Z--CRIP MC Checks and Lateral 73 Construction DOIAFBO260007
Summary
AI-generated · Dec 19, 2025CRIP MC Checks and Lateral 73 Construction are the focus of an upcoming procurement for construction work. The description provides no scope details, performance criteria, or submission instructions, and no specific requirements (such as certifications, brand-name restrictions, or site visits) are listed.
CRIP MC Checks and Lateral 73 Construction
From Presolicitation posted on Dec 18, 2025NOTICE ID: DOIAFBO260007 TITLE: Colorado River Indian Irrigation Project: Main Canal Checks 185 / 270 / 420 and Lateral 73-36-1 Rehabilitation SOLICITATION NUMBER: 140A1626R0005 It is anticipated that the solicitation will be issued on January 21, 2026, on SAM.gov. In anticipation of this posting, an on-site pre-bid site visit will occur on January 28, 2026. This site visit is not mandatory. The meeting will begin at 8:30 am local time (MST) in Building 4 of the BIA Colorado River Agency, which is located at 12124 1st Ave., Parker, AZ and will go until around 10:00 am. Around 10:00 am we will visit each of the four project sites. The site visits should be completed around 1:00 pm. No passes are required, and safety equipment is not necessary. The four sites have the following locations: MC Check 185 - Latitude and Longitude Coordinates 3407'59.85"N, 11418'54.08"W MC Check 270 - Latitude and Longitude Coordinates 3406'41.37"N, 11419'28.88"W MC Check 420 - Latitude and Longitude Coordinates 3404'12.34"N, 11419'31.37"W Lateral 73-36 Check 1 - Latitude and Longitude Coordinates 3354'43.10"N, 11423'25.73"W
From Special Notice posted on Jan 15, 2026Notice history
2-
-
Special Notice LATEST Posted Jan 15, 2026View changes (2)
- Description: Description was updated
- Notice Type: Presolicitation → Special Notice
Details
Award Information
Not yet awarded
Contacts
Phone