AI-generated · Jan 21, 2026

Replace three 600 HP firetube boilers at the Durham VA Medical Center, including removal and disposal of existing underground fuel-oil storage tanks and boilers, and the installation of two temporary boilers to carry steam demand during the replacement. If one temporary boiler fails, a trailer-mounted temporary boiler must be available within 48 hours to maintain steam until the failed boiler (building 24) is back in service. Also install a new sprinkler system in Buildings 7 (boiler plant) and 9 (chiller plant). The work is planned to proceed in VA working hours with first-shift construction (7:00 a.m.–3:30 p.m., Mon–Fri) and second-shift utility work (3:00 p.m.–11:30 p.m.) in the East and West parking lots, with phasing to restore parking areas by the end of each shift and outages limited to second shift or weekends, coordinated with the VA CO/Cor at least four weeks in advance.

The notice is a market-scan to gauge capability and竞争 for a project estimated in the $10–$20 million range, with an anticipated duration of about 574 days from award. Responses will inform acquisition strategy and potential set-aside decisions, including SDVOSB/VOSB considerations if there is adequate competition; otherwise, an alternate set-aside or full and open competition may be pursued.

THIS IS A SOURCES SOUGHT NOTICE ONLY. This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. No formal solicitation document exists at this time. We are seeking information for market research purposes only. The Government will not pay for any information solicited. The VHA Network Contracting Office 6 (NCO 6) is conducting a market survey to find qualified vendors to provide all labor, materials, tools, equipment, transportation, supervision, coordination, and services necessary for replacing three (3) firetube boilers at the Durham VA Medical Center Campus. Scope includes and is not limited to: Removal, disposal, and replacement of existing underground fuel-oil storage tanks and boilers Install two temporary boilers while the three permanent 600 HP boilers are being replaced. Should one of the Temporary Boilers fail, the Contractor should have a trailer mounted temporary boiler within 48-hours to fulfill the steam requirement until the failed boiler in building 24 is returned to service. Install new sprinkler system in Buildings 7 (boiler plant) and 9 (chiller plant) Construction shall be performed during VA working 1st shift, 7AM-3:30PM, Monday-Friday. Utility work in the East and West parking lots shall be performed during VA working 2nd shift, 3 PM 11:30 PM Contractor shall phase construction in either the East or West Parking to return spaces to normal usage at the end of all shifts. Any construction that requires utility outage shall take place during second shift or during the weekend. Coordinate shutdowns with the VA COR 4-weeks in advance. The proposed NAICS 236220 Commercial and Institutional Building Construction is applicable to this acquisition; with a size standard of $45.0 Million. The anticipated Magnitude of Construction is between $10,000,000.00 and $20,000,000.00. The anticipated Period of Performance is 574 days from the Notice to Proceed. Small Business Requirements For market research purposes, all responses to this notice will be reviewed, regardless of small business/socioeconomic category, including those firms that are identified as large businesses. Review of responses to this notice will support later determination of acquisition strategy and set-aside requirements if a solicitation becomes available. Pursuant to 38 U.S.C. 8127(d), acquisitions will be set-aside for SDVOSBs or VOSBs, registered in the SBA VetCert database, whenever there is a reasonable expectation of receiving two or more offers/quotes from eligible, capable and verified firms, and that an award can be made at a fair and reasonable price that offers best value to the Government. However, if responses from qualified firms prove inadequate, an alternate set-aside or full and open competition may be considered. Instructions: All interested parties should respond, in writing via email to alice.custis@va.gov. No telephone inquiries will be accepted. Your response is required by 5:00 PM EDT on Wednesday, February 4 , 2026. In your response, please include the following: Company name Address Point of contact with email and phone number SAM Unique Entry ID number (see https://www.sam.gov for more information) Company Socio-Economic SIZE (example large, small, SDVOSB, VOSB, WOSB etc.) Proposed NAICS code or PSC (if different from above) Capabilities statement, to include experience with contracts of similar scope and magnitude Brief explanation of how company will comply with the limitations on subcontracting (if applicable) In addition to this information, please include responses to all of the following in your submission: What additional information would you require in order to provide a quote for this project? Approximately how long would it take to complete the project, including lead times for materials? Is the anticipated period of performance reasonable? If not, what would you recommend? Is 48 hours enough time to get a temporary boiler? What is a reasonable time expectation to allow for one to be procured and brought to the site? What are the cost implications between 48 hours for a temporary boiler and what you are proposing as the reasonable time expectation? What impact do the working hours or the requirement for a four-week shutdown have on the schedule or the pricing? Is our anticipated Magnitude of Construction appropriate for this project? Is there anything that would deter you from responding to this requirement?

From Sources Sought posted on Jan 20, 2026

THIS IS A SOURCES SOUGHT NOTICE ONLY. This notice does NOT constitute a request for proposal, request for quote, or invitation for bid. No formal solicitation document exists at this time. We are seeking information for market research purposes only. The Government will not pay for any information solicited. The VHA Network Contracting Office 6 (NCO 6) is conducting a market survey to find qualified vendors to provide all labor, materials, tools, equipment, transportation, supervision, coordination, and services necessary for replacing three (3) firetube boilers at the Durham VA Medical Center Campus. Scope includes and is not limited to: Removal, disposal, and replacement of existing underground fuel-oil storage tanks and boilers Install two temporary boilers while the three permanent 600 HP boilers are being replaced. Should one of the Temporary Boilers fail, the Contractor should have a trailer mounted temporary boiler within 48-hours to fulfill the steam requirement until the failed boiler in building 24 is returned to service. Install new sprinkler system in Buildings 7 (boiler plant) and 9 (chiller plant) Construction shall be performed during VA working 1st shift, 7AM-3:30PM, Monday-Friday. Utility work in the East and West parking lots shall be performed during VA working 2nd shift, 3 PM 11:30 PM Contractor shall phase construction in either the East or West Parking to return spaces to normal usage at the end of all shifts. Any construction that requires utility outage shall take place during second shift or during the weekend. Coordinate shutdowns with the VA COR 4-weeks in advance. The proposed NAICS 236220 Commercial and Institutional Building Construction is applicable to this acquisition; with a size standard of $45.0 Million. The anticipated Magnitude of Construction is between $10,000,000.00 and $20,000,000.00. The anticipated Period of Performance is 574 days from the Notice to Proceed. Small Business Requirements For market research purposes, all responses to this notice will be reviewed, regardless of small business/socioeconomic category, including those firms that are identified as large businesses. Review of responses to this notice will support later determination of acquisition strategy and set-aside requirements if a solicitation becomes available. Pursuant to 38 U.S.C. 8127(d), acquisitions will be set-aside for SDVOSBs or VOSBs, registered in the SBA VetCert database, whenever there is a reasonable expectation of receiving two or more offers/quotes from eligible, capable and verified firms, and that an award can be made at a fair and reasonable price that offers best value to the Government. However, if responses from qualified firms prove inadequate, an alternate set-aside or full and open competition may be considered. Instructions: All interested parties should respond, in writing via email to alice.custis@va.gov. No telephone inquiries will be accepted. Your response is required by 5:00 PM EDT on Wednesday, February 4 , 2026. In your response, please include the following: Company name Address Point of contact with email and phone number SAM Unique Entry ID number (see https://www.sam.gov for more information) Company Socio-Economic SIZE (example large, small, SDVOSB, VOSB, WOSB etc.) Proposed NAICS code or PSC (if different from above) Capabilities statement, to include experience with contracts of similar scope and magnitude Brief explanation of how company will comply with the limitations on subcontracting (if applicable) In addition to this information, please include responses to all of the following in your submission: What additional information would you require in order to provide a quote for this project? Approximately how long would it take to complete the project, including lead times for materials? Is the anticipated period of performance reasonable? If not, what would you recommend? Is 48 hours enough time to get a temporary boiler? What is a reasonable time expectation to allow for one to be procured and brought to the site? What are the cost implications between 48 hours for a temporary boiler and what you are proposing as the reasonable time expectation? What impact do the working hours or the requirement for a four-week shutdown have on the schedule or the pricing? Is our anticipated Magnitude of Construction appropriate for this project? Is there anything that would deter you from responding to this requirement?

From Sources Sought posted on Jan 21, 2026

Notice history

2
  1. Sources Sought Posted Jan 20, 2026
  2. Sources Sought LATEST Posted Jan 21, 2026
    • Response Deadline: Feb 10, 2026Feb 04, 2026

Details

Solicitation number 36C24626B0020
Notice ID c8eaddafbdf14687a03e8c574dced8e7
Notice type Sources Sought
Product / Service (PSC) Z1NB
NAICS 236220
Place of performance Durham, North Carolina
Archive date Mar 12, 2026

Award Information

Awardees
0

Documents

1
View on SAM.gov

Contacts

primary
Alice Custis

Contracting Specialist

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
246-NETWORK CONTRACTING OFFICE 6 (36C246)

Place of Performance

508 Fulton St
Durham, North Carolina 27705
USA

Dates

Posted Jan 20, 2026 6 months ago
Last Updated Aug 06, 2026 1 day ago
Due Feb 10, 2026 5 months ago