Z1DA--NRM CONSTRUCTION -528A8-18-801 Renovate for Cardiac Cath & IR 36C24226R0033

Solicitation 36C24226R0033 Copied Notice ID 18b7ade6ce434586a2498dc698017144 Copied VETERANS AFFAIRS, DEPARTMENT OF — 242-NETWORK CONTRACT OFFICE 02 (36C242)
SAM.gov
Posted
Mar 27, 2026
Deadline
Apr 03, 2026
Set-aside
None
NAICS
236220
PSC
Z1DA

Summary

AI-generated · Jan 03, 2026

Renovate two separate procedure rooms at the Albany VA Medical Center (Cardiac Catheterization Lab and Vascular Interventional Radiology Lab) plus the required ancillary facilities to support them. The contractor shall provide all labor, materials, tools, equipment, and supervision needed to complete the project.

The project is estimated between $5,000,000 and $10,000,000. A bid bond will be required with responses. Solicitation materials, including specifications and drawings, will be issued electronically on sam.gov around January 16, 2026, with amendments posted there as well. A site visit will be scheduled and described in the solicitation, and bids and all correspondence must be submitted by email to the contracting officer.

This pre-solicitation notice is to inform potential offerors that the Albany NY VA Medical Center will be posting a solicitation (36C24226R0033) on or about January 16th, 2026, to provide all labor, materials, tools, equipment, and supervision necessary to complete the Renovate for Cardiac Cath & IR project(528A8-18-801). This project is necessary to create two(2) separate Procedure Rooms (1 Cardiac Cath Lab and 1 Vascular Interventional Radiology Lab), along with the required ancillary facilities to support the Procedure rooms at the Albany VA Medical Center 113 Holland Avenue, Albany NY 12208. It has been determined that there are qualified firms in accordance with Public Law 109-461 that are capable of performing under NAICS Code 236220, "COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION", with a size standard of $45M. Therefore this procurement is 100% set-aside for Small Businesses. The estimated construction value of this project is between $5,000,000 and $10,000,000. Information regarding the scheduled site visit will be stated in the Solicitation. Bid bonding will be required to respond to this RFP once released. OBTAINING SOLICITATION MATERIAL Solicitation materials consisting of the Information for Proposal Details, Specifications, Drawings and Contract Forms will be available on http://www.sam.gov in electronic format only. These should be available on or about January 16th, 2026. An Offeror's mailing list, list of interested parties and/or list of attendees at site visits WILL NOT be prepared nor distributed by the Contract Specialist. SOLICITATION AMENDMENTS: Amendments to the solicitation will be posted at http://www.sam.gov. Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Offerors are reminded that they are responsible for obtaining and acknowledging all amendments to this solicitation and attaching to their bid. All bids and correspondence will be by email only to the Contracting Officer: Michael.Spivack@va.gov.

From Presolicitation posted on Jan 02, 2026

SCOPE OF WORK VA PROJECT NO. 528A8-18-801 RENOVATION FOR CARDIAC CATH AND VIR This Scope of work is for construction services for the completion of project 528A8-18-801: Renovation for Cardiac Cath Lab and Vascular Interventional Radiology Lab located at the Albany VA Medical Center 113 Holland Avenue, Albany NY 12208. All work shall be completed within 790 calendar days from issuance of the Notice To Proceed. 1.3 STATEMENT OF BID ITEM(S) A. ITEM I, GENERAL CONSTRUCTION: Work includes all labor, material, equipment and supervision to perform: 1. The required general construction work on this project including, but not limited to, demolition of existing architectural items, new walls, new floor, new ceilings, new finishes, temporary facilities and any other addition/demolition alterations necessary for a complete and operable system. 2. The required mechanical construction work on this project including, but not limited to, demolition of existing HVAC and hydronic systems, new constant volume air terminal units, new ductwork, new hydronic piping, new controls, new pressure monitoring equipment and any other addition/demolition alterations necessary for a complete and operable system. 3. The required plumbing construction work on this project including, but not limited to, demolition of existing plumbing fixtures, demolition of domestic/sanitary/venting/medical gas/RO piping, new plumbing fixtures and any other addition/demolition alterations necessary for a complete and operable system. 4. The required fire protection construction work on this project, including but not limited to, demolition or relocation of existing sprinkler heads, new sprinkler heads, new fire protection piping and any other addition/demolition alterations necessary for a complete and operable system. 5. The required electrical and fire alarm construction work on this project including, but not limited to, demolition of existing power and lighting systems, new power circuits, new lighting fixtures, relocation of existing fire alarm equipment, new fire alarm devices, installation/removal of temporary heat detectors in the working areas, and any other addition/demolition alterations necessary for a complete and operable system. 1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR A. Detailed Drawings and Specifications have been attached to this solicitation. 1.5 CONSTRUCTION SECURITY REQUIREMENTS A. Security Plan: 1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project. 2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations. B. Security Procedures: 1. General Contractor s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

From Solicitation posted on Feb 06, 2026

This amendment changes the walkthrough date listed in block 10 of the SF1442 from 02/18/2026 at 12:00EST to 02/24/2026 at 12:00EST. The meeting location does not change. 2. This amendment changes the RFI deadline date listed in block 10 of the SF1442 from 02/27/2026 at 12:00EST to 03/05/2026 at 12:00EST. This amendment changes the close date of this solicitation listed in blocks 10 and 13a of the SF1442 from 03/10/2026 at 12:00EST to 03/17/2026 at 12:00EST. All other terms and conditions remain the same.

From Solicitation posted on Feb 09, 2026

This amendment removes the following attached files from solicitation 36C24226R0033: 7-9-25 - VA STRATTON CARDIAC CATH 100 CD SUBMISSION v2 Stratton VAMC Cath Lab 528A8-18-801- Volume One 100 CD Specifications Stratton VAMC Cath Lab 528A8-18-801- Volume Two 100 CD Specifications GI-004 ADDENDUM 1 ES-100A ADDENDUM 1 ES-401 ADDENDUM 1 ES-402 ADDENDUM 1 This amendment adds updated drawings issued 12/05/2025 and specifications dated 02/11/2026. The following files are added to solicitation 36C24226R0033: 2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume One 100 Percent CD Specifications 2-11-26 - Stratton VAMC Cath Lab 528A8-18-801 - Volume Two 100 Percent CD Specifications 12-05-25 - VA STRATTON CARDIAC CATH - 100pct SnS All other terms and conditions remain the same.

From Solicitation posted on Feb 12, 2026

This amendment posts the sign in sheet for the walkthrough that occurred on Tuesday, February 24th, 2026. See attached document. This amendment answers the following questions stated at the walkthrough: Can the Offeror change sub-contractors listed in the Offeror s proposal without Government approval? Answer: Government consent is required to change subcontractors that are provided in the Offeror's proposal in response to Evaluation Factor 1, Sub-factor 1: Management Approach. If an Offeror s proposal receives an unacceptable rating in Evaluation Factor 4: Integrated infrastructure and ceiling support(airframe) system, but is otherwise found technically acceptable, is the proposal still considered technically acceptable? Anwer: No, if an Offeror s proposal receives an unacceptable rating in Evaluation Factor 4: Integrated infrastructure and ceiling support(airframe) system it is automatically considered not technically acceptable. This amendment adds the following information to the solicitation: Offeror s shall be allowed to arrange escorted individual site visits to the project site for further site investigation. Escorts are available with at least one day s written notice via email, Monday to Friday between 13:00EST and 14:00EST until Friday, March 6th, 2026. To arrange a site visit, contact John Hogan at John.Hogan3@va.gov. All other terms and conditions remain the same.

From Solicitation posted on Feb 25, 2026

This amendment answers the following vendor questions: Is lead lining required for the concrete floor in the space? Specifications call for installation of floor lead. See Physicists report Please advise. Answer: The installation of lead lining is not necessary as the existing concrete is thick enough. If flooring concrete/topcoat removal is required during construction, the contractor shall return the impacted area back to its original specifications. Who is responsible to remove the office furniture that is currently in the construction space? Answer: The VA shall be responsible for the removal of office furniture and other misc. items stored in the construction area. For the above ceiling structural steel install in the 1st floor lobby: Who will be responsible to rework the existing ductwork, piping, sprinkler, electrical conduit, etc. so that the steel can be installed? Answers: Rework of the existing ductwork, piping, sprinkler, electrical conduit, etc. so that the steel can be installed shall be the responsibility of the contractor Will construction fence need to be installed around the contractor laydown staging area? Answer: Yes Will construction fence need to be installed around the exterior area of the scaffolding entrance Answer: Yes This amendment changes the RFI deadline date listed in block 10 of the SF1442 from 03/05/2026 at 12:00EST to 03/13/2026 at 12:00EST. This amendment changes the close date of this solicitation listed in blocks 10 and 13a of the SF1442 from 03/17/2026 at 12:00EST to 03/124/2026 at 12:00EST. All other terms and conditions remain the same.

From Solicitation posted on Mar 06, 2026

This amendment corrects the new end date for this solicitation stated in amendment A0005 section C. The correct end date is 03/24/2026, not 03/124/2026. All other terms and conditions remain the same.

From Solicitation posted on Mar 09, 2026

This amendment provided a corrected version of the EXHIBIT C Past Performance Questionnaire attached to amendment A0004 posted on 03/05/2026. All other terms and conditions remain the same.

From Solicitation posted on Mar 13, 2026

This amendment changes the close date of the solicitation from 03/24/2026 at 12:00 EST to 03/30/2026 at 12:00EST. All other terms and conditions remain the same.

From Solicitation posted on Mar 17, 2026

This amendment answers the following vendor questions: On Drawing MH-101, General Notes #1 states that all supply and return ductwork is to be welded stainless steel. Please confirm that this includes the office areas, and applies to all supply and return duct on this drawing. Do the joints need to be welded as well? If so, what will the joint connection be at the VAV/CAV boxes and the air outlets (other than the airframe outlets)? Do the hangers for this ductwork also need to be stainless steel? Response: All ductwork (supply and return) from AHU-17-3A that serve the CATH & VIR Labs, shall be stainless-steel with welded joints. The CAV boxes have a slip & drive cleat connection that shall be welded to complete installation. Hangers and supports for the ductwork shall be galvanized steel strap or rods per SMACNA standards. All ductwork (supply and return) from AHU-18-3A that serve the adjacent offices & support spaces, shall be galvanized steel with gasketed flanged joints. Although there is a spec, can't seem to find where the window shades are called out. Will they be on all exterior windows in the area (eg, rooms B228, B229, B230, B202J, B202G, B202F, A236C and A236B)? If so, there are no elevations of those windows, so can't really find window sizes. Response: Window shades are required at the following rooms. (Approximate sizes have been provide): B228- 8 -0 Wx 6 -6 H B229- 8 -0 Wx 6 -6 H and 4 -0 Wx 6 -6 H B230- (2) 4 -0 Wx 6 -6 H B202J- 8 -0 Wx 6 -6 H and 4 -0 Wx 6 -6 H B202G- 4 -0 Wx 6 -6 H A236B- 8 -0 Wx 6 -6 H Final dimensions to be field verified. Will splice plates and tension bolts be allowed for the structural steel beams? These beams are too large to get into an elevator and too heavy to boom thru a window and install. Drawing ref. 1-S-100 and 1-S-101 Please advise. Item 3. Beams less than 9 feet in length shall not be fabricated with a splice. At Contractor s Option, Beams longer than 9 feet may be erected with a field splice. The field splice shall be fabricated with prequalified complete joint penetration (CJP) welds as shown in the attached sketch. Beams can be brought into the building using the elevator or picked through a window. The Elevator size shall be field verified but is approximately 8/2-inches wide by 95-inches long. If picking through a window, a pick plan is required to be submitted to the VA in advance for review. Areas below the pick are required by the VA to be evacuated/empty during the lift including interior areas of the building. As part of the Special Inspection Schedule, the welds shall be inspected by an AWS Certified weld inspector to inspect the CJP welds. Weld Inspector shall perform a Visual Inspection and Ultrasonic Test of 100 percent of the CJP Welds. See attached file 0338 VA RFI-0002 03-19-26f Please see below our RFIs for this project. As background on the first item, the BIM / coordination / as-built question relates to a spec-interpretation issue we have run into on a separate project and would like to clarify pre-bid here. Coordination / BIM / File Format Clarification The contract documents reference contractor coordination drawings, record documents, and VA CAD/BIM standards. Please clarify: Will any native CAD, BIM/Revit, point cloud, LiDAR, scan, or similar design/reference files be made available to the awarded contractor? If yes, please specify the file type/software version. Response: Autodesk 2025 DWG drawing package. Are contractor coordination drawings required in AutoCAD only, or is BIM/Revit required? Response: Refer to Section 01 33 23 Shop Drawings, Product Data, and Samples for requirements related to contractor coordination drawings and record drawings/as-builts. Are contractor record drawings / as-builts required in AutoCAD only, or is BIM/Revit required? Response: Refer to Section 01 33 23 Shop Drawings, Product Data, and Samples for requirements related to contractor coordination drawings and record drawings/as-builts. Third Floor CHW Modifications / Phasing and Final Configuration Sheets GI-004, MD-102, and MH-202 show phased third-floor chilled water modifications, including new 3" CHWS/R continuation, reconnection to an existing 3" branch, relocation of existing in-line pumps, and a bypass arrangement. The operating configuration is not clear to us. Please clarify: Which existing areas/systems are required to remain in-service during this work? Response: It is the responsibility of the contractor to develop the schedule and phasing of the contracted work. The major areas/systems that are permitted to be taken out-of-service are indicated on the GI sheets. What shutdowns, outage limitations, and cutover sequence are required? Response: It is the responsibility of the contractor to develop the schedule for shutdowns, outages, and cutover sequences of the contracted work. Contractor shall coordinate with the VA for scheduling of shutdowns, outages, and cutover sequencing. Are the relocated pumps intended to remain in the final condition, or be removed if TAB shows they are not required? Response: The relocated pumps are to remain in the final condition. Once the TAB is conducted, and the pumps are not required to maintain flow rates required for the A wing equipment, coordinate with the VA to utilize the by-pass loop and disconnect the electric and controls to the pumps. Is the bypass line temporary only, or part of the permanent installation? Response: The by-pass loop is part of the permanent installation and only to be utilized if the TAB report proves that the pumps are not required to maintain flow rates for the A wing equipment. Contract Duration / Phasing Duration Clarification Sheet GI-002, Construction Phasing Plan, identifies 86 Work Weeks Total and Project Duration: 287 Days, which do not match each other and differ from the solicitation duration of 790 days. Please clarify: What is the governing contract duration for this project? Response: The governing contract duration shall be 790 calendar days, as identified in the solicitation. The durations noted on Sheet GI-002 (i.e., 86 Work Weeks Total and Project Duration: 287 Days ) are for planning/phasing reference only and do not define the contractual project duration. Are the phase durations shown on GI-002 mandatory contract requirements, or for reference only? Response: Phase durations in the lobby are mandatory contract requirements. Phase durations for the 2nd and 3rd floor are reference. Are there any special insurance requirements? Specifications call for $1 Million Professional Insurance. Is this required? a) I need requirements for the following: GL limits Auto limit WC limit Umbrella limit Additional Insured & Waiver of Subrogation information and any other insurance being required. Response: Yes, the third-party medical vacuum certification company has a current ACORD insurance certificate of at least $1M in professional liability insurance coverage as per 226200 Medical Vacuum Systems VA Master Specification from the TIL, section 3.3 Verifier Testing A. 1.. All other insurance requirements are stated in FAR clause 52.228-5 and section 4.8 of the solicitation Supplemental Insurance Requirements. 4.8 SUPPLEMENTAL INSURANCE REQUIREMENTS In accordance with FAR 28.307-2 and FAR 52.228-5, the following minimum coverage shall apply to this contract: (a) Workers' compensation and employers liability: Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 is required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers. (b) General Liability: $500,000.00 per occurrences. (c) Automobile liability: $200,000.00 per person; $500,000.00 per occurrence and $20,000.00 property damage. (d) The successful bidder must present to the Contracting Officer, prior to award, evidence of general liability insurance without any exclusionary clauses for asbestos that would void the general liability coverage. Per MD-102, MH-202, ED101, ES101 shows existing Pumps to be relocated with note on MH-202 to keep existing Controls and extend control wire to new location. Question: Do you know the location of the existing controller for the two pumps that are being relocated? Response: The pump controller is located in A312 and shall be existing to remain. Question: How many wires/points for these Pumps. Start/Stop/Status/Speed? Response: The pump points are as follows: Inputs: P1 CHW pump status P2 HW pump status Outputs: P1 CHW pump s/s P2 HW pump s/s Question: Are these Pumps currently Controlled by Trane Controls or Automated Logic? Response: The pumps are controlled by Trane controls system. Note: There are still RFIs outstanding, any changes to the solicitation close date will be issued once all outstanding RFIs have been answered. No further RFIs or requests for site visits shall be accepted. All other terms and conditions remain the same.

From Solicitation posted on Mar 19, 2026

This amendment answers the following vendor questions: Spec sections 09 67 23.60 & 09 96 59 related to Resinous Coating Systems each direct bidders that, A sample warranty letter must be included with bid package or bid may be disqualified. Please confirm that no sample warranty letter will be required within the proposal submission. Response: This amendment adds to subfactor 1 of evaluation factor 1 the requirement that the offeror shall include the qualifications and product warranty terms (warranty letter is preferred) of the Resinous Coating System Installer as part of the subcontractor plan to be included in the offeror s proposal. This subcontractor information shall be evaluated in the same manner as the other subcontractors listed in this sub-section. Solicitation/RFP document indicates on page 9 of 57 that the technical capability narrative shall address the three (3) sub-factors detailed herein . Sub-factor 1 Management Approach and Sub-Factor 2: Experience are detailed on pages 9 & 10 but there is no reference to a third sub-factor. Please confirm that there are only two sub-factors or clarify the third sub-factor. Response: The statement in the technical capability narrative shall address the three (3) sub-factors detailed herein is incorrect. There are only two subfactors in the technical evaluation factor. Is there a BOD for signage? Does the VA exclusively use InPro or another manufacturer? Signage companies are having difficulty pulling the required info from 1-AS-905 and 101400. Response: See attached document Stratton VA Interior Finish Standards-250613 and VA Design Manual Drawing 1-ES-100 Detail 1 Calls out new Crawl Space walkway in dotted lines on the drawing. Is this New Crawl Space Contractor provided with this Bid? Can more Detail of what is expected be provided? Response: Yes, the contractor is responsible to remove the dirt in areas identified in drawing ES-100 (see General Note 2). A blown up section identifying the areas in question is highlighted in attachment ES-100 Clarification Spoils Earth Removal R1 More info will be needed for pricing If the expectation is that contractor is required to remove the spoils, we would need a route where we could get this out of the building, a place where we could load it into a truck and the time that this work could be performed spelled out. Response: This information will be forthcoming in a future amendment. Having difficulty visualizing the finished ceilings in both procedure rooms due to multiple heights. Can you provide 3-D renderings of both procedure room ceilings. Response: See attachments IR Lab Concept View and Cath Lab Concept View pdf files. This amendment extends the close date of this solicitation from 12:00EST on March 30th, 2026, to 12:00EST on April 3rd, 2026. Note: There are still RFIs outstanding, the solicitation close date may change based on when all RFIs received have been answered. All other terms and conditions remain the same.

From Solicitation posted on Mar 20, 2026

This amendment answers the following vendor questions: For this project would the government accept wall protection from Construction Specialties? Response: Yes, it is listed as InPro. I came across a note on drawing GI 004 that calls for us to reference drawing 1-HA-103. Could not find the drawing either. Response: Amendment note for GI-004 Phase 3.5 note #8. Note #8 references 1-HA-103. It should reference drawing 1-AS-201 at coordinates 7A, and detail 5/PL-701. Electrical Site Drawing 1-ES-002 Detail 1 states that existing utilities will be marked out by this Contractor . Are As-builts available that show existing Utilities in the area? Response: Existing as-builts are not available. Per note at coordinates C1, the contractor is required to hand dig, field verify, and provide mark ups of all existing utilities within this area. As all of the RFIs received have been answered, this amendment extends the close date of this solicitation from 12:00EST on 03/30/2026 to 12:00EST 04/01/2026. All other term and conditions remain the same.

From Solicitation posted on Mar 24, 2026

This amendment corrects the end date of solicitation 36C24226R0033 stated in amendment A0011 from 12:00EST on 04/01/2026 to 12:00EST on 04/03/2026 as stated previously in amendment A0010. All other terms and conditions remain the same.

From Solicitation posted on Mar 25, 2026

This amendment provides additional information regarding vendor question 4. From amendment A0010: Drawing 1-ES-100 Detail 1 Calls out new Crawl Space walkway in dotted lines on the drawing. Is this New Crawl Space Contractor provided with this Bid? Can more Detail of what is expected be provided? More info will be needed for pricing If the expectation is that contractor is required to remove the spoils, we would need a route where we could get this out of the building, a place where we could load it into a truck and the time that this work could be performed spelled out. Response: For route to remove spoils, see attached file SUBBASEMENT soil removal path and pictures of conditions of path and loading dock below. All work shall be performed outside of regular business hours, Monday-Friday 4pm-6am and week-ends.

From Solicitation posted on Mar 26, 2026

This amendment answers the following Vendor question: Do the contract documents provided by the VA take care of the red requirements form Phillips as long as installation is per bid documents? In other words, is this GC s responsibility though it says Customers A&E shall provide? Response: The contract documents, as issued and stamped by the Engineer of Record, satisfies the Philips design requirement, provided installation is performed in accordance with the bid documents. This requirement is not a GC design responsibility, but falls under the A/E (EOR) scope, which has already been addressed through the signed and sealed drawings. All other terms and conditions remain the same.

From Solicitation posted on Mar 27, 2026

Notice history

15
  1. Presolicitation Posted Jan 02, 2026 View
  2. Solicitation Posted Feb 06, 2026
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Jan 16, 2026Mar 06, 2026
    • Set-Aside: Total Small Business Set-Aside (FAR 19.5)None
  3. Solicitation Posted Feb 09, 2026
    • Description: Description was updated
    • Response Deadline: Mar 06, 2026Mar 17, 2026
  4. Solicitation Posted Feb 12, 2026
    • Description: Description was updated
  5. Solicitation Posted Feb 25, 2026
    • Description: Description was updated
  6. Solicitation Posted Mar 06, 2026
    • Description: Description was updated
    • Response Deadline: Mar 17, 2026Mar 24, 2026
  7. Solicitation Posted Mar 09, 2026
    • Description: Description was updated
  8. Solicitation Posted Mar 13, 2026
    • Description: Description was updated
  9. Solicitation Posted Mar 17, 2026
    • Description: Description was updated
    • Response Deadline: Mar 24, 2026Mar 30, 2026
  10. Solicitation Posted Mar 19, 2026
    • Description: Description was updated
  11. Solicitation Posted Mar 20, 2026
    • Description: Description was updated
    • Response Deadline: Mar 30, 2026Apr 03, 2026
  12. Solicitation Posted Mar 24, 2026
    • Description: Description was updated
    • Response Deadline: Apr 03, 2026Apr 01, 2026
  13. Solicitation Posted Mar 25, 2026
    • Description: Description was updated
    • Response Deadline: Apr 01, 2026Apr 03, 2026
  14. Solicitation Posted Mar 26, 2026
    • Description: Description was updated
  15. Solicitation LATEST Posted Mar 27, 2026
    • Description: Description was updated

Details

Solicitation number 36C24226R0033
Notice ID 18b7ade6ce434586a2498dc698017144
Notice type Solicitation
Product / Service (PSC) Z1DA
NAICS 236220
Archive date May 03, 2026

Award Information

Awardees
0