Z--Conlon Creek Culvert Removal & Restoration, GOGA 140P8626R0003

Solicitation 140P8626R0003 Copied Notice ID a0cba80136e3488686a7c1d0d8386395 Copied INTERIOR, DEPARTMENT OF THE — PWR GOGA(86000)
SAM.gov
Posted
May 01, 2026
Deadline
May 15, 2026
Set-aside
SBA
NAICS
237990
PSC
Z2KB

Summary

AI-generated · May 02, 2026

Repair and stabilize Conlon Creek after the 2015 culvert failure by removing an 80-foot buried corrugated metal culvert, and constructing an engineered rock ramp to stabilize the culvert footprint and head cut. Build three rock-step pools to provide aquatic habitat, and stabilize an adjacent 75-foot gully to reduce fine-sediment input to Redwood Creek. Reuse on-site bank and bed materials where possible, and purchase/transport rock slope protection. The contractor will provide all supervision, labor, equipment, testing, and supplies, including dewatering and water-diversion systems, selective demolition, construction of weirs, ramp, and apron, plus permanent erosion control and plantings. Optional line items include hauling excess soils to a landfill, preparing as-built drawings, and importing rock for engineered streambed material. In-channel work is limited to a defined seasonal window.

Permits and compliance with all applicable laws are required. This is a total small-business set-aside; only small businesses may submit proposals. The RFP will be issued electronically with proposals due within 30 days of issuance, and the government will award a single firm-fixed-price contract based on best value, considering factors such as technical approach, schedule, project and key personnel experience, California state contractor license, and past performance. An organized site visit will be scheduled and is encouraged but not mandatory. Refer to the issued RFP for site-visit details and additional information.

Pre-Solicitation Announcement: Conlon Creek Culvert Removal & Restoration, GOGA The Department of the Interior, National Park Service (NPS) at Golden Gate National Recreation Area (GOGA) has a requirement to implement a long-term channel stabilization project that would repair damage caused by a 2015 culvert blowout on a tributary to Redwood Creek. Emergency stabilization efforts occurred in 2016. The current channel stabilization design represents input from National Marine Fisheries Service, Regional Water Quality Control Board, as well as NPS technical staff (geomorphologist, aquatic ecologist) and engineering hydrologic consultants. The specifications and drawings call for stabilizing the footprint of the culvert failure and head cut with an engineered rock ramp, construction of three rock step pools to provide for some habitat for aquatic animals, and the removal of a buried and rusted corrugated metal culvert (80 ft). Work would occur along up to 250 ft of creek. In addition, an adjacent gully (75 ft) that is actively contributing sediments to downstream Redwood Creek would be stabilized and filled to reduce future contributions of fine sediments. Existing bank and bed materials would be re-used either in the channel or as fill for the adjacent gully. Rock slope protection would need to be purchased and transported to the site. The Contractor shall provide all supervision, labor, equipment, testing, and supplies necessary to complete the work as identified in the project specifications and associated documents provided as attachments to the solicitation. Contract work includes: 1. Mobilization and Demobilization 2. Install, Operate, and Maintain Dewatering and Water Diversion Systems 3. Selective Demolition 4. Construction of Weirs, Ramp, and Apron 5. Permanent Erosion Control Treatments and Plantings Option Items 1. Haul Excess Soils to Landfill 2. Prepare As-Built Drawings 3. Import Rock for Engineered Streambed Material In channel work is restricted to between June 15, and October 15, 2026 All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work. All work shall be performed in accordance with local, state, and federal laws. The Contractor shall obtain all necessary permits required to successfully complete the work. The North American Industry Classification System (NAICS) Code for this requirement is 237990, with a corresponding size standard of $45 million in annual gross receipts for the past three years. This acquisition is a Total Small Business Set-Aside. Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall not be considered. Federal Acquisition Regulation (FAR) 36.211(b) requires agencies to provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at: https://www.doi.gov/pam/acquisition/policy/constructioncontract. The Request for Proposal (RFP) will be available on/about Monday, May 18, 2026, by electronic means only and can be downloaded along with all related attachments from the Contracting Opportunities website at ww.sam.gov. The RFP will close 30 days from the actual date of issuance. The offeror is responsible for periodically checking the website for any Amendments that may be issued prior to the closing date of the RFP. The Government intends to award a single, firm-fixed-price contract. All responsible sources may submit a proposal which will be considered by the agency. Evaluation for award will be made in accordance with the negotiated acquisition procedures outlined in FAR Part 15. Award selection will be made on a Best Value determination made after consideration of price and factors other than price (Technical Approach, Schedule, Project Experience, Key Personnel Experience, California State Contractor License, and Past Performance) as listed in Section M of the Request for Proposal. An organized site visit will be scheduled. While not mandatory, offerors are urged and expected to inspect the site where the work will be performed. See Section L of the RFP (when issued) for more information regarding the date, time, and location of the site visit.

From Presolicitation posted on May 01, 2026

CONLON CREEK CULVERT REMOVAL & RESTORATION, GOLDEN GATE NATIONAL RECREATION AREA HOW TO ACCESS SOLICITATION DOCUMENTS: The full solicitation package (Standard Form 1442 and all associated attachments) is available for download from the Attachments section on this page. You can download each attachment individually or download all attachments as a zip file. Refer to the provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a proposal. SITE VISIT INFORMATION: A site visit is scheduled. Information is located in Section L of the solicitation. RSVP required. While not mandatory, offerors are urged and expected to inspect the site where the work will be performed. See Section L of the solicitation for detailed information about the site visit, including meeting location. QUESTIONS? Submit any questions regarding this solicitation in writing to Contract Specialist, Quinn Rankin, at Quinn_Rankin@ios.doi.gov and include solicitation number 140P8626R0003 in the subject line of the email.

From Solicitation posted on May 22, 2026

CONLON CREEK CULVERT REMOVAL & RESTORATION, GOLDEN GATE NATIONAL RECREATION AREA This Amendment 0001 is to: 1. CHANGE THE SITE VISIT DATE from June 15 to Thursday, June 4, 2026, at 10:00 AM PDT. 2. No other changes have been made. HOW TO ACCESS SOLICITATION DOCUMENTS: The full solicitation package (Standard Form 1442 and all associated attachments) is available for download from the Attachments section on this page. You can download each attachment individually or download all attachments as a zip file. Refer to the provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a proposal. SITE VISIT INFORMATION: A site visit is scheduled. Information is located in Section L of the solicitation. RSVP required. While not mandatory, offerors are urged and expected to inspect the site where the work will be performed. See Section L of the solicitation for detailed information about the site visit, including meeting location. QUESTIONS? Submit any questions regarding this solicitation in writing to Contract Specialist, Quinn Rankin, at Quinn_Rankin@ios.doi.gov and include solicitation number 140P8626R0003 in the subject line of the email.

From Solicitation posted on May 26, 2026

CONLON CREEK CULVERT REMOVAL & RESTORATION, GOLDEN GATE NATIONAL RECREATION AREA This Amendment 0002 is to: 1. Include the site visit sign-in sheet. 2. Include Attachment 13 Questions & Answers. 3. Include revised Attachment 1 Specifications. 4. Include revised Attachment 2 Drawings. 5. No other changes have been made. This Amendment 0001 is to: 1. CHANGE THE SITE VISIT DATE from June 15 to Thursday, June 4, 2026, at 10:00 AM PDT. 2. No other changes have been made. HOW TO ACCESS SOLICITATION DOCUMENTS: The full solicitation package (Standard Form 1442 and all associated attachments) is available for download from the Attachments section on this page. You can download each attachment individually or download all attachments as a zip file. Refer to the provisions and clauses and other attachments for additional information about this requirement and instructions on how to submit a proposal. SITE VISIT INFORMATION: A site visit is scheduled. Information is located in Section L of the solicitation. RSVP required. While not mandatory, offerors are urged and expected to inspect the site where the work will be performed. See Section L of the solicitation for detailed information about the site visit, including meeting location. QUESTIONS? Submit any questions regarding this solicitation in writing to Contract Specialist, Quinn Rankin, at Quinn_Rankin@ios.doi.gov and include solicitation number 140P8626R0003 in the subject line of the email.

From Solicitation posted on Jun 12, 2026

Notice history

4
  1. Presolicitation Posted May 01, 2026
  2. Solicitation Posted May 22, 2026
    • Title: Z--Conlon Creek Culvert Removal & Restoration, GOGAConlon Creek Culvert Removal & Restoration, GOGA
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: May 15, 2026Jun 22, 2026
  3. Solicitation Posted May 26, 2026
    • Title: Conlon Creek Culvert Removal & Restoration, GOGAZ--Conlon Creek Culvert Removal & Restoration, GOGA
    • Description: Description was updated
  4. Solicitation LATEST Posted Jun 12, 2026
    • Description: Description was updated

Details

Solicitation number 140P8626R0003
Notice ID a0cba80136e3488686a7c1d0d8386395
Notice type Presolicitation
Product / Service (PSC) Z2KB
NAICS 237990
Archive date May 30, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Rankin, Quinn

Email

Agency

INTERIOR, DEPARTMENT OF THE
NATIONAL PARK SERVICE
PWR GOGA(86000)

Place of Performance

Dates

Posted May 01, 2026 3 months ago
Last Updated Aug 06, 2026 2 days ago
Due May 15, 2026 2 months ago