Z--NM BITTER LAKE NWR ELECTRIC & ROOF 140FGA26Q0031
Summary
AI-generated · May 29, 2026Electrical system upgrade and roof replacement at the Biology Building of Bitter Lake National Wildlife Refuge in Roswell, NM. Replace the non-compliant electrical service with a new 200 amp, three-phase main panel; refeed and repipe electrical distribution to multiple buildings and bring all related components into current electrical-code compliance. Remove about 2,863 square feet of the existing built-up roof on the historic 1937 CCC-constructed Biology Building and install a fleece-back membrane roofing system with all flashings, terminations, penetrations, and accessories, while preserving the structure’s historic integrity. The contractor must provide all labor, materials, equipment, transportation, and supervision.
A site visit is encouraged, with a session on 10 June 2026 at 0900 local time (meet-up details in Section L). All work must be completed as soon as possible but no later than 31 July 2026. The project is estimated between $25,000 and $100,000, and the award will be a single Firm-Fixed-Price contract given on a Best Value basis after evaluating price plus technical and past performance factors described in the RFQ. Submissions are to be made per the RFQ guidelines.
NM-BITTER LAKE NWR-ELECTRICAL UPGRADE AND ROOF REPLACEMENT The U.S. Fish and Wildlife Service (FWS) requires construction services to perform an electrical system upgrade and roof replacement within the Biology Compound at Bitter Lake National Wildlife Refuge, Roswell, New Mexico. Work includes replacing the existing non compliant electrical service with a new 200 amp, 3 phase main panel; repiping and refeeding electrical distribution to multiple buildings; and bringing all associated components into compliance with current electrical code. The project also requires removal of approximately 2,863 square feet of the existing built up roof on the historic 1937 CCC constructed Biology Building and installation of a new fleece back membrane roofing system with all required flashings, terminations, penetrations, and accessories. All work shall maintain and protect the historic integrity of the structure. The contractor shall furnish all labor, materials, equipment, transportation, and supervision necessary to complete the project. Interested contractors are highly encouraged to conduct a site visit, per FAR 36.523. A site visit is scheduled for 10 June 2026 at 0900 local time. For meet-up information see the instructions in Section L. All work must be completed as soon as possible but no later than July 31, 2026. All work shall be accomplished in accordance with the provisions of the FWS contract and the attached documents. Per the requirements of FAR 36.204, the project range is estimated to be between $25,000.00 and $100,000.00. This acquisition is a Total Small Business set-aside. All responsible sources with Small Business status may submit a quotation which, if timely received, will be considered. Offers received from concerns that are not Small Business concerns shall be considered nonresponsive and will be rejected. The Government intends to award a single, Firm-Fixed-Price contract. Award selection will be made on a Best Value basis after consideration of price and factors other than price (Technical and Past Performance) as listed in the Request for Quotation (RFQ)/Solicitation. See Terms and Conditions (Contract Clauses), Sections L and M, for the Submission requirements and Evaluation Factors for Award. Requests for information and quotes shall be submitted to Nicole Johnson via email to nicole_johnson@ios.doi.gov
From Solicitation posted on May 27, 2026NM-BITTER LAKE NWR-ELECTRICAL UPGRADE AND ROOF REPLACEMENT Amendment 1 revises the site visit date, moving it from Wednesday, June 10, to Tuesday, June 9, 2026.
From Solicitation posted on Jun 01, 2026NM-BITTER LAKE NWR-ELECTRIC UPGRADE AND ROOF REPLACEMENT The purpose of Amendment 2 is to provide responses to vendor questions and to issue a correction to the Statement of Work (SOW). Specifically, the SOW has been updated to reflect that the project requires replacing the existing 3-phase electrical system with a 2-phase system.
From Solicitation posted on Jun 04, 2026Notice history
3-
-
Solicitation Posted Jun 01, 2026View changes (2)
- Title: NM BITTER LAKE NWR BIO BUILDING ROOF AND ELECTRICA → Z--NM BITTER LAKE NWR ELECTRICAL & ROOF
- Description: Description was updated
-
Solicitation LATEST Posted Jun 04, 2026View changes (2)
- Title: Z--NM BITTER LAKE NWR ELECTRICAL & ROOF → Z--NM BITTER LAKE NWR ELECTRIC & ROOF
- Description: Description was updated
Details
Award Information
Not yet awarded