Z2DA--Replace Dual Duct Boxes on Second Floor - 539-21-201 36C25026B0042
Summary
AI-generated · Jun 06, 2026Replace dual duct boxes on the second floor of the VA Medical Center in Cincinnati. The work includes asbestos abatement tied to the mechanical demolition per spec 02 82 11, with required containment, 3-stage decontamination, drop cloths, and negative-pressure controls. Abatement in corridors is limited to weekend work (Friday 8:00 PM through Monday 6:00 AM) and corridors must be closed to traffic during those times with coordination to the COR. Lead-based paint has been found on white-painted plaster walls at about 480 ppm; if impacted, follow OSHA regulations and VA specs. The contractor must bid quantities for removal, including Corridor A-2-15 in Corridor C*2*3, and coordinate with the drawings and COR; finish requirements call for a Level 5 paint finish coordinated with attic stock to match existing finishes.
Logistics and requirements: No contractor parking on the VA campus and no guaranteed laydown space—plan accordingly. Power is available; dumpster locations will be coordinated with the COR. Procore construction management software is permitted. The project already provides life-safety drawings; ensure all work complies with the phasing, containment, and safety requirements for abatement and mechanical demolition as specified.
REPLACE DUAL DUCT BOXES ON THE SECOND FLOOR FOR THE VETERANS AFFAIRS MEDICAL CENTER (VAMC) CINCINNATI, OH PROJECT NUMBER: 539-21-201 QUESTIONS AND ANSWERS (RFIs) TO REQUEST FOR INVITATION FOR BID (IFB) NUMBER: 36C25026B0042 QUESTIONS AND ANSWERS : RFI #1 Question: spec 01 00 00 lay down and dumpster area: Where will the laydown and dumpsters area be located? Answer: There is no guarantee of laydown space, contractors shall plan accordingly to support their material. Yes, power is available. Dumpster location will be coordinated with COR. RFI #2 Question: Parking: How many parking spaces will be provided? Answer: Per specification 010000 section: 1.5F2. There will be no parking by any contractors on the VA campus RFI #3 Question: spec 01 35 26 SSHO: Can the superintendent be dual-hatted and fulfill the role of SSHO? Answer: Yes, the superintendent and SSHO can perform both roles RFI #4 Question: spec 02 83 33.13 LBP: Can the government please identify the location and quantities of LBP (lead-based paint) remediation? Answer: The samples tested pertained to painted plaster (white) walls. The analytical results indicated that the white-painted plaster walls contain 480 parts per million (ppm) of lead. If white painted plaster walls are Impacted by the project, contractors should be aware and take the appropriate precautions to comply with OSHA regulations and VA project specifications see lead paint report attached. RFI #5 Question: Procore software: Will the government accept the use of Procore construction management software? Answer: Yes. RFI #6 Question: Life safety drawings: Can the government please provide life safety drawing showing existing smoke and fire walls within the project boundaries? Answer: Existing smoke and fire walls are shown on the drawings. No changes in the safety plan see attached life safety plan. RFI #7 Question: spec 02 82 11 asbestos abatement 1.1.2 extent of work: Is all the ACM removal associated with the mechanical demo? I.E. no abatement is expected to remove mastic etc. on duct, pipe boxes that are not shown for removal. Answer: Yes, the abatement scope is associated with the mechanical demo- see mechanical drawings - see attachment. RFI #8 Question: spec 02 82 11 asbestos abatement 1.1.2 extent of work material locations table: Where is Corridor A-2-15 located? Answer: Contractor to bid quantities for removal. Corridor is C*2*3. Also, corridor A-2-15 is to the north. RFI #9 Question: spec 02 82 11 3.2 removal of ACM/phasing: As the specs call for critical barriers, an attached 3-stage decontamination unit, drop cloths beneath the work, and negative pressure requirements of this specification for any level of abatement. Would the Government allow the phasing for the abatement to include "owning" both sides of the corridors (closed to traffic) for the abatement in the corridors? Answer: All work within corridors shall occur during weekends, between 8PM Friday and 6AM Monday. The corridors shall be opened for normal operations outside of these hours. It is permissible to own both sides (closing traffic) during weekend work. Coordinate with COR. RFI #10 Question: Drawing 1-A001 detail 16 and note 2: 1) Note 2 calls for new wall covering. Does the VA have attic stock to match? If not, can we paint, or please provide the wallpaper manufacturer series and color? 2) detail 16 labels room as C242 is this mislabeled and should be A242? Answer: Paint is an acceptable finish coordinate with COR to match attic stock; the contractor is to provide a level 5 finish from corner to corner. Detail 16 label is mislabeled and should be A242.
From Solicitation posted on Jun 05, 2026Notice history
1Details
Award Information
Contacts
Contracting Officer