Y1DA--635-21-700 | Construction EHRM Infrastructure Upgrades | OKC, OK | Hicks/Cruthers - LPTA 36C77625R0044
Summary
AI-generated · Aug 25, 2025Upgrade facility infrastructure to support the new Electronic Health Record Modernization (EHRM) system per OEHRM Site Infrastructure Requirements. The scope includes electrical upgrades (panel, normal and emergency power), bonding, UPS, Building Management System interfaces, HVAC assessment/ upgrades or renovations, space reconfiguration or expansion (demo, new construction, finishes), communications infrastructure (new data outlets, patch panels, Cat 6A cable), and campus-wide enhancements to fiber backbone within and between buildings, plus hazardous material abatement. Affected buildings include 1, 5, 19, 21, the site, Lawton, and Friendship House.
No award data is provided; the records show identical solicitation content across entries, with no award dates or amounts recorded. Therefore, no changes or new information beyond the stated scope are indicated, and no site-visit, brand-name, or certification requirements are specified beyond the described OEHRM infrastructure requirements.
.
From Solicitation posted on Jun 25, 2025.
From Solicitation posted on Jun 30, 2025PROJECT DESCRIPTION: Upgrade the facility infrastructure tosupport the new Electronic Health Record Modernization (EHRM) system inaccordance with VA OEHRM Site Infrastructure Requirements (provided by VHA).This project includes but not limited to the following infrastructureimprovements: Electrical (electrical panel upgrade, power (normal andemergency)), Bonding, UPS, Building Management System interfaces, assess fornew and upgrades to existing HVAC, reconfiguration, expansion and renovationof existing space (demo, new construction, finishes), communicationinfrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) inbuildings as necessary, physical upgrades, assess and upgrade fiberinfrastructure backbone campus wide within buildings and between buildings,hazardous material abatement. Project Buildings locations include Buildings1,5,19,21, site, Lawton and Friendship House
From Solicitation posted on Jul 10, 2025PROJECT DESCRIPTION: Upgrade the facility infrastructure tosupport the new Electronic Health Record Modernization (EHRM) system inaccordance with VA OEHRM Site Infrastructure Requirements (provided by VHA).This project includes but not limited to the following infrastructureimprovements: Electrical (electrical panel upgrade, power (normal andemergency)), Bonding, UPS, Building Management System interfaces, assess fornew and upgrades to existing HVAC, reconfiguration, expansion and renovationof existing space (demo, new construction, finishes), communicationinfrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) inbuildings as necessary, physical upgrades, assess and upgrade fiberinfrastructure backbone campus wide within buildings and between buildings,hazardous material abatement. Project Buildings locations include Buildings1,5,19,21, site, Lawton and Friendship House
From Solicitation posted on Jul 15, 2025PROJECT DESCRIPTION: Upgrade the facility infrastructure tosupport the new Electronic Health Record Modernization (EHRM) system inaccordance with VA OEHRM Site Infrastructure Requirements (provided by VHA).This project includes but not limited to the following infrastructureimprovements: Electrical (electrical panel upgrade, power (normal andemergency)), Bonding, UPS, Building Management System interfaces, assess fornew and upgrades to existing HVAC, reconfiguration, expansion and renovationof existing space (demo, new construction, finishes), communicationinfrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) inbuildings as necessary, physical upgrades, assess and upgrade fiberinfrastructure backbone campus wide within buildings and between buildings,hazardous material abatement. Project Buildings locations include Buildings1,5,19,21, site, Lawton and Friendship House
From Solicitation posted on Jul 16, 2025PROJECT DESCRIPTION: Upgrade the facility infrastructure tosupport the new Electronic Health Record Modernization (EHRM) system inaccordance with VA OEHRM Site Infrastructure Requirements (provided by VHA).This project includes but not limited to the following infrastructureimprovements: Electrical (electrical panel upgrade, power (normal andemergency)), Bonding, UPS, Building Management System interfaces, assess fornew and upgrades to existing HVAC, reconfiguration, expansion and renovationof existing space (demo, new construction, finishes), communicationinfrastructure (new Data outlets, patch panels, upgrade to Cat 6A cable) inbuildings as necessary, physical upgrades, assess and upgrade fiberinfrastructure backbone campus wide within buildings and between buildings,hazardous material abatement. Project Buildings locations include Buildings1,5,19,21, site, Lawton and Friendship House
From Solicitation posted on Jul 23, 2025Notice history
7-
-
Solicitation Posted Jul 10, 2025View changes (3)
- Description: Description was updated
- Response Deadline: Jul 23, 2025 → Jul 30, 2025
- Set-Aside: None → Service-Disabled Veteran-Owned Small Business Set Aside
-
Solicitation Posted Jul 15, 2025No changes from previous notice
-
Solicitation Posted Jul 16, 2025No changes from previous notice
-
Solicitation Posted Jul 23, 2025No changes from previous notice
-
Award Notice LATEST Posted Sep 19, 2025
Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| HURLEY JV, LLP | J1LWSNNJ6EY9 | 9KJX4 | COLORADO SPRINGS |
Contacts
Contract Specialist
Phone