Z1DA--Site Security Updates at Cincinnati VAMC. Project No. 539-22-208 36C25026B0032_1
Summary
AI-generated · Apr 04, 2026Contractor shall provide all tools, equipment, materials, permits, labor, and supervision needed to renovate site security at the Cincinnati VAMC, covering the main hospital, CLC, Utility Plant, Admin Building 3, parking garage, and the VA Cincinnati Site. The work spans general construction, alterations, electrical, telecommunications, and site work to demolish and remove existing security infrastructure (security gate, card readers, fencing, walls, ceilings, piping, and related items) and install new security components as specified in the project drawings and specifications.
Some activities will require utility or roadway shutdowns and may need to be scheduled outside normal facility hours. A detailed inspection of the premises, drawings, and specifications is recommended to determine the full scope and conditions; the described work is a basic outline and not a complete specification.
The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the subject project. All work shall be completed in accordance with the project drawings and specifications. The scope of work involves renovation for site security in the main hospital, CLC, Utility Plant, Admin bldg. 3, parking garage and the VA Cincinnati Site. Work includes, but is not limited to, general construction, alterations, electrical, telecommunications, and site work, necessary for demolition and removal of security gate, card readers, fencing, walls, ceilings, piping and certain other items necessary for completion and installation of new work. Due to the utility/roadway shutdowns required, some of this work will have to be scheduled outside of normal facility business hours. A full list of requirements and further details are provided in the project drawings and specifications. The above construction Statement of Work constitutes a basic outline of work and in no way outlines all details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifications be initiated to determine the needs and conditions for the construction of this project.
From Solicitation posted on Apr 03, 2026The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the subject project. All work shall be completed in accordance with the project drawings and specifications. The scope of work involves renovation for site security in the main hospital, CLC, Utility Plant, Admin bldg. 3, parking garage and the VA Cincinnati Site. Work includes, but is not limited to, general construction, alterations, electrical, telecommunications, and site work, necessary for demolition and removal of security gate, card readers, fencing, walls, ceilings, piping and certain other items necessary for completion and installation of new work. Due to the utility/roadway shutdowns required, some of this work will have to be scheduled outside of normal facility business hours. A full list of requirements and further details are provided in the project drawings and specifications. The above construction Statement of Work constitutes a basic outline of work and in no way outlines all details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifications be initiated to determine the needs and conditions for the construction of this project. Amd 0001 - Site Visit Sign In Log
From Solicitation posted on Apr 15, 2026Notice history
2Details
Award Information
Not yet awarded
Documents
9Contacts
Contract Specialist
Phone
Agency
Place of Performance
USA