Z1FA--534-24-907 Preserve Charleston Fisher House (VA-26-00014169) 36C24726Q0449_1
Summary
AI-generated · May 21, 2026Provide all supervision, labor, equipment, and materials to complete project 534-24-907, Preserve Charleston Fisher House at 150 Wentworth Street, Charleston, SC, consisting of three parts: Part 1 install an ADA ramp per construction drawings and specifications, demolish existing concrete steps, and pour new ADA ramp and steps per the approved design; Part 2 interior painting and caulking, including moving/protecting furniture, painting 16 bedrooms/bathrooms (including crown molding on all three floors), baseboards, window and door trim, and at least seven ceilings, plus repainting kitchen cabinets (doors removed, surfaces prepped, spray-painted); Part 3 exterior painting, covering all exterior trim, fascia, soffits, decorative wood columns, porch ceilings, doors, pergola, and outdoor pavilion (interior and exterior surfaces).
Work is to be performed on weekdays from 8:00 a.m. to 4:00 p.m. at the Fisher House and requires minimizing construction impact to avoid disrupting operations; scheduling and coordination with the Fisher House Charleston must be approved in advance by the Contracting Officer’s Representative (COR).
The contractor shall provide all supervision, labor, equipment, and materials needed to complete work for project 534-24-907, Preserve Charleston Fisher House located at 150 Wentworth Street, Charleston SC. Work will be accomplished per this Statement of Work and will encompass three parts: Install ADA Ramp Paint Interior Fisher House Paint Exterior Fisher House For part 1 Install ADA Ramp, work will be per the provided construction drawings and specifications of this statement of work. Work will consist of demolition of existing concrete steps and pouring new ADA ramp and steps per the approved Board of Architectural Review Thomas & Denzinger Architects Design and Specifications. For parts 2 and 3 Paint Interior and Exterior, work will require furniture to be moved and protected to access walls, cabinets and ceilings. Painting and caulking of 16 bedroom/bathrooms including crown molding on all 3 floors. Baseboards, window and door trim and at least seven ceilings are required to be painted. Kitchen cabinets are to be repainted, requiring removal of cabinet doors, prepping of surfaces and spray painting. Paint all exterior trim, fascia, soffits, decorative wood columns, porch ceilings, doors, Pergola, and outdoor Pavilion (exterior and interior) and all paintable surfaces of the exterior Fisher House. The following areas are to be scraped, pressure-washed, repaired or replaced, primed, and painted: Doors - Soffit - Fascia - Columns - Pergola Work will need to be done on weekdays between 8:00 a.m and 4:00 p.m at the Fisher House Charleston located at 150 Wentworth Street, Charleston SC. Construction impact shall be minimized and mitigated in a way that limits disruption to the functioning of the Fisher House Charleston. Scheduling and coordination with the Fisher House Charleston will be critical and must be approved by Contracting Officer s Representative (COR) prior to work.
From Solicitation posted on May 20, 2026Notice history
1-
Solicitation LATEST Posted May 20, 2026
Details
Award Information
Not yet awarded
Documents
9Contacts
Contracting Officer
Phone
Agency
Place of Performance
USA