Contacts, documents and full notice history are available with a subscription.
Presolicitation SDVOSBC 2 notices 1 document

Z1LZ--621-26-S-006 Campus Wide Stripping & Painting 36C24926B0004

Solicitation 36C24926B0004 Copied Notice ID f69d62294b8f4ea384b5e935f37d8477 Copied VETERANS AFFAIRS, DEPARTMENT OF — 249-NETWORK CONTRACT OFFICE 9 (36C249)
SAM.gov
Posted
May 04, 2026
Deadline
No deadline
Set-aside
SDVOSBC
NAICS
237310
PSC
Z1LZ

Summary

AI-generated · Apr 16, 2026

Campus-wide striping and pavement marking is required at the James H. Quillen Veterans Affairs Medical Center, including re-striping all parking spaces, directional arrows, crosswalks, handicap spaces, and fire lanes, plus the addition of 50 ADA early-warning tiles. A 65-by-5 concrete walkway must be installed from the healing garden walkway to S. First St, with saw-cut joints every 5 feet and control joints at existing concrete, removal of excavated dirt, and re-seeding with grass to match surrounding areas.

Work includes surface preparation, coordination of traffic shutdowns with the COR, and use of durable, regulatory-compliant traffic paint in white (parking lines), yellow (arrows/no-parking), blue (handicap), and red (fire lanes), with stencils as needed and reflective beads if specified. Re-striping will occur on all four parking levels with consistent dimensions, along with refreshed pedestrian markings, and updated handicap, fire-lane, and no-parking zones. ADA ramps will be prepared for and receive 50 ADA tiles, with saw-cutting as needed; ramp surfaces will be painted as directed. Safety measures, after-hours and weekend work, OSHA compliance, final walkthrough, cleanup, and a final report are required. Major pavement repairs are excluded, and no warranty is provided.

621-26-S-006 - Campus Wide Stripping & Painting STATEMENT OF WORK Campus Wide Striping and Painting Services at James H. Quillen Veterans Affairs Medical Center (JHQVAMC) Objective This Scope of Work outlines the tasks, materials, and responsibilities for re-striping services at Different parking lots located at the Mt Home VAMC. The objective is to refresh and enhance the existing pavement markings to improve visibility, safety, and traffic flow for vehicles and pedestrians. The project includes re-stripping parking spaces, directional arrows, crosswalks, handicap spaces, ADA Access Early warning tiles (50), and other necessary markings across all parking areas; Prepare area and Install 65 X5 concrete walkway from existing healing garden walkway to S. First St sidewalk. Saw cut joints every 5 and use control joints at existing concrete. Remove excavated dirt from the site and sow in grass to match. Performance Period: 365 calendar days after issuance of the Notice to Proceed (NTP). Scope of Work Site Preparation Clean all surfaces to be re-striped by sweeping, power washing, or other methods to remove dirt, debris, oil stains, and loose paint, ensuring proper adhesion of new markings. Coordinate traffic shutdowns with COR. Materials and Specifications Use high-quality, durable traffic paint suitable for concrete surfaces and compliant with local regulations. Colors: White for standard parking lines, yellow for directional arrows and no-parking zones, blue for handicap spaces, and red for fire lanes (or as specified by client/local codes). Ensure all markings meet American Disability Act standards for handicapped spaces, including size, spacing, and signage. Provide stencils for arrows, numbers, letters, and symbols as needed. Re-Striping Execution Parking Spaces: Re-stripe all parking lines on each of the 4 floors, maintaining consistent dimensions (e.g., 9 ft wide x 18 ft long for standard spaces, or as per existing layout). Directional Markings: Refresh arrows, lane dividers, and stop bars to guide traffic flow. Pedestrian Areas: Stripe crosswalks, walkways, and loading zones with appropriate hatching or solid fill. Specialty Markings: Update handicap spaces, fire lanes, no-parking zones, and reserved parking areas with clear, legible markings. Apply reflective beads or additives to paint (if specified) to enhance visibility in low-light conditions. Concrete walkway Prepare area and Install 65 X5 concrete walkway from existing healing garden walkway to S. First St sidewalk. Saw cut joints every 5 and use control joints at existing concrete. Remove excavated dirt from the site and sow in grass to match. ADA Access Early warning tiles (50) Prepare the existing access ramps to receive ADA Access Early Warning Tiles (quantity: 50), with the final locations to be determined. Cut the existing concrete for the installation of Access Early Warning tiles, ensuring that the tiles do not create a tripping hazard and paint the ramps. Quality Control Ensure straight, clean lines with no overspray or smudging. Verify compliance with the original layout or approved updated design plan. Conduct a final walkthrough with the property manager or designated representative to confirm satisfaction with the work. Safety and Traffic Management Install temporary signage, cones, and barriers to cordon off work areas and ensure the safety of workers, vehicles, and pedestrians. Work in sections to be done after hours and on weekends. Adhere to Occupational Safety and Health Administration safety standards and local traffic control requirements. Cleanup and Completion Remove all equipment, debris, and temporary signage upon completion of each floor. Dispose of any waste materials (e.g., paint cans, cleaning supplies) in accordance with environmental regulations. Provide a final report or documentation of completed work, if requested. Assumptions and Exclusions Major pavement repairs (e.g., crack filling, resurfacing) are not included in this scope and will require a separate agreement. Warranty: Not applicable

From Presolicitation posted on Apr 15, 2026

This project will be Solicitated in accordance to FAR overhaul 12.201-1 Simplified procedures (c) (2), 621-26-S-006 - Campus Wide Stripping & Painting STATEMENT OF WORK Campus Wide Striping and Painting Services at James H. Quillen Veterans Affairs Medical Center (JHQVAMC) Objective This Scope of Work outlines the tasks, materials, and responsibilities for re-striping services at Different parking lots located at the Mt Home VAMC. The objective is to refresh and enhance the existing pavement markings to improve visibility, safety, and traffic flow for vehicles and pedestrians. The project includes re-stripping parking spaces, directional arrows, crosswalks, handicap spaces, ADA Access Early warning tiles (50), and other necessary markings across all parking areas; Prepare area and Install 65 X5 concrete walkway from existing healing garden walkway to S. First St sidewalk. Saw cut joints every 5 and use control joints at existing concrete. Remove excavated dirt from the site and sow in grass to match. Performance Period: 365 calendar days after issuance of the Notice to Proceed (NTP). Scope of Work Site Preparation Clean all surfaces to be re-striped by sweeping, power washing, or other methods to remove dirt, debris, oil stains, and loose paint, ensuring proper adhesion of new markings. Coordinate traffic shutdowns with COR. Materials and Specifications Use high-quality, durable traffic paint suitable for concrete surfaces and compliant with local regulations. Colors: White for standard parking lines, yellow for directional arrows and no-parking zones, blue for handicap spaces, and red for fire lanes (or as specified by client/local codes). Ensure all markings meet American Disability Act standards for handicapped spaces, including size, spacing, and signage. Provide stencils for arrows, numbers, letters, and symbols as needed. Re-Striping Execution Parking Spaces: Re-stripe all parking lines on each of the 4 floors, maintaining consistent dimensions (e.g., 9 ft wide x 18 ft long for standard spaces, or as per existing layout). Directional Markings: Refresh arrows, lane dividers, and stop bars to guide traffic flow. Pedestrian Areas: Stripe crosswalks, walkways, and loading zones with appropriate hatching or solid fill. Specialty Markings: Update handicap spaces, fire lanes, no-parking zones, and reserved parking areas with clear, legible markings. Apply reflective beads or additives to paint (if specified) to enhance visibility in low-light conditions. Concrete walkway Prepare area and Install 65 X5 concrete walkway from existing healing garden walkway to S. First St sidewalk. Saw cut joints every 5 and use control joints at existing concrete. Remove excavated dirt from the site and sow in grass to match. ADA Access Early warning tiles (50) Prepare the existing access ramps to receive ADA Access Early Warning Tiles (quantity: 50), with the final locations to be determined. Cut the existing concrete for the installation of Access Early Warning tiles, ensuring that the tiles do not create a tripping hazard and paint the ramps. Quality Control Ensure straight, clean lines with no overspray or smudging. Verify compliance with the original layout or approved updated design plan. Conduct a final walkthrough with the property manager or designated representative to confirm satisfaction with the work. Safety and Traffic Management Install temporary signage, cones, and barriers to cordon off work areas and ensure the safety of workers, vehicles, and pedestrians. Work in sections to be done after hours and on weekends. Adhere to Occupational Safety and Health Administration safety standards and local traffic control requirements. Cleanup and Completion Remove all equipment, debris, and temporary signage upon completion of each floor. Dispose of any waste materials (e.g., paint cans, cleaning supplies) in accordance with environmental regulations. Provide a final report or documentation of completed work, if requested. Assumptions and Exclusions Major pavement repairs (e.g., crack filling, resurfacing) are not included in this scope and will require a separate agreement. Warranty: Not applicable

From Presolicitation posted on May 04, 2026

Notice history

2
  1. Presolicitation Posted Apr 15, 2026 View
  2. Presolicitation LATEST Posted May 04, 2026
    • Description: Description was updated

Details

Solicitation number 36C24926B0004
Notice ID f69d62294b8f4ea384b5e935f37d8477
Notice type Presolicitation
Product / Service (PSC) Z1LZ
NAICS 237310
Place of performance Mountain Home, Tennessee
Archive date Jul 23, 2026

Award Information

Awardees
0

Documents

1
View on SAM.gov

Contacts

primary
Michael R. Brown

Contract Specialist

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
249-NETWORK CONTRACT OFFICE 9 (36C249)

Place of Performance

James H. Quillen VA Medical Center (JHQVAMC) Lamont & Veterans Way
Mountain Home, Tennessee 37684
USA

Dates

Posted May 04, 2026 3 months ago
Last Updated Aug 06, 2026 1 day ago