion of this work. All services provided under this contract must be performed in conformance with all the applicable regulations, codes standards and specifications, including but not limited to VA, OSHA, NIST requirements, etc. All other materials and activities such as conduit, cabling, terminations and testing shall be provided by the contractor. Definitization of Equitable Adjustments: When/if change orders are issued under the resulting contract, they will be issued under the following authority(s): FAR 52.243-5, Changes and Changed Conditions (APR 1984) (DEVIATION JUL 2025), and VAAR 852.243-70, Construction Contract Changes Supplement (SEP 2019). The agency will following the procedures located at FAR 43, VAAR 843 and VAAM M843. The Contracting Officer will make the final decisions for items not addressed by regulation or policy. All responsible sources may submit a quotation, which will be considered by the agency. At the time of submission of quotes, and at the time of award of any contract, the offeror must represent to the contracting officer that it is an SDVOSB eligible under this subpart, small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition and certified SDVOSB listed in the SBA certification database at https://search.certifications.sba.gov. A joint venture may be considered eligible if it meets the requirements in 13 CFR part 128, and the managing joint venture partner makes the representations. To receive a benefit under the Veterans First Contacting Program, an otherwise eligible SDVOSB/VOSB certified pursuant to 13 CFR 128, must also meet SBA requirements at 13 CFR parts 121, 125, and 128 including the nonmanufacturer rule requirements at 13 CFR 121.406(b) and limitations on subcontracting at 13 CFR 125.6. The nonmanufacturer rule (see 13 CFR 121.406) and the limitations on subcontracting requirements apply to all SDVOSB and VOSB set-aside and sole source contracts above the micro-purchase threshold. In addition, an offeror shall submit a certification of compliance to be considered eligible for any award under this part (see 819.7004). Pursuant to 38 USC 8127(g), any business concern that is determined by VA to have willfully and intentionally misrepresented a company s SDVOSB status is subject to debarment from contracting with the Department for a period of not less than five years. This includes the debarment of all principals in the business. This is not a solicitation. The government intends to issue a solicitation around March 27, 2026. **END OF PRESOLICITATION**
From Presolicitation posted on Mar 12, 2026Replace IDXA C 211 539-26-505
From Solicitation posted on Mar 27, 2026REPLACE iDXA C211 FOR THE VETERANS AFFAIRS MEDICAL CENTER (VAMC) CINCINNATI, OH PROJECT NUMBER: 539-26-505 QUESTIONS AND ANSWERS (RFIs) TO REQUEST FOR QUOTE (RFQ) NUMBER 36C25026Q0375 QUESTIONS AND ANSWERS RFI #1 Question: Given the size of the project, is a dedicated SSHO and the CQ education requirements required? Typically, the Superintendent can be the SSHO and CQC on this size of project, and a superintendent is not going to be a graduate engineer. 1.9 A - 01 35 The Prime Contractor shall provide a minimum of one Full-Time SSHO at each project site, for each shift (with no other duties) that holds as current, a professional safety certification with at least 3 years of dedicated construction safety related experience. 3.4 B 01 45 The CQC system Manager is required to be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of PM or SRE to determine qualifications based on project complexity at construction review 5 years construction. Answer: The superintendent may serve as the SSHO and CQC System Manager. A graduate degree is not required. SSHO must be 30 hours of OSHA training (see spec 01 35 26 parts 1.5F). RFI #2 Question: The solicitation and drawings reference Room C211, while portions of the specifications reference C214. Could you please confirm the correct room designation and whether all documents apply to C211? Answer: The majority of contract documents, including the Statement of Work and full drawing set, identify Room C211 as the correct project location. The specifications, however, contain an incorrect header reference to C214. This appears to be an error in the header only; the specifications do not assign any scope to C214. RFI #3 Question: The SOW indicates that hazardous material testing and abatement will be performed if required. Has a hazardous materials survey already been completed? Should bidders include abatement costs in the base bid, or will this be handled separately by the owner? Answer: The Statement of Work requires the contractor to perform hazardous materials testing and abatement if required. No hazardous materials survey is included in the solicitation, and bidders are not directed to include abatement in the base bid. Contractors should therefore include testing only in their proposals. If hazardous materials are identified during construction, the VA will address any required abatement separately at that time. RFI #4 Question: The drawings don t describe anything about the fume hood for disconnecting. There is power and some other type of gas or air ports and controls on the hood. We need to know how the hood is connected and what is connected to it. Is there piping or conduit behind the hood to be capped and or removed. Is there a drawing of the hood to reference connections? Answer: There are no existing as-built or construction drawings for this fume hood, and its installation date and project of origin are unknown. The fume hood has electrical power and medical gas connections. These utilities must be disconnected and capped. RFI #5 Question: Is there a fan on the roof? If so, does that need to be removed along with any duct in the walls? Answer: There is no roof-mounted fan associated with this fume hood. The hood is not currently connected to any exhaust fan and does not have ductwork running to the roof or through the walls that would require removal therefore no fan removal is required. See picture below of disconnected unit.
From Solicitation posted on Apr 20, 2026Notice history
3-
-
Solicitation Posted Mar 27, 2026View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Set-Aside: Service-Disabled Veteran-Owned Small Business Set Aside → None