Contacts, documents and full notice history are available with a subscription.
Solicitation SDVOSBC Expired 4 notices 1 document

Z1DZ--693-20-102 | Construct Chiller Plant (VA-25-00072403) 36C24426B0002

Solicitation 36C24426B0002 Copied Notice ID 4c47f15b00b64233aabcf9bb83439b45 Copied VETERANS AFFAIRS, DEPARTMENT OF — 244-NETWORK CONTRACT OFFICE 4 (36C244)
SAM.gov
Posted
Jan 26, 2026
Deadline
Feb 09, 2026
Set-aside
SDVOSBC
NAICS
236220
PSC
Z1DZ

Summary

AI-generated · Jan 27, 2026

Construct a new chiller plant at the Wilkes-Barre VA Medical Center, including a building addition, installation of three chillers, cooling towers, backup diesel generators with fuel storage, relocation of a bulk oxygen tank, and parking/site access realignment to support the new plant and utility systems. The project must deliver complete, functional systems that meet VA requirements, industry standards, and all applicable codes, with an emphasis on energy efficiency. The contractor will provide all labor, materials, tools, equipment, transportation, and supervision, and the work must be completed within 600 calendar days after notice to proceed, with an estimated construction magnitude between $10 million and $20 million.

This is a market research/Request for Information (RFI) to assess contractor availability and determine competition strategy (limited to small businesses or open to all). Respondents should submit a statement of interest, a capability statement, and pricing for similar projects, and indicate whether you would perform as a prime, in a joint venture, under a VA Mentor-Protégé Program, or with teaming partners. Include company name, address, point of contact, UEI/SAM number, and indicate business type and size category. Responses must be submitted by the stated deadline via email to the designated VA contact; clearly mark proprietary information where applicable; and note that responses are informational and not offers or solicitations.

Sources Sought Notice Sources Sought Notice Sources Sought Notice *= Required Field Sources Sought Notice DESCRIPTION This is a REQUEST FOR INFORMATION (RFI) NOTICE FOR CONSTRUCTION FOR PLANNING PURPOSES ONLY. Project Title: 693-20-102 | Construct Chiller Plant | Wilkes-Barre VAMC The following information is provided to conduct market research to determine the availability of contractors that can perform the work for this project at the Wilkes-Barre VA Medical Center. After completion of market research analyses, the Government will determine whether to limit competition among the small businesses or proceed with full and open competition as other than small businesses. Work to be performed: This project includes all necessary work to install a new chiller plant located at the Wilkes Barre VA (VAMC), with the Department of Veterans Affairs (VA) requirements, industry standards and all applicable code requirements. The project outcome will be a new Chiller Plant at the WBVA campus. Key elements include but not limited to: construction of a building addition, three chillers, cooling towers, backup diesel generators with fuel storage, relocation of bulk oxygen tank, and parking realignment/site access in area associated with new plant and utility support systems. This project must provide complete and functional systems in accordance with the Department of Veterans Affairs (VA) requirements, industry standards and all applicable code requirements. This applies to each system and every system, as a whole, which is affected by this project, even if only partially modified. The systems and equipment must maximize energy efficiency to the maximum extent practical. The Contractor shall furnish all labor, materials, tools, equipment, transportation and supervision as necessary to accomplish the work. All work shall be performed in accordance with the Specifications and Drawings, and shall follow all applicable Federal, State and Local regulations and standards. The maximum time for completion of the project is 600 calendar days after receipt of Notice to Proceed. The Magnitude of Construction is between $10,000,000.00 and $20,000.000.00. Contractors that have the ability to perform the work for this project are requested to respond as follows: Statement of interest Capability statement Pricing for completed projects of similar scope Address if you would perform the work as a prime contractor, joint venture, VA Mentor-Protg Program, or potential teaming partners Include company name, address, Point of Contact, UEI (SAM) number. Provide business type and size standard based on NAICS code 236220, Commercial and Institutional Building Construction (i.e. Large Business, Small Business, Service-Disabled Veteran Owned, Veteran Owned, Women-Owned, etc). Contractors who do not respond with complete information will not be considered as responsive. Submit responses and related information via email to Stephen.Gulotta@va.gov by February 9th, 2026, 4:00 PM, Eastern Standard Time (EST). No hard copy submissions. Proprietary/company confidential material shall be clearly marked on every page that contains such. Include the name, phone number, and email address of the point of contact from your organization. DISCLAIMER This RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI. PLEASE BE ADVISED THAT WHEN THE SOLICITATION IS RELEASED, IT WILL NOT BE THE SAME ANNOUNCEMENT NUMBER AS THIS SOURCES SOUGHT NOTICE.

From Sources Sought posted on Jan 26, 2026

Project No 693-20-120 Construction Phase Construct Chiller Plant SET-ASDIE 100% FOR SERVICE-DISABLED VETERAN-OWNED BUSINESS ACQUISITION INFORMATION: In accordance with FAR Subpart 5.2 THIS OPPORTUNITY is 100% set-aside for Service-Disabled Veteran-Owned Businesses (SDVOSB) Contractors. This acquisition is conducted in accordance with FAR Part 36 & 14, Invitation for Bid (IFB). Award will be made based on Price only IAW FAR 14 Invitation for Bid procedures. Work to be Performed: This project includes all necessary work to install a new chiller plant located at the Wilkes Barre VA (VAMC), with the Department of Veterans Affairs (VA) requirements, industry standards and all applicable code requirements. The project outcome will be a new Chiller Plant at the WBVA campus. Key elements include but not limited to: construction of a building addition, three chillers, cooling towers, backup diesel generators with fuel storage, relocation of bulk oxygen tank, and parking realignment/site access in area associated with new plant and utility support systems. This project must provide complete and functional systems in accordance with the Department of Veterans Affairs (VA) requirements, industry standards and all applicable code requirements. This applies to each system and every system, as a whole, which is affected by this project, even if only partially modified. The systems and equipment must maximize energy efficiency to the maximum extent practical. All work shall be performed in accordance with the Specifications and Drawings, and shall follow all applicable Federal, State and Local regulations and standards. The maximum time for completion of the project is 600 calendar days after receipt of Notice to Proceed. The full detailed scope of work will be included in the solicitation. The solicitation documents, drawings, and specifications will be available for download from the website https://beta.sam.gov/, SAM.gov, on or about February 24, 2026. Potential bidders are responsible for monitoring this site for the release of the solicitation package and any other pertinent information and updates. The Government will not provide paper copies of the solicitation. Bidders will be responsible for downloading their own copy of the solicitation package, drawings, and subsequent amendments, if any. Telephone, written, facsimile, or e-mail requests for the solicitation will NOT be honored. Individual copies of the Bidder s Mailing List WILL NOT be prepared nor distributed by the Contracting Officer. The solicitation amendments issued to the IFB will be posted to SAM.gov website and bidders are advised it is their responsibility to obtain and acknowledge all amendments. Paper copies of amendments will NOT be individually mailed. The solicitation will include the scheduled pre-bid organized site visit information, due date for contractor questions and bid due date. While the walk-thru is not mandatory, all bidders, suppliers and subcontractors are strongly encouraged to attend. All requests for information or questions regarding the solicitation must be submitted in writing to the Contracting Officer and sent via electronic mail to the Contracting Specialist: Stephen.Gulotta@va.gov by the date specified in the solicitation. No telephonic or fax requests will be honored. In accordance with VAAR 836.204, the magnitude for this procurement is between $10,000,000 and $20,000,000 and NAICS Code 236220 with a small business size standard of $45 million. All interested contractors must ensure that their firms have the ability to provide 100% Performance and Payment Bonds and a 20% Bid Guarantee. The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation. Award of this contract is subject to the availability of FY26 funds. To be considered for award, all prospective contractors SHALL be registered in the System for Award Management (SAM) Database at www.sam.gov and VETCERT at www.SBA.gov at the time of offer and award. Contractors who do not meet this requirement shall not be considered and bid immediately rejected. SDVOSB Contractors MUST meet OSHA/EPA requirements. SDVOSB Contractors MUST be in compliance with VAAR 819.7003. To register in SAM, you may go online at https://www.sam.gov. For OSHA information, you may refer to www.osha.gov. Any updates and changes to the information above will be provided in the solicitation once released and subsequent amendments. Contractors are encouraged to regularly check SAM.gov for any updates regarding this project. The solicitation may be canceled and all offers rejected before award but after solicitation closing date when it is clearly in the best interest of the Government.

From Presolicitation posted on Feb 26, 2026

SCOPE OF WORK Construct New Chiller Plant Project # 693-20-120 May 2025 General: The scope of work shall generally consist of providing all labor, materials, tools, equipment, permits, testing, and reports required to install a new chiller plant located at the Wilkes Barre VA (VAMC), as generally described in this scope of work, but detailed in drawing set titled: CONSTRUCT CHILLER PLANT. VAMC WILKES-BARRE PENNSYLVANIA, USA, PROJECT #: 693-20-120. The project outcome will be a new Chiller Plant at the WBVA campus. The Construct Chiller Plant project is a multi-phase project. Key elements include, but not limited to: construction of a building addition, three chillers, cooling towers, backup diesel generators with fuel storage, relocation of bulk oxygen tank, and parking realignment/site access in area associated with new plant and utility support systems. All construction work shall be provided in accordance as defined by the drawings and specifications, all applicable Federal, State and Local Codes as well as applicable standards, reference publications, and code requirements contained within the VA Master Specifications. In the event of a discrepancy, the VA Master Specifications shall take precedence. Prior to the start of work the contractor shall visit the site to familiarize themselves with the location and extent of the work. The contractor shall submit shop drawings of all proposed materials and equipment for review and approval by the VA. Submittals shall include product data and other applicable information required as described in the VA Master Specifications. The VA Master Specifications shall be utilized as the minimum basis of design for all new materials and equipment specified for this work unless noted otherwise on the drawings. No work shall begin until all submittals have been reviewed and approved by the VA. Only new materials and equipment shall be installed in the work. All materials and equipment shall be of the current manufacturer s products. No obsolete or discontinued materials and equipment shall be provided. Contractor shall provide all design and construction project management, administration, project superintendence, supervision, and construction trades work. All work shall be coordinated through the designated Contracting Officer s Representative (COR). Infection Control All work for this project will be performed in accordance with the VA Wilkes-Barre s Infection Control Practices for Construction (Reference attachment: Infection Control Construction Project Compliance Policy (11IC-10-897). All materials, equipment and labor associated with the Infection Control Requirements required by the VA Infection Control Practitioner shall be provided by the contractor. The interior construction work is anticipated to require Class I precautions. The contractor, Contracting Officer s Representative (COR) and the Infection Control Practitioner shall meet to discuss the work activities within the areas of work immediately prior to mobilization and the start of construction. Final classification of the infection control requirements will be at the sole discretion and direction of the Infection Control Practitioner. In addition to the protection of all workers, staff, patients, etc. the contractor shall minimize the amount of dust and exhaust fumes generated during exterior construction as this is critical to prevent contamination of supply air intakes of the building HVAC systems. Scheduling A construction schedule shall be submitted for approval prior to the start of work and within 180 days after the notice to proceed. All schedule items will show a start date and a completion date. The schedule will include specific tasks with dates for each step of the process. Schedule shall include a comprehensive list of all intended tasks, dates, and overall project order. Work shall be performed during normal business hours 8:00AM to 4:30PM Monday to Friday excluding federal holidays except as required by facility impact and utility shutdowns. Any work determined by the facility as having an impact on the operations of the facility shall be conducted on an after-hours schedule. Specific tasks and phases that include, but not limited to utility tie-ins, utility shutdowns, patient care areas, any excessive noise coming from the project that is disrupting patient care, sterile areas, etc. Utility shutdowns will be coordinated and scheduled with the COR two weeks in advance of the work. VA Lock Out/Tag Out policy will be implemented. Contractor shall provide a weekly schedule report to the COR. All work shall be completed within 600 calendar days from receipt of Notice to Proceed. Performance All contractors shall have a company identification badge displayed at all times while on site with their name and company identified. All contractors shall apply for a VA ID badge to work in the facility. All VA Police security requirements/site access shall be coordinated with the designated Contracting Officer s Representative. Laydown area(s) will be coordinated with the COR. Construction personnel vehicles shall park in the designated VA s contractor parking lot. The contractor shall follow good housekeeping practices and shall keep the work and surrounding areas clean and free of debris. Contractor shall thoroughly clean each area of work at the completion of each shift including all corridor areas leading to and affected by the work. The contractor shall contract for and provide third party commissioning service as part of government acceptance and testing of the chiller boiler plant. This project shall complete all interior and exterior work, installation, removal and relocation of equipment and commissioning as identified in the drawings and specifications. Safety Contractors shall comply with all applicable federal, state, and local requirements regarding workers health and safety. The requirements include those found in federal and state Occupational Safety and Health Act (OSHA) statutes and regulations. The project superintendent shall have the 30-Hour OSHA Construction Safety Course certification and all other construction personnel shall have the 10-Hour OSHA Construction Safety Course certification. Submit training records of all employees for approval prior to the start of work. In the performance of this contract, the Contractor shall take such safety precautions as necessary while operation in construction area. Contractor shall provide all necessary tools, equipment, labels, and Personal Protective Equipment to perform the work safety, effectively, and timely. Demolition Refer to the drawings for demolition. All work shall be performed in accordance with the plans and specifications. Contractor shall be responsible for removal and disposal of all demoed equipment and materials. Close Out The contractor shall also provide all close-out documents as per the requirements in FAR 4.804 Closeout of Contract Files including as-built drawings, manuals, and other relevant documents. The contractor shall be responsible to provide all testing and reports associated with the systems and materials installed under this contract. Brand Name: Contractor shall be required to provide the following Brand Name products which must be compatible with existing systems. All potential offers must propose the below products: Physical Security Access Control System (PACS) HID Global pivClass RPK40 To maintain the integrity and security of the hospital's critical operations, the VA requires access control equipment that is compatible with the existing access control system and licensed software (Software House). This compatibility ensures consistent operation and restricts access to key areas only to authorized personnel. This project necessitates the deployment of access control readers, wall switches with keypad contact less readers and associated hardware that supports the use of a personal identification number (PIN) entered via a keypad and transmitted directly to a panel or door controller (with PIN matching occurring at the panel, not on the card). Furthermore, the system must be approved under the VA Technical Reference Model. Video Surveillance Avigilon Video Surveillance Video cameras, fixed, PTZ and dome. The video surveillance system in the VA hospital must ensure the safety and security of patients, staff, visitors, and property by providing comprehensive coverage and high-resolution imaging. Key requirements include: Seamless integration with existing security infrastructure and other systems (access control, alarm systems). Complete monitoring of critical areas with high-definition cameras, including both fixed and PTZ cameras. Modern IP-based cameras with low-light functionality. Adequate on-site/cloud storage to retain footage per VA compliance requirements. Built-in redundancy and power backup for continuous operation. Compliance with federal, state, and VA-specific regulations, including the VA Technical Reference Model. These requirements ensure the reliability, efficiency, and security of the hospital's video surveillance system, enhancing overall safety and operational effectiveness. Door Hardware Yale - GG-Keyway mortise lockset with 6-pin interchangeable cores The VA requires mechanical door locks made of steel or brass, with keyable 6-pin, double-cylinder locking mechanisms. These locks must feature anti-pick, bump-resistant designs, reinforced strike plates, and meet ANSI/BHMA and UL safety certification standards. Fire Alarm System Johnson Controls - Notifier IFC-3030 Intelligent Addressable Fire Alarm System To maintain the integrity and safety of the hospital's critical operations, the VA requires fire alarm equipment that is compatible with the existing fire monitoring system. This compatibility ensures consistent operation and monitoring of the VA facility of any fire-based threat. Furthermore, the system must be approved under the VA Technical Reference Model. Facility Building Automation System Johnson Controls - Metasys Building Automation and HVAC Control System Description: The VA requires an integrated Building Automation System that allows for a single HVAC control system. Utilizing a single system to monitor and control all the Wilkes-Barre VA Medical Center facility HVAC systems allows for total system integration and efficient controls to maximize efficiency and comfort. THE ABOVE SCOPE IS INTENDED TO DESCRIBE THE PROJECT IN GENERAL AND IS NOT LIMITED TO THE AFOREMENTIONED. ALL WORK SHOWN ON THE DRAWINGS AND DESCRIBED IN THE SPECIFICATIONS SHALL FORM THE COMPLETE PROJECT.

From Solicitation posted on Mar 17, 2026

See block E of the attached SF 30 for Amendment Information.

From Solicitation posted on Mar 18, 2026

Notice history

4
  1. Sources Sought Posted Jan 26, 2026
  2. Presolicitation Posted Feb 26, 2026
    • Description: Description was updated
    • Notice Type: Sources SoughtPresolicitation
    • Response Deadline: Feb 09, 2026Mar 13, 2026
  3. Solicitation Posted Mar 17, 2026
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Mar 13, 2026Mar 26, 2026
    • Set-Aside: Service-Disabled Veteran-Owned Small Business Set AsideNone
  4. Solicitation LATEST Posted Mar 18, 2026
    • Description: Description was updated
    • Response Deadline: Mar 26, 2026Apr 16, 2026

Details

Solicitation number 36C24426B0002
Notice ID 4c47f15b00b64233aabcf9bb83439b45
Notice type Sources Sought
Product / Service (PSC) Z1DZ
NAICS 236220
Place of performance Wilkes Barre VAMC, PA
Archive date Mar 11, 2026

Award Information

Awardees
0

Documents

1
View on SAM.gov

Contacts

primary
Stephen Gulotta

Contract Specialist

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
244-NETWORK CONTRACT OFFICE 4 (36C244)

Place of Performance

Wilkes-Barre VAMC
1111 East End Blvd
Wilkes Barre VAMC, PA 18711

Dates

Posted Jan 26, 2026 6 months ago
Last Updated Aug 06, 2026 1 day ago
Due Feb 09, 2026 5 months ago