Z--Dunn Main House Rehabilitation, NPS-PORE 140P8425R0002
Summary
AI-generated · Aug 23, 2025Dunn Main House Rehabilitation and Accessory Dwelling Units Construction at Point Reyes National Seashore involves renovating the Dunn Main House (3 bed/3 bath) and converting an existing Art Studio and a two-car garage into five accessory dwelling units, creating a total 11 beds across multiple units. The work will convert the 3,645-square-foot main house into a 6-bedroom, 3-bath unit plus a 1-bedroom, 1-bath Garden Studio; convert the Art Studio into a 2-bedroom, 1-bath Studio Unit; and convert the garage into two 1-bedroom, 1-bath Garage Studio Units. Optional items include decks; a rooftop solar power system with battery backup and replacement skylights; provision of appliances and window shades; and servicing the existing septic system. The contractor must provide all supervision, labor, equipment, testing, and supplies to complete the project per the specifications and all applicable laws, under a single firm-fixed-price contract, with award based on best value factoring price, project experience, California licensure, and past performance.
Site visits are part of the bid process, with an initial session already held and a second session offered; attendance is encouraged but not mandatory. The solicitation and all attachments will be issued electronically, and amendments have extended the proposal due date, updated wage information, and later provided corrected site sign-in sheets.
DUNN MAIN HOUSE REHABILITATION AND ACCESSORY DWELLING UNITS CONSTRUCTION, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA. The National Park Service (NPS) at Point Reyes National Seashore, located within Marin County, California, has a requirement for the Dunn Main House Rehabilitation and Accessory Dwelling Units Construction. The Work includes the rehabilitation of a farmhouse previously renovated in the 1990s, which will convert the existing 3-bed 3-bath house into an 11-bed, 5-unit housing compound for park employees. Project work includes the comprehensive renovation of the existing 3-bedroom, 3-bathroom 3,645 square-foot Dunn Main House and the conversion of an existing 843 square-foot Art Studio and an existing 920 square-foot two-car garage into accessory dwelling units for park housing. The renovation of the Dunn Main House will improve and split the house into a 6-bedroom 3-bathroom Main House Unit and a 1-bedroom 1-bathroom Garden Studio Unit. The existing Art Studio will be converted into a 2-bedroom 1-bathroom Studio Unit. The existing two-car garage will be converted into two 1-bedroom 1-bathroom Garage Studio Units. Option line item work includes Decks; Rooftop Solar Power System, Battery Backup, & Replace Skylights; Provide and Install Appliances & Window Shades; and Service the Existing Septic Wastewater Treatment System. The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation, once issued. All work shall be performed in accordance with local, state, and federal laws. Per FAR 36.204 the project range is estimated to be between $1,000,000 and $5,000,000. The North American Industry Classification System (NAICS) Code for this requirement is 236220, with a corresponding size standard of $45 million in annual gross receipts for the past three years. This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall not be considered. The Request for Proposal (RFP) will be available on/about June 15, 2025, by electronic means only and can be downloaded along with all related attachments from the Contracting Opportunities website at www.sam.gov. The RFP will close 30 days from the actual date of issuance. The offeror is responsible for periodically checking the website for any Amendments that may be issued prior to the closing date of the RFP. The Government intends to award a single, firm-fixed-price contract. Award selection will be made on a Best Value determination made after consideration of price and factors other than price (project experience, California contractor license, and past performance) as listed in the Request for Proposal. An organized site visit will be scheduled. While not mandatory, offerors are urged and expected to inspect the site where the work will be performed. See Section L of the RFP (when issued) for more information regarding the date, time, and location of the site visit.
From Presolicitation posted on May 30, 2025DUNN MAIN HOUSE REHABILITATION AND ACCESSORY DWELLING UNITS CONSTRUCTION, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA. HOW TO ACCESS SOLICITATION DOCUMENTS: The full solicitation package (Standard Form 1442 and all associated attachments) is available for download from the Attachments section on this page. You can download each attachment individually or download all attachments as a zip file. Refer to the provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a proposal. SITE VISIT INFORMATION: A site visit is scheduled for Monday, June 30, 2025, at 11:00 a.m. Pacific Daylight Time. RSVP to Jason Nemeth, Civil Engineer, Point Reyes National Seashore, at jason_nemeth@nps.gov or 415-858-2562. While not mandatory, offerors are urged and expected to inspect the site where the work will be performed. See Section L of the solicitation for detailed information about the site visit, including meeting location. QUESTIONS? Submit any questions regarding this solicitation in writing to Contracting Officer Alanna Gardner at alanna_gardner@nps.gov and include solicitation number 140P8425R0002 in the subject line of the email.
From Solicitation posted on Jun 15, 2025DUNN MAIN HOUSE REHABILITATION AND ACCESSORY DWELLING UNITS CONSTRUCTION, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA. This Amendment provides the Sign-In Sheet and Site Visit Notes from the recent June 30, 2025 site visit which answers all questions received to date and includes a summary of the Amendment 0001 changes, provides notice of a second site visit opportunity on Wednesday, July 9, 2025 from 1:30p.m. to 3:30p.m. (RSVP to jason_nemeth@nps.gov), and incorporates a recent wage modification. Proposal due date is extended through 3:00p.m. PDT on Thursday, July 17, 2025.
From Solicitation posted on Jul 07, 2025DUNN MAIN HOUSE REHABILITATION AND ACCESSORY DWELLING UNITS CONSTRUCTION, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA. This Amendment 0002 extends the due date of proposals through 3:00 p.m. Pacific Daylight Time (PDT) on July 25, 2025 to allow NPS time to publish the recent site visit sign-in sheet, site visit notes, and answer all questions received to date.
From Solicitation posted on Jul 17, 2025DUNN MAIN HOUSE REHABILITATION AND ACCESSORY DWELLING UNITS CONSTRUCTION, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA. This Amendment 0004 confirms that the proposal due date is extended through 3:00p.m. PDT on Friday, August 1, 2025.
From Solicitation posted on Jul 23, 2025DUNN MAIN HOUSE REHABILITATION AND ACCESSORY DWELLING UNITS CONSTRUCTION, POINT REYES NATIONAL SEASHORE, MARIN COUNTY, CALIFORNIA. This Amendment 0005 provides corrected versions of the site visit sign-in sheets.
From Solicitation posted on Jul 29, 2025Dunn Main House Rehabilitation and Accessory Dwelling Units Construction, Point Reyes National Seashore, Marin County, California.
From Award Notice posted on Sep 22, 2025Notice history
7-
-
Solicitation Posted Jun 15, 2025View changes (3)
- Title: Z--Dunn Main House Rehabilitation, NPS-PORE → Dunn Main House Rehabilitation, NPS-PORE
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
-
Solicitation Posted Jul 07, 2025View changes (3)
- Title: Dunn Main House Rehabilitation, NPS-PORE → Z--Dunn Main House Rehabilitation, NPS-PORE
- Description: Description was updated
- Response Deadline: Jul 14, 2025 → Jul 17, 2025
-
Solicitation Posted Jul 17, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 17, 2025 → Jul 25, 2025
-
Solicitation Posted Jul 23, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 25, 2025 → Aug 01, 2025
-
Award Notice LATEST Posted Sep 22, 2025
Details
Award Information
Award Notices
Posted: Sep 22, 2025
Dunn Main House Rehabilitation and Accessory Dwelling Units Construction, Point Reyes National Seashore, Marin County, California.
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| ATELIER 21 INTERNATIONAL | LFTHCJVJHBE6 | 310Q2 | CALABASAS, CA |
Contacts
Phone
Agency
Place of Performance
USA