Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 1 notice 10 documents

Z1DA--Replace Containment Sump 610A4-25-503 36C25025Q0471

Solicitation 36C25025Q0471 Copied Notice ID 06b23fd20f0445e2b942cca6ff8677d6 Copied VETERANS AFFAIRS, DEPARTMENT OF — 250-NETWORK CONTRACT OFFICE 10 (36C250)
SAM.gov
Posted
Jun 17, 2025
Deadline
Jun 23, 2025
Set-aside
None
NAICS
236220
PSC
Z1DA

Summary

AI-generated · Aug 23, 2025

Replace the containment sump at location 610A4-25-503 as part of a construction project, with all outdoor waste dumpsters/receptacles to be covered for the project duration to meet Fort Wayne ordinances; all waste manifests, receipts, or documentation must be forwarded to the COR. The UST sensor (the yellow wire shown) must be replaced during this work.

The contractor must provide a temporary fuel tank to support Building 1’s generator while work occurs, and follow all VA tank specifications plus applicable state, local, and regulatory requirements for containment equipment. The existing containment pit is at least 8 inches deep, though some areas are deeper and exact depth is unknown. Utility drawings are available, and bid materials reference attachments including utility information and a pre-bid sign-in.

Important additional information not provided in the original Statement of Work: All outdoor waste dumpsters/receptacles must be covered during the whole duration of the project to comply with Fort Wayne Code of Ordinances, Chapters 53, Sec. 53.41. All waste manifests, receipts, or documentation are forwarded to the COR. (Construction Debris, hazardous waste, etc.) The UST sensor, which is the yellow wire in the photo below, shall be replaced during this project. Answers to RFIs 1. When can the generator for Building 1 be out of service and for what duration? A: A temporary fuel tank will be required to serve the generator while work is taking place. 2. Are there any specifications on the new containment equipment? A: Yes the contractor must follow all VA tank Specifications as well as state, local, and any other regulatory agency requirements. 3. What is the depth of the existing containment pit? A: It is at minimum 8 inches deep but it was further below the ground in other areas. Exact depth is unknown. 4. Can utility drawings be provided for that area ? A: Yes. Please see attached. ATTACHMENTS 610A4-25-503 Replace Containment Sump Pre-Bid Sign in sheet FW 11 All Utilities

From Solicitation posted on Jun 17, 2025

Notice history

1
  1. Solicitation LATEST Posted Jun 17, 2025

Details

Solicitation number 36C25025Q0471
Notice ID 06b23fd20f0445e2b942cca6ff8677d6
Notice type Solicitation
Product / Service (PSC) Z1DA
NAICS 236220
Archive date Jul 23, 2025

Award Information

Awardees
0

Contacts

primary
Stacie I Hill

Contract Specialist

Email

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
250-NETWORK CONTRACT OFFICE 10 (36C250)

Place of Performance

Dates

Posted Jun 17, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Jun 23, 2025 1 year ago