Z2DA--OKC Replace Exterior Utility Lines Project 623-24-101 Posted 9-17-25 Closes 10-08-25 36C25925R0112

Solicitation 36C25925R0112 Copied Notice ID 2ce2334fd14d4f0bb869f7cd6ce42f2a Copied VETERANS AFFAIRS, DEPARTMENT OF — NETWORK CONTRACT OFFICE 19 (36C259)
SAM.gov
Posted
Sep 17, 2025
Deadline
Oct 08, 2025
Set-aside
SDVOSBC
NAICS
237110
PSC
Z2DA

Summary

AI-generated · Sep 28, 2025

Replace exterior site water lines at the Jack C. Montgomery VA Medical Center in Muskogee, OK, to separate the existing shared water loop into distinct exterior fire protection and domestic water loops, in accordance with forthcoming design drawings and specifications. The contractor must provide all labor, materials, equipment, and site investigations to remove the current exterior lines, install ductile-iron lines for both loops, place new valves and backflow preventers, and install fire hydrants with proper spacing. Work includes removal/abatement of old lines, temporary phased construction to avoid outages to domestic water or fire protection, and replacement of surface areas (grass/concrete/pavement) over the new lines, plus site visits and acceptance inspections by a qualified inspector.

The contract requires licensing and bonding to perform general contracting in Oklahoma, and the project is estimated at roughly $2–$5 million. Design drawings and specifications will be provided to bidders. The effort also includes coordination for construction period services and compliance with VA acceptance procedures.

THIS IS A PRESOLICIATION NOTICE A REQUEST FOR PROPOSAL WILL BE POSTED ON OR ABOUT OCTOBER 08, 2025. Jack C. Montgomery VA Medical Center (VAMC) Muskogee, OK Replace Exterior Utility Lines Project: 623-24-101 Project Title: Replace Exterior Utility Lines The Jack C. Montgomery VA Medical Center requires a contractor to provide all required labor, material, equipment, and site investigations to perform construction on the Jack C. Montgomery Veteran s Affairs Medical Center (VAMC Muskogee) water loop. VAMC Muskogee currently has fire water and domestic water system supplied from a single loop. The water loop and sewer system have degraded over time and are hard to maintain due inadequate isolations and access points. The contractor will need to replace all exterior site water lines and create a separate fire protection and domestic exterior water loop as called out in the design drawings and specifications that will be provided. Work includes construction period services, site visits, and acceptance inspections by a qualified inspector. This project will require the removal and replacement of all exterior site water lines and create a separate fire protection and domestic exterior water loop for Legionella prevention efforts on the Muskogee campus. Replacement lines shall run to the first valve inside the buildings. The Fire loop shall include new fire hydrants at proper spacing. Project includes removal and/or decommissioning of all replaced lines to include abatement as necessary. The contractor shall phase the installation of the water line and fire lines in such a way to minimize leaving buildings without domestic water or fire protection. The new domestic water and fire line shall have new valves and flow back preventors. All lines shall be ductile iron. New grass/concrete/ pavement shall be installed over the new water lines and disposal of the old water loop. Firms shall be properly licensed and bonded to perform general contracting work in the State of Oklahoma or have equivalent licensing and be approved for such work by the Veteran s Administration. The NAICS code for this procurement is 237110 with a small business size standard of $45 Million. The magnitude of this project is between $2,000,000 and $5,000,000. This project will be 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The POC for this project is Jesus A. Villegas and he can be contacted through email at jesus.villegas@va.gov. Important Notice: Apparent successful offerors must apply for and receive verification from the Department of Veterans Affairs Center for Verification and Evaluation (CVE) in accordance with 38 CFR Part 74 and VAAR 819.7011 by submission of documentation of Veteran status, ownership, and control enough to establish appropriate status. Offerors must be both VISIBLE and VERIFIED by the Department of Veteran Affairs CVE at the time of offer submission. Failure to be both VERIFIED by CVE and VISIBLE on VetCert at the time of offer submission and contract award will result in the offeror s proposal being deemed non-compliant. All offerors are urged to contact the CVE and submit the required documents to obtain CVE verification of their SDVOSB status if they have not already done so.

From Presolicitation posted on Sep 17, 2025

Jack C. Montgomery Veteran s Affairs Medical Center (MUS VAMC) Statement of Work Replace Exterior Utility Lines Construction Project Project Number: 623-24-101 Project Name: Replace Exterior Utility Lines OVERVIEW Request Contractor firm provide all required labor, material, equipment, and site investigations to perform construction on the Jack C. Montgomery Veteran s Affairs Medical Center (VAMC Muskogee) water loop. The Muskogee VAMC currently has fire water and domestic water system supplied from a single loop. This arrangement leads to stagnant water from the fire water system having an increased risk to contaminate domestic water with Legionella. The water loop and sewer system have degraded over time and are hard to maintain due inadequate isolations and access points. We are in need of a contractor to replace all exterior site water lines and create a separate fire protection and domestic exterior water loop as called out in the design drawings and specifications provided. The firm shall provide acceptable electronic services for submittal and document exchange for both design and construction, i.e. Submittal Exchange . Work includes construction period services, site visits, and acceptance inspections by a qualified inspector. Construction includes the following items: Firms shall be properly licensed and bonded to perform general contracting work in the State of Oklahoma or have equivalent licensing and be approved for such work by the Veteran s Administration. This project will require the removal and replacement of all exterior site water lines and create a separate fire protection and domestic exterior water loop for Legionella prevention efforts on the Muskogee campus. Replacement lines shall run to the first valve inside the buildings. The Fire loop Shall include new fire hydrants at proper spacing. Project includes removal and/or decommissioning of all replaced lines to include abatement as necessary. Contractor shall phase the installation of the water line and fire lines in such a way to minimize leaving buildings without domestic water or fire protection. The new domestic water and fire line shall have new valves and flow back preventors. All lines shall be ductile iron. New grass/concrete/ pavement shall be installed over the new water lines and disposal of the old water loop. Contractor shall store all material offsite and only bring in up to 3 days worth of material on site. It is to be documented in the construction documents, the prime construction contractor shall provide engineering and technical support, all manuals, wiring diagrams, and tools necessary for adjusting, maintaining, repairing, and testing of equipment for use by VA engineering staff or VA s designated Maintenance Provider. The above requirements for design will also apply to construction and shall be in accordance with ADA, OSHA, and NFPA requirements. It is to be documented in the construction documents that the prime construction contractor shall provide engineering and technical support, all manuals, wiring diagrams, and tools necessary for adjusting, maintaining, repairing, and testing of equipment for use by VA Engineering staff or VA s designated Maintenance Provider. Construction Prime Contractor shall provide one year of maintenance and inspection service following beneficial use as specified and required within the specifications of this project. The space conditions and the execution of this project shall proceed with minor interference to the operation of the medical center and shall comply with all requirements for infection control, utility interruptions, fire protection, and all other safety requirements of the contract. Contractor Access and Activities Contractor must comply with the VA security management program. Contractors must not enter the work site without VA issued identity Badge. Contractors can be subject to inspection of personal effects when entering or leaving the project site and VA property. Contractor superintendent must escort Contractor employees to Engineering (Building 18) to obtain badge(s). The Contractor must maintain a log of Employee Names, Badge ID Numbers, Start Date(s), Departure Date(s), ID Lost Date(s), and ID Return Date(s). Updated Badge log must be given to the COR weekly or as directed by COR. Contractor s superintendent must return all badges on day of departure of employee from contract to COR. Contractor s superintendent must return all remaining badges at contract closeout to COR. Lost Badges must be reported immediately to the COR and documented on badge log. Contractor is responsible for a $100.00 fee for each lost or unreturned badge to VA. The C&A requirements do not apply; A Security Accreditation Package is not required. Property Access Regular Business Hours: PM must be scheduled during normal business hours, 8:00 am to 4:00 pm, Monday through Friday, excluding the following Federal holidays: The following Federal legal holidays are observed by this facility: New Year s Day January 1 Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in November Veteran s Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25 COR must be informed in the following situations: To schedule any work. After arriving on site but before any work is started. To provide an approximate timeframe for the work. As soon as it is known that the work will take longer than expected. At completion of work prior to leaving the facility. To report any incomplete aspects of the work or issues that could not be corrected during the visit. To furnish a written plan for corrective action for any work that cannot be completed within 24 hours. Plan must be furnished to and approved by the COR. Safety must be the Contractor s highest priority. The Contractor must be in accordance with Federal, State, Local OSHA regulations, latest edition of NEC, latest edition of NFPA 70E, and 01 35 26 Safety Requirements specification. The Contractor must furnish and have in place Personal Protective Equipment (PPE) including, but not limited to, safety signage, cones, and barricades, to protect the safety of VA patients, employees, visitors, volunteers, tenants and others. Contractor must not be permitted to work without proper PPE and can be directed to leave job site. Contractor must furnish required safety items and wear required PPE. Work must be conducted in a manner and at times which would present the least amount of disruption to the VA healthcare facility. Contractors must not leave or unattended out-of-service any utility, fire protection, or security system without written permission of the COR. If a utility, fire protection, or security system is not functioning at the end of a work period without written permission of the COR, then the Contractor must restore the system(s) to working order prior to leaving the jobsite or must furnish an around-the-clock watch until the system is functioning properly. If the Contractor fails to do so, the Contractor must reimburse the Government for any costs incurred by the VA to furnish around-the-clock watch and/or repair the system(s). Vehicles and Construction equipment: Contractors keys to unattended vehicles and equipment must be removed and vehicles locked. Unloading and Parking: No materials or equipment are permitted through the front entry. Use loading dock entrance only for loading and unloading, do not leave vehicle(s) unattended. Contractor parking on VA property is limited to availability of designated Contractor parking. Contractor must have prior written approval of on-site Contractor parking from COR. Contractor parking shall be in lot 4 or at the Hatbox and ride the shuttle up. No parking space shall be reserved for the contractor. Elevators: Contractor must use COR designated elevators and must protect elevator cabs and controls during periods of use. The Contractor must not exceed elevator weight limits. Designated elevator(s) and usage times are not to interfere with VA activities. Radios and Mobile Devices: Contractor must use mobile devices at low volume or outside. The Contractor must not carry on conversations in hallways or near any patient areas. AM/FM radios and other media producing devices must not be used in the buildings. Noise: Contractor must coordinate and schedule noise making activities with the COR. For any noise making work activities, the Contractor must furnish a written request to the COR for COR approval a minimum of seven (7) business days prior to noise making activities. The COR will schedule and provide written authorization to proceed three (3) business days in advance of the proposed activity. Disposal: The Contractor must submit a written request(s) for disposal of any government owned materials, equipment, or property in advance to the COR for COR written approval. Contractor must remove and properly dispose construction debris, materials, equipment, and substances from VA property daily into the Contractor supplied containers. Contractor s supplied dumpsters shall be always covered. Construction debris created from the contract shall not be disposed of at the job site, in VA dumpsters, or on VA property. Disposal of construction debris, materials, equipment, and substances from the contract must be in accordance with applicable Federal, State, Local and environmental laws, rules or regulations. The Contractor must ensure and furnish appropriate documentation to the CO that all hazardous waste handlers, haulers, and disposal facilities are properly licensed. The Contractor must furnish shipping manifest and documentation of proper disposal of any construction debris, materials, equipment, and substances from the contract work prior to final payment. Contractor must return the work site to the condition in which it was found at the Contractor s expense. Warranty: Contractor must guarantee workmanship for a period of one (1) year after COR written acceptance of work. Contractor must furnish a minimum 1-year parts and labor warranty on materials, equipment, parts and components furnished and any manufacturer s warranty greater than one (1) year. In addition to any other warranties in this contract, the Contractor warrants, except as provided in paragraph (m) of this clause, that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier. This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date the Government takes possession. The Contractor shall remedy at the Contractor s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of- The Contractor s failure to conform to contract requirements; or Any defect of equipment, material, workmanship, or design furnished. The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor s warranty with respect to work repaired or replaced will run for 1 year from the date of repair or replacement. The Contracting Officer shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage. If the Contractor fails to remedy any failure, defect, or damage within a reasonable time after receipt of notice, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor s expense. With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall- Obtain all warranties that would be given in normal commercial practice. Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and Enforce all warranties for the benefit of the Government, if directed by the Contracting Officer. In the event the Contractor s warranty under paragraph (b) of this clause has expired, the Government may bring suit at its expense to enforce a subcontractor s, manufacturer s, or supplier s warranty. Unless a defect is caused by the negligence of the Contractor or subcontractor or supplier at any tier, the Contractor shall not be liable for the repair of any defects of material or design furnished by the Government nor for the repair of any damage that results from any defect in Government-furnished material or design. This warranty shall not limit the Government s rights under the Inspection and acceptance clause of this contract with respect to latent defects, gross mistakes, or fraud. Photography: Contractor must not photograph any patients, personnel, visitors, and others on VA property. Contractor must be escorted by VA personnel to take jobsite related photos and be coordinated by COR. Hatbox parking can be located at: 504 S Hatbox Rd, Muskogee, OK 74401 Other requirements: 1. Anything remaining in place that is damaged or defaced by the Contractor must be restored by the Contractor to the existing condition, at no additional expense to the Government. 2. The Contractor must furnish adequate protection to VA property and personnel prior to work activities. Contractor moved items must be put back by the Contractor to original locations and conditions as work is completed, at no additional expense to the Government. 3. No unauthorized work to be initiated without the prior written approval of the CO. 4. Work required for the project must be in accordance with the best practices and in accordance with the intent of the SOW, drawings, and specifications. 5. Utilities and work areas may not be immediately available, and the Contractor must be flexible in the inspections schedule at no additional cost to VA. 6. All OEM recommended safety aspects of the equipment being serviced must be adhered to. Site Visit Information: Contractors will meet at the following location before starting the site visit. It is marked in red below at 1011 Honor Heights Drive Muskogee, OK 74401, meeting in room number 08-18. For parking at Muskogee, OK VA parking should be at lot 14 marked in blue below. Should that parking lot be full, parking is also available at the Hat Box located at: 504 S Hatbox Rd, Muskogee, OK 74401. There is a shuttle that runs back and forth between the parking lot and the hospital, from 7:00 am to 6:00 pm. There will be no equipment provided, i.e., a ladder to get on the roof, light for the basement, etc. If the contractor needs anything, the contractor will have to provide it Construction is to be completed in 940 calendar days from notice to proceed.

From Solicitation posted on Oct 31, 2025

AN AMENDMENT TO SOLICITATION 36C25925R0112 POSTED ON December 02, 2025. The purpose of this amendment is as follows: Proposal due date is going to be extended due to the number of RFI's received. Proposal due date is extended from 12/03/2025 to 12/17/2025 by 2:00PM CST. Proposals need to be submitted via email to contract specialist, Jesus A. Villegas at jesus.villegas@va.gov. All other items and conditions remain the same.

From Solicitation posted on Dec 02, 2025

AN AMENDMENT TO SOLICITATION 36C25925R0112 POSTED ON December 16, 2025. The purpose of this amendment is as follows: Proposal due date is going to be extended due to the RFI's being answered. Proposal due date is extended from 12/17/2025 to 01/06/2025 by 2:00PM CST. Proposals need to be submitted via email to contract specialist, Jesus A. Villegas at jesus.villegas@va.gov. All other Terms and Conditions remain the same.

From Solicitation posted on Dec 16, 2025

AN AMENDMENT TO SOLICITATION 36C25925R0112 POSTED ON December 06, 2026. The purpose of this amendment is as follows: Proposal due date is going to be extended due to the number of RFI's received. Proposal due date is extended from 01/06/2026 to 01/21/2026 by 12:00PM CST. Proposals need to be submitted via email to contract specialist, Jesus A. Villegas at jesus.villegas@va.gov. All other Terms and Conditions remain the same.

From Solicitation posted on Jan 05, 2026

AN AMENDMENT TO SOLICITATION 36C25925R0112 POSTED ON January 21, 2026. The purpose of this amendment is as follows: Post the RFI questions and answers. Post Att 5 12424 Details-REV12.18.2025. Post Att 6 Site Visit and Att 7 Site Visit Attendance document. Post Att 8 Geotechnical Subsurface Investigation Post Att 9 EOVAHCS ICRA Utility Line replacement Post Att 10 DIVISION 01 GENERAL REQUIREMENTS Extend the proposal due date from 01-21-2026 to 01-29-2026 at 12:00AM CST. Proposals need to be submitted via email to contract specialist, Jesus A. Villegas at jesus.villegas@va.gov. All other Terms and Conditions remain the same.

From Solicitation posted on Jan 21, 2026

Notice history

7
  1. Presolicitation Posted Sep 17, 2025
  2. Solicitation Posted Oct 31, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Oct 08, 2025Dec 03, 2025
    • Set-Aside: Service-Disabled Veteran-Owned Small Business Set AsideNone
  3. Solicitation Posted Dec 02, 2025
    • Description: Description was updated
    • Response Deadline: Dec 03, 2025Dec 17, 2025
  4. Solicitation Posted Dec 16, 2025
    • Description: Description was updated
    • Response Deadline: Dec 17, 2025Jan 06, 2026
  5. Solicitation Posted Jan 05, 2026
    • Description: Description was updated
    • Response Deadline: Jan 06, 2026Jan 21, 2026
  6. Solicitation Posted Jan 21, 2026
    • Description: Description was updated
    • Response Deadline: Jan 21, 2026Jan 29, 2026
  7. Award Notice LATEST Posted Jul 07, 2026

Details

Solicitation number 36C25925R0112
Notice ID 2ce2334fd14d4f0bb869f7cd6ce42f2a
Award number 36C25926C0030
Notice type Presolicitation
Product / Service (PSC) Z2DA
NAICS 237110
Place of performance Muskogee, Oklahoma
Archive date Jan 15, 2026

Award Information

Awardee
1
Total Awarded
$8,570,100.00
Award Date
Jun 26, 2026

Awardees

Company Name UEI CAGE Code Location
RANDY KINDER EXCAVATING INC XMKUEVF3NMB5 0E9B3 DEXTER

Documents

1
View on SAM.gov

Contacts

primary
Jesus A. Villegas

Contract Specialist

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
NETWORK CONTRACT OFFICE 19 (36C259)

Place of Performance

Jack C. Montgomery VA Medical Center 1011 Honor Heights Dr
Muskogee, Oklahoma 74401
USA

Dates

Posted Sep 17, 2025 10 months ago
Last Updated Aug 06, 2026 2 days ago
Due Oct 08, 2025 9 months ago