Y1DZ--Renovate Pre-Engineered Metal Building 115 Project 671A4-22-109 36C25725R0051
Summary
AI-generated · Aug 24, 2025Renovate Pre-Engineered Metal Building 115 (Project 671A4-22-109) requires a contractor to perform renovation work per updated SOW attachments. The SOW has been replaced with versions dated 06-05-2025 and 06-06-2025, and a second site-visit has been added with its sign-in sheet, along with updated site-visit documentation.
bids have seen multiple timing changes: the proposal due date was extended from 7/8/25 to 7/31/25, then to 8/12/25, and most recently shortened to 8/5/25. Amendments also incorporate RFIs and attachment replacements.
Please see solicitation document 36C25725R0051 for solicitation details. Amendment 1 is posted to replace Attachment 1 SOW in it's entirity with Attachment 1 SOW dated 06-05-2025. Amendment 2 is posted to replace Attachment 1 SOW in its entirity with the Attachment 1 SOW dated 06-06-2025. Amendment 3 is posted to provide the site visit sign in sheet.
From Solicitation posted on Jun 12, 2025Please see solicitation document 36C25725R0051 for solicitation details. Amendment 1 is posted to replace Attachment 1 SOW in it's entirity with Attachment 1 SOW dated 06-05-2025. Amendment 2 is posted to replace Attachment 1 SOW in its entirity with the Attachment 1 SOW dated 06-06-2025. Amendment 3 is posted to provide the site visit sign in sheet. Amendment 4 is posted to extend the proposal due date from 7/8/25 to 7/31/25.
From Solicitation posted on Jul 02, 2025Please see solicitation document 36C25725R0051 for solicitation details. Amendment 1 is posted to replace Attachment 1 SOW in it's entirity with Attachment 1 SOW dated 06-05-2025. Amendment 2 is posted to replace Attachment 1 SOW in its entirity with the Attachment 1 SOW dated 06-06-2025. Amendment 3 is posted to provide the site visit sign in sheet. Amendment 4 is posted to extend the proposal due date from 7/8/25 to 7/31/25. Amendment 5 is posted to incorporate several changes to the solicitation including: 2nd site visit, proposal due date extension, RFIs, and Attachment replacements.
From Solicitation posted on Jul 10, 2025Please see solicitation document 36C25725R0051 for solicitation details. Amendment 1 is posted to replace Attachment 1 SOW in it's entirity with Attachment 1 SOW dated 06-05-2025. Amendment 2 is posted to replace Attachment 1 SOW in its entirity with the Attachment 1 SOW dated 06-06-2025. Amendment 3 is posted to provide the site visit sign in sheet. Amendment 4 is posted to extend the proposal due date from 7/8/25 to 7/31/25. Amendment 5 is posted to incorporate several changes to the solicitation including: 2nd site visit, proposal due date extension to 8/12/25, RFIs, and Attachment replacements. Amendment 6 is posted to provide the site visit sign in sheet from the 2nd site visit.
From Solicitation posted on Jul 18, 2025Please see solicitation document 36C25725R0051 for solicitation details. Amendment 1 is posted to replace Attachment 1 SOW in it's entirity with Attachment 1 SOW dated 06-05-2025. Amendment 2 is posted to replace Attachment 1 SOW in its entirity with the Attachment 1 SOW dated 06-06-2025. Amendment 3 is posted to provide the site visit sign in sheet. Amendment 4 is posted to extend the proposal due date from 7/8/25 to 7/31/25. Amendment 5 is posted to incorporate several changes to the solicitation including: 2nd site visit, proposal due date extension to 8/12/25, RFIs, and Attachment replacements. Amendment 6 is posted to provide the site visit sign in sheet from the 2nd site visit. Amendment 7 is posted to reduce the proposal due date from 8/12/25 to 8/5/25 and to add RFIs.
From Solicitation posted on Jul 24, 2025Please see solicitation document 36C25725R0051 for solicitation details. Amendment 1 is posted to replace Attachment 1 SOW in it's entirity with Attachment 1 SOW dated 06-05-2025. Amendment 2 is posted to replace Attachment 1 SOW in its entirity with the Attachment 1 SOW dated 06-06-2025. Amendment 3 is posted to provide the site visit sign in sheet. Amendment 4 is posted to extend the proposal due date from 7/8/25 to 7/31/25. Amendment 5 is posted to incorporate several changes to the solicitation including: 2nd site visit, proposal due date extension to 8/12/25, RFIs, and Attachment replacements. Amendment 6 is posted to provide the site visit sign in sheet from the 2nd site visit. Amendment 7 is posted to reduce the proposal due date from 8/12/25 to 8/5/25 and to add RFIs.
From Solicitation posted on Nov 25, 2025Notice history
6-
-
Solicitation Posted Jul 02, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 08, 2025 → Jul 31, 2025
-
Solicitation Posted Jul 10, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Jul 31, 2025 → Aug 12, 2025
-
Solicitation Posted Jul 24, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Aug 12, 2025 → Aug 05, 2025
-
Solicitation LATEST Posted Nov 25, 2025No changes from previous notice