Contacts, documents and full notice history are available with a subscription.
Award Notice VSA 6 notices 1 document

Z2DA--666-26-121_(C) Gillette Small Upgrade Project (VA-26-00006671) 36C25926R0016

Solicitation 36C25926R0016 Copied Notice ID cec17dae3f5c4efbab331940d33f9c87 Copied VETERANS AFFAIRS, DEPARTMENT OF — NETWORK CONTRACT OFFICE 19 (36C259)
SAM.gov
Posted
Nov 19, 2025
Deadline
Feb 19, 2026
Set-aside
VSA
NAICS
236220
PSC
Z2DA

Summary

AI-generated · Nov 20, 2025

Upgrade the Gillette Small Clinic at 604 Express Drive, Gillette, WY, a small upgrade project with an expected value between $100,000 and $250,000. It will be awarded as a 100% Veteran-Owned Small Business (VOSB) set-aside, limited to VIP-listed VOSBs that are SBA-verified at the time of offer submission and again at award. Offers from non-VIP-listed or non-verified firms will be non-compliant, and eligibility is based on VA/VIP listings and SBA verification.

Work is to be performed under the VA Veterans First contracting program, with strict subcontracting limits: the prime VOSB may not pay more than 50% of contract performance to non-VIP-listed VOSBs for services (and for the portion of contracts involving supplies, excluding materials); construction-specific limits are 85% for general construction and 75% for special trade construction. If the contract includes both services and supplies, the 50% limit applies to the predominant portion. For supply contracts from non-manufacturers, the prime must source from a domestic small manufacturer unless a waiver is granted. The prime must comply with applicable VA and SBA small-business rules, and misrepresentation of VOSB status can lead to debarment.

THIS IS A PRESOLICIATION NOTICE A REQUEST FOR PROPOSAL POSTED ON OR ABOUT NOVEMBER 19, 2023. 666-26-121 Gillette Small Upgrade Project. 36C25926R0016 The Contractor/Vendor will Upgrade Gillette Small Clinic at the Gillette Clinic located at 604 Express Drive, Gillette, Wyoming 82718. The NAICS code for this procurement is 236220 with a small business size standard of $45 M. The magnitude of this project is between $100,000 and $250,000. This project will be 100% set-aside for Veteran-Owned Small Businesses, as stated below. The POC for this project will be Elia Ruiz Manzo. She can be contacted at 303-712-5727 or email at Elia-Laritza.Ruiz-Manzo@va.gov. Important Notice: Apparent successful offerors must apply for and receive verification from the Small Business Administration (SBA) through the SBA certification database via 13 CFR Part 128, VAAR 819.7011, and VAAR 819.7003 by submission of documentation of Veteran status, ownership and control enough to establish appropriate status. Offerors must be both VISIBLE and VERIFIED by the SBA certification database at the time of offer submission. Failure to be both VERIFIED by SBA and VISIBLE on the SBA certification database at the time of offer submission and contract award will result in the offeror s proposal being deemed non-compliant. All offerors are urged to contact the SBA and submit the required documents to obtain verification of their SDVOSB status if they have not already done so. 852.219-74 VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside. As prescribed in 819.7011, insert the following clause: VA Notice of Total Set-Aside for Verified Veteran-Owned Small Businesses (NOV 2022) (a) Definition. For the Department of Veterans Affairs, Veteran-owned small business or VOSB : (1) Means a small business concern - (i) Not less than 51 percent of which is owned by one or more Veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more Veteran(s); (ii) The management and daily business operations of which are controlled by one or more Veteran(s); (iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document; (iv) The business has been verified for ownership and control pursuant to 38 CFR part 74 and is listed in VA's Vendor Information Pages (VIP) database at: https://www.vetbiz.va.gov/vip/; and (v) The business will comply with VAAR subpart 819.70 and Small Business Administration (SBA) regulations regarding small business size and government contracting programs at 13 CFR parts 121 and 125, provided that any requirement therein that applies to a service-disabled veteran-owned small business concern or SDVO SBC, is to be construed to also apply to a VA verified and VIP-listed VOSB, unless otherwise stated in this clause. (vi) The term VOSB includes VIP-listed service-disabled veteran-owned small businesses (SDVOSB). (2) Veteran is defined in 38 U.S.C. 101(2). (3) The term small business concern has the meaning given that term under section 3 of the Small Business Act (15 U.S.C. 632). (4) The term small business concern owned and controlled by Veterans has the meaning given that term under section 3(q)(3) of the Small Business Act (15 U.S.C. 632(q)(3)), except that for a VA contract the firm must be listed in the VIP database (see paragraph (a)(1)(iv) of this clause). (b) General. (1) Offers are solicited only from VIP-listed VOSBs, including VIP-listed SDVOSBs. Offers received from entities that are not VIP-listed at the time of offer shall not be considered. (2) Any award resulting from this solicitation shall be made only to a VIP-listed VOSB who is eligible at the time of submission of offer(s) and at time of award. (3) The requirements in this clause apply to any contract, order or subcontract where the firm receives a benefit or preference from its designation as a VOSB, including set-asides, sole source awards, and evaluation preferences. (c) Representation. Pursuant to 38 U.S.C. 8127(e), only VIP-listed VOSBs are considered eligible to receive award of a resulting contract. By submitting an offer, the prospective contractor represents that it is an eligible VOSB as defined in this clause, 38 CFR part 74, and VAAR subpart 819.70. (d) Agreement. When awarded a contract action, including orders under multiple-award contracts, a VOSB agrees that in the performance of the contract, the VOSB shall comply with requirements in VAAR subpart 819.70 and SBA regulations on small business size and government contracting programs at 13 CFR parts 121 and 125, including the non-manufacturer rule and limitations on-subcontracting requirements in 13 CFR 121.406(b) and 125.6. Unless otherwise stated in this clause, any requirement in 13 CFR parts 121 and 125 that applies to an SDVO SBC, is to be construed to also apply to a VIP-listed VOSB. For the purpose of the limitations on subcontracting, only VIP-listed VOSB, (including independent contractors) is considered eligible and/or similarly situated (i.e., a firm that has the same small business program status as the prime contractor). An otherwise eligible firm further agrees to comply with the required certification requirements in this solicitation (see 852.219-75 and/or 852.219-76 as applicable). These requirements are summarized as follows: (1) Services. In the case of a contract for services (except construction), the VOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not VIP-listed VOSBs (excluding direct costs to the extent they are not the principal purpose of the acquisition and the SDVOSB/VOSB does not provide the service, such as airline travel, cloud computing services, or mass media purchases). When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. (2) Supplies/products. (i) In the case of a contract for supplies or products (other than from a non-manufacturer of such supplies), the VOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not VIP-listed VOSBs. When a contract includes both supply and services, the 50 percent limitation shall apply only to the supply portion of the contract. (ii) In the case of a contract for supplies from a non-manufacturer, the VOSB prime contractor will supply the product of a domestic small business manufacturer or processor, unless a waiver as described in 13 CFR 121.406(b)(5) has been granted. Refer to 13 CFR 125.6(a)(2)(ii) for guidance pertaining to multiple item procurements. (3) General construction. In the case of a contract for general construction, the VOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not VIP-listed VOSBs. (4) Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not VIP-listed VOSBs. (5) Subcontracting. A VOSB must meet the NAICS size standard assigned by the prime contractor and be listed in VIP to count as similarly situated. Any work that a first tier VIP-listed VOSB subcontractor further subcontracts will count towards the percent of subcontract amount that cannot be exceeded. For supply or construction contracts, the cost of materials is excluded and not considered to be subcontracted. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the portion of the contract with the preponderance of the expenditure upon which the assigned NAICS is based. For information and more specific requirements, refer to 13 CFR 125.6. (e) Required limitations on subcontracting compliance measurement period. A VOSB shall comply with the limitations on subcontracting as follows: [Contracting Officer check as appropriate.] __By the end of the base term of the contract or order, and then by the end of each subsequent option period; or __By the end of the performance period for each order issued under the contract. (f) Joint ventures. A joint venture may be considered eligible as a VOSB if the joint venture is listed in VIP and complies with the requirements in 13 CFR 125.18(b), provided that any requirement therein that applies to an SDVO SBC is to be construed to also apply to a VIP-listed VOSB. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause will be performed by the aggregate of the joint venture participants. (g) Precedence. The VA Veterans First Contracting Program, as defined in VAAR 802.101, subpart 819.70, and this clause, takes precedence over any inconsistencies between the requirements of the SBA Program for SDVO SBCs and the VA Veterans First Contracting Program. (h) Misrepresentation. Pursuant to 38 U.S.C. 8127(g), any business concern, including all its principals, that is determined by VA to have willfully and intentionally misrepresented a company's VOSB status is subject to debarment from contracting with the Department for a period of not less than five years (see VAAR 809.406-2, Causes for Debarment). (End of clause)

From Presolicitation posted on Nov 19, 2025

INTRODUCTION: The Sheridan, Wyoming Veterans Affairs Healthcare System (VAHCS) has a need for a small upgrade project at its Gillette VA Clinic, located at 604 Express Drive, Gillette, Wyoming 82718. This upgrade project addresses existing down spouts and drainage issues; replaces one exterior door and frame; and remodels the casework, finishes, and furnishings in three locations within the Clinic. General: Construction project is to be completed within 45 calendar days from date of Full Notice to Proceed (NTP). Contractor s schedule shall utilize this entire period of performance in their schedule unless otherwise approved in writing by the Contracting Officer s Representative (COR) and Contracting Officer (CO). The CO may issue an Administrative NTP prior to the Full NTP, which may be used for submittal review and materials/supplies ordering lead time. Contractor shall provide all equipment, materials, supplies, tools, software, supervision, and labor required for this project, which may include, but is not limited to, demolition work, providing negative pressure environment for work, and providing all new equipment, utilities, and room finishes as indicated in the plans, specifications, and this Scope of Work (SOW) per VA construction standards. Safety submittals shall be completed and approved prior to the commencement of on-site construction work. Material selection, equipment, casework, and finishes submittals shall be completed and approved prior to ordering of materials for the project. At least one physical sample of all applicable materials/finishes shall be delivered to the VA COR for review and approval. The VA COR is located at the Sheridan VA Medical Center, at 1898 Fort Road (138), Sheridan, WY, 82801. VA will respond to Requests for Information (RFIs) and review submittals within 14 calendar days after receipt from contractor. The building tenants not in the construction areas will remain at work in the clinic during this project. Patients will remain in the clinic in areas not under construction, so the Contractor must make patient safety and infection control measures a priority. The Contractor shall coordinate work locations and schedules with VA COR so as to minimize impact to building tenants. Contractor shall provide a minimum of 48-hours notice to the COR for scheduling their work, so the clinic staff can be informed and notify their patients. All electrical, carpentry, architectural, mechanical work, product design, project management, installation, finishes work, landscaping, and other work needed on this project shall be provided by the Contractor. All required electrical work shall be installed and terminated by the Contractor. No wiring or cabling shall be abandoned in place. All piping, cabling, and wiring shall be labeled. All cabling and patch cabling shall match the Sheridan VAHCS s station-standard colors. Buried utilities must have tracing wire. The installation must, at a minimum, be in accordance with all applicable Department of Veterans Affairs Design Manuals, VA Publications, Master Construction Specifications, Construction Standards, National Fire Protection Association (NFPA), Underwriters Laboratory (UL), International Building Code (IBC), National Electric Code (NEC), all other applicable building codes and standards, and the VA Information Security Handbook 6500.6, 6550.0, etc. The Contractor shall read and be familiar with the most current editions of the applicable codes, standards, guides, and manuals. Sources can be accessed at the VA Technical Information Library Management System (VA|TIL|MS) (https://vatilms.va.gov/). (Give the page a minute to load.) Any penetrations through any floors, ceilings, or walls shall be fire caulked, or otherwise properly fire sealed, and shall be done in this contract to meet VA standards and NFPA standards. Contractor shall utilize the VAMC s station-standard fire stop products or approved equal product(s). The station-standard products are SpecSeal fire caulk product is SpecSeal SSS Intumescent Firestop Sealant; and, if needed, the SpecSeal Composite Sheet may be used in areas approved by the COR. The Contractor shall inquire of the COR if any existing equipment, fixtures, hardware, doors, frames, or any other property removed is desired to be retained by the VA for reuse elsewhere within the Sheridan VAHCS, at the time of removal. If the VA desires to retain an item, the Contractor shall deliver it to a location designated by the COR. If the VA does not desire to retain an item, the Contractor shall dispose of it properly off-station. The new components installed shall be tested and commissioned, re-certified, and/or tested before VA acceptance. All testing parameters shall be provided by the Contractor with source references to the COR and 3rd-party reviewer before testing begins. Copies of all test reports must be provided to the COR. HVAC systems that have changes made to them as part of this project, beyond diffuser replacement, shall be tested and balanced by the Contractor. Any IT data cables installed or modified as part of this effort shall be tested after installation. Test methods and plans shall be coordinated with the COR. Fire alarm devices that are tied into the building fire alarm system, that are replaced or relocated as a result of this work, shall be tested. The Contractor shall arrange for all required fire alarm testing. If a building s fire alarm system is under warranty, testing must be accomplished by the contractor who holds the warranty. Any fire sprinklers that are relocated as part of this project shall be reviewed and approved by VA Safety prior to installation. All fire sprinkler work shall be coordinated with VA Safety so as to avoid accidentally setting off the system. At the conclusion of the project, the Contractor shall provide the VA with a red-lined set of construction drawings, showing any as-built variations from the plans, as called for in the specifications. The Contractor must repair any damage caused by the Contractor or their subcontractors during this project. Repairs shall be done timely and will be coordinated with the COR. Repairs shall be of equal or better quality and finish than the existing that was damaged. Contractor s work hours shall be between 8:00am-4:30pm Monday-Friday, unless otherwise coordinated with, and approved in advance by, the COR. Noisy work shall not begin prior to 8:00am. Contractors shall not work on weekends, or federal holidays as specified by U.S. Office of Personnel Management (OPM), unless approved in advance by the COR or CO. For approved weekend or holiday work, Contractor must adjust their workers pay accordingly at no additional cost to the VA. (At time of writing, the OPM-specified federal holidays include: New Year s Day, Birthday of Martin Luther King Jr., Washington s Birthday, Memorial Day, Juneteenth National Independence Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.) The Contractor shall repair any disturbed earth around and in the construction areas. This shall include: Removing any clumps or unwanted rocks that have been brought to the surface. Filling in all ruts or depressions with approved fill material, such that the areas are level or at the required slope. Returning the surface cover to what it was before the project, or as called out in the project drawings. In the case of grass, the contractor shall provide topsoil as necessary to provide a good medium for grass growth. If the area(s) cannot be covered by the VA sprinkler system, then the Contractor shall provide for the watering of the new grass until it is established. Any areas that the grass does not take to shall be reseeded under the warranty period. Excessive weeds, as determined by the COR, will not be accepted. The Contractor shall replace any trees, shrubs, or other plants damaged or destroyed during construction, in kind, at no additional cost to VA. Substitutions must be pre-approved by the COR. Contractor shall obtain and pay for all required federal, state, and/or local permits for this project. Contractor shall obtain utility locates for the project areas before beginning any excavation work. Safety and Security: The Contractor shall follow all safety specifications and shall always have an OSHA-30 certified person on-site, at each work location, overseeing the construction. All other Contractors and subcontractors working on-site shall have at least OSHA-10 certifications. Certification copies shall be provided to the COR prior to beginning work. The Contractor shall submit a Site Safety Plan, tailored for the specific project, to the COR for review and concurrence before beginning work on-site. All soil at the Gillette VA Clinic shall be treated as OSHA Type C soil (i.e., no benching). Contractor is responsible for knowing and complying with OSHA requirements as applicable for the project. The Contractor will review the Infection Control Risk Assessment (ICRA) with VA Infection Prevention & Control staff. The Contractor shall implement all protection measures called for as a result of the risk assessment. Some work will be within the clinic, with staff and patients present, so the Contractor shall plan for infection control measures, to include dust containment, sticky walk-off mats, negative pressure with monitoring, use of High-Efficiency Particulate Air (HEPA) filter vacuums, and cleanup to hospital standards. The Contractor shall read and follow the current version of the FMS Safety Plan, which outlines expectations for tool control and safety within the Sheridan VAHCS. Contractor shall distribute the FMS Safety plan to their workers and subcontractors. Contractor shall note this training in their daily logs. For this project, the Superintendent and Site Safety & Health Officer duties may be performed by the same person. General safety requirements: It is vitally important to keep tools and other items, that offer a patient the opportunity for self-harm, under control at all times. Tools, extension cords, and similar items should not be left out unattended where patients can gain access to them. This includes in the open backs of contractor vehicles, trailers, laydown areas, tool carts, etc. Tools should be locked in a job box, some other type of toolbox, or within a trailer or CONEX box that can be secured from unauthorized access as approved by the COR. Contractors shall check their work areas as the day s work progresses for tools left unattended (e.g., screwdriver rolling under furniture, razor blade left in the grass outside, reels of cords that could hang someone). Large storage containers must be locked if not occupied by a staff member and during overnight. Tools and supplies left out in laydown areas must be monitored, as patients can walk the campus. Also, site cleanliness is an OSHA requirement. Badging requirements: All Contractors and subcontractors must obtain a temporary contractor badge from the VA COR before beginning work on-site. A valid (i.e., not expired), Government-issued, photo ID (such as a Driver s License) is required to be issued a badge. Contractors who have a valid PIV Badge or CAC Badge will not need to be issued a temporary badge. (Due to this contract being at the Gillette VA Clinic, and not the Sheridan VA Medical Center, VA COR will coordinate with Contractors during the pre-construction meeting for how badges can be obtained.) For Contractors on-site less than 179 calendar days per year, the above will suffice, and Contractor PIV badges are not needed. An exception to this: a Contractor PIV badge is needed (regardless of work length) within IT closets and other designated secure areas. (For IT closets specifically, it is permissible for just one Contractor with a PIV badge to supervise the work of their contractors at all times within the IT closets.) For Contractors on-site 180 calendar days or more per year, they are required to obtain Contractor PIV badges, which requires fingerprints and a background check process. Contractor PIV badges are valid for 6 months maximum. It is the Contractors responsibility to ensure their badges stay valid and are renewed timely. Contractor shall check with COR at pre-construction meeting for the most-current badging requirements and for beginning the Contractor PIV badge process, as required. Contractor will be provided space for one Conex/storage container on-site at the Gillette VA Clinic, if necessary, to use during this project. This space will be assigned by the COR or CO after contract award. Phasing There are no prescribed phases for this project. Contractor must submit a proposed schedule for review and approval by both the COR and CO before beginning any work on-site for this project. The Contractor s schedule must allow for 48-hours minimum inspection time by the COR and/or VA for completed work. The Contractor must propose a phasing plan for review and approval by both the COR and CO before beginning any work on-site for this project. The order of work on the different phases shall be coordinated closely with the COR. Contractor shall provide 48-hours minimum advance notice of planned work, so COR can inform the staff and occupants in the area. More than one area may be worked on concurrently. However, Contractor must plan their work to minimize impact to patients and staff to the extent possible, including the duration of work in occupied rooms and patient-care spaces. Contractor shall provide and post the signage necessary to guide patients to alternate check-in/out areas during construction (e.g., when Reception casework is being repaired/replaced). Signage wording shall be approved by the VA COR and/or clinic staff before posting. Contractor must maintain ADA access to the Patient Restrooms (Rooms 135 and 138), throughout the Waiting Room 102, and all Corridors in the clinic throughout construction. If an exit needs to be blocked, the Contractor must notify the COR at least 48 hours in advance, so an Interim Life Safety Measure (ILSM) can be filed, posted, and implemented. The Contractor s schedule must allow for 48-hours minimum inspection (and cleaning) time by the COR and/or VA for completed work. Contractor shall relocate the existing furniture, per the COR s guidance, as needed for the staff to have temporary workstations elsewhere while the casework is being repaired/replaced. (VA IT staff, or Clinic staff, will relocate computer workstations and phones as required.) Work shall include: Base Bid: Contractor s work shall include all items listed herein this SOW and in the drawings, specifications, and details provided, unless items are specifically called out as VA-provided materials or labor. **Contractor shall field verify all quantities, sizes, dimensions, and field conditions and receive approved submittals before ordering or using products and supplies for this project. Alternates: There are no additive/deductive bid alternates for this project. Description of work: The existing downspouts at the Gillette clinic have elbows just above the ground and surface drain without splash blocks into rock planter beds. The clinic has had issues with settling in the planter beds and water infiltrating its basement due to drainage issues. This project shall correct the existing downspouts, so they drain properly away from the building. The west exterior door and frame have settled since the building was constructed in 2009. This has caused intermittent issues with the door operation and its hardware. Contractor shall demolish and replace this existing door and its frame, as well as all associated hardware and accessories needed for a fully-functional, compliant, and safe system. The existing door is insulated hollow-metal and has a powered door operator with ADA push buttons. Contractor shall make the adjustments necessary to ensure the new door and frame are plumb and level. Contractor shall also replace the existing concrete door sill and sill plate. Work shall be according to the drawings, details, and specifications. The existing casework at the Gillette clinic s Reception area ( Room 104 ), HIPPA check-in area ( Room 103 ), and Nurses Station ( Room 107 ) shall be demoed, procured, and replaced per the drawings, details, and specifications for this project. The existing casework is damaged in areas, particularly its laminate finishes. This is an infection prevention and control issue because it cannot be cleaned properly with healthcare-grade cleaners. Also, a few areas may present safety hazards where the laminate is peeling or where the casework has been damaged. These need to be corrected to ensure staff, Veteran, and visitor safety into the future and to extend the life of the casework. Contractor shall install, or relocate existing, power and data outlets for the workstations per the drawings, details, and specifications. Contractor shall demo and replace the finishes (e.g., flooring, paint) as scheduled in the project plans. The Contractor shall provide storage for all materials, equipment, and new furniture until they are installed. The furniture storage must be climate-controlled and meet the manufacturers specifications to protect the furniture and finishes from damage. The existing furnishings within scope that are not scheduled for re-use shall be retained for VA use elsewhere within the clinic or VAHCS. List of VA-Provided Items/Services: The VA will provide and install the desktop sit-to-stands. VA IT will provide and install the workstation computers, phones, and patch cabling from the walls to the workstations. VA will provide and install surge protectors for the workstations if needed. VA COR works in Sheridan, WY but will make periodic trips to Gillette as needed for coordination and quality assurance. (Contractor must be responsible for quality control.) End of Statement of Work

From Solicitation posted on Nov 26, 2025

AN AMENDMENT TO SOLICITATION 36C25926R0016 POSTED ON DECEMBER 5, 2025. The purpose of this amendment is to : Reschedule the Site visit to December 19, 2025, at 11 AM. MT, please meet outside in front of the clinic located at 604 Express Drive, Gillette, Wyoming 82718. To extend due date for proposals from December 19, 2025, to January 6, 2026, at 10 AM .MT Questions related to this project due date December 23, 2025, by 10 AM. MT All Terms and Conditions remain the same.

From Solicitation posted on Dec 05, 2025

AN AMENDMENT TO SOLICITATION 36C25926R0016 POSTED ON DECEMBER 30, 2025. The purpose of this amendment is to : The purpose of this amendment is as follows: To extend due date for proposals from January 6, 2026, at 10 AM .MT to January 9, 2026, at 10 AM.MT. To post answers to RFR s from site visit. To Post ICRA requirements. To post site visit documents, All offers please email them to Elia L Ruiz Manzo at Elia-Laritza.Ruiz-Manzo@va.gov. All other items and conditions remain the same.

From Solicitation posted on Dec 30, 2025

AN AMENDMENT TO SOLICITATION 36C25926R0016-0003 POSTED ON JANUARY 06, 2026. The purpose of this amendment is as follows: To Post new Wage Determination as per January 02,2026. Due date for proposals remains the same January 9, 2026, by 10 AM.MT. All other items and conditions remain the same.

From Solicitation posted on Jan 06, 2026

Notice history

6
  1. Presolicitation Posted Nov 19, 2025
  2. Solicitation Posted Nov 26, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Feb 19, 2026Dec 19, 2025
    • Set-Aside: Veteran Set AsideNone
  3. Solicitation Posted Dec 05, 2025
    • Description: Description was updated
    • Response Deadline: Dec 19, 2025Jan 06, 2026
  4. Solicitation Posted Dec 30, 2025
    • Description: Description was updated
    • Response Deadline: Jan 06, 2026Jan 09, 2026
    • Set-Aside: NoneService-Disabled Veteran-Owned Small Business Set Aside
  5. Solicitation Posted Jan 06, 2026
    • Description: Description was updated
  6. Award Notice LATEST Posted Feb 03, 2026

Details

Solicitation number 36C25926R0016
Notice ID cec17dae3f5c4efbab331940d33f9c87
Award number 36C25926C0022
Notice type Presolicitation
Product / Service (PSC) Z2DA
NAICS 236220
Set-aside Veteran Set Aside
Place of performance Gillette, Wyoming
Archive date May 20, 2026

Award Information

Awardee
1
Total Awarded
$149,144.00
Award Date
Feb 03, 2026

Awardees

Company Name UEI CAGE Code Location
BJF GROUP JV LLC MBBQCVFD7JC1 17MM1 ANNAPOLIS

Documents

1
View on SAM.gov

Contacts

primary
Elia Laritza Ruiz Manzo

Contract Specialist

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
NETWORK CONTRACT OFFICE 19 (36C259)

Place of Performance

Department of Veterans Affairs Gillette VA Clinic
located at 604 Express Drive, G
Gillette, Wyoming 82718

Dates

Posted Nov 19, 2025 8 months ago
Last Updated Aug 06, 2026 2 days ago
Due Feb 19, 2026 5 months ago