Contacts, documents and full notice history are available with a subscription.
Solicitation SDVOSBC Expired 5 notices 1 document

Y1DA--528A6-26-611 Abate Asbestos Pipe Insulation - B76 36C24226B0021

Solicitation 36C24226B0021 Copied Notice ID 34e0ff204e644619b8d7f703c2296204 Copied VETERANS AFFAIRS, DEPARTMENT OF — 242-NETWORK CONTRACT OFFICE 02 (36C242)
SAM.gov
Posted
Nov 21, 2025
Deadline
Dec 17, 2025
Set-aside
SDVOSBC
NAICS
562910
PSC
Y1DA

Summary

AI-generated · Nov 22, 2025

Provide abatement and demolition services at the Buffalo VAMC, Building 1 Room 625B, to remove friable asbestos-containing materials and interior finishes in accordance with all applicable regulations and master specifications. Tasks include demolishing a plaster ceiling (~330 sq ft) with asbestos-containing material above, abating approximately 50 ft of ACM pipe insulation and mudded fittings, removing ~330 sq ft of black floor mastic with ACM fragments, and abating ACM inside two radiators. Work must be performed under abatement conditions, with remaining ACM encapsulated where it recesses into structures, and air monitoring provided by the VA. Contractors must hold active NYS asbestos licenses and ensure technicians have the required asbestos certificates (handler/supervisor endorsements); provide their own PPE and access equipment; coordinate access through the COR; participate in a kickoff and preconstruction conference, and submit a comprehensive package (work plan, schedules, hazard analyses, safety plans, employee lists, and related submittals). Records management and data rights are governed by the agency, and safety and security requirements apply, including key control and restricted access to VA facilities.

A presolicitation indicates an upcoming Bath VA Medical Center project to abate ACM pipe insulation in Building 76, with work conducted in a fully operational medical center and possible off-hours work as directed by the COR. The contractor will have 30 days from notice to proceed to complete the work, and the project will require adherence to all local, state, and federal ACM removal and disposal rules. The anticipated scope is a small-capital-style project with a cost range, and a site visit is planned to provide details; the solicitation will also specify the required safety, scheduling, and submittal requirements. This notice also notes past awards with no disclosed monetary amounts.

This pre-solicitation notice is to inform that the Bath VA Medical Center, Bath, New York will be posting a solicitation on or about November 21st, 2025 for Abate Asbestos Pipe Insulation - B76 at the Bath VA Medical Center. The Scope of this project includes but is not limited to the abatement of ACM pipe insulation found within Building 76. Contactor shall follow all requirements and procedures set by the local, state, and federal rule, regulation, and guidelines for the proper removal and disposal of ACM. Building 76 being a fully operational Medical Center may restrict the hours of work and may require off-tour work to ensure continuous operations of the facility as directed by the COR. Contractor shall have 30 days from the Notice to Proceed to complete all work. The NAICS code is 562910. The small business standard is $25.0 M. The cost range is between $25,000 and $100,000. Information regarding the one and only site visit scheduled will be stated in the Solicitation and is estimated to be on or about 12/3/2025.

From Presolicitation posted on Nov 21, 2025

2 STATEMENT OF WORK (SOW): SUMMARY: This firm fixed price purchase order is for the provision of Abatement and Demolition Services the Buffalo VAMC located at 3495 Bailey Ave, Buffalo, NY 14215 to be completed within 21 days of award. OVERVIEW: All activities in this scope of work will be completed in Building 1 Room 625B. Services are to include abatement and demolition of existing interior finishes, All activities in this scope of work shall be done under abatement conditions. REQUIREMENTS: The Contractor shall provide personnel, material, services, and facilities to perform, accomplish, and deliver the required services detailed in this scope of work. Asbestos abatement shall be performed in accordance with all federal and state regulations and PG 18 1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 02 82 11 TRADITIONAL ASBESTOS ABATEMENT. SCOPE OF SERVICES: The work to be performed shall be performed in Building 1, Room 625B and shall be completed within 21 days of award and shall include the following: Demolish approximately 330 square feet of plaster ceiling in its entirety to include all wire mesh. There is known to be disturbed friable asbestos containing material (ACM) located on top of the plaster soffit and ceiling which shall be abated. Abate approximately 50 linear feet of ACM Duplex pipe insulation and mudded joint fittings above the plaster soffit and ceiling. Abate approximately 330 square feet of black floor mastic, the mastic is found to be non-ACM but fragments of ACM 12 x12 floor tile remain. Abate all ACM inside two (2) radiators that is located on the backside of the metal baffles. REQUIREMENTS: Demolition and Abatement performed under this contract shall be performed in accordance with 10 NYCRR Part 73 and PG 18 1: MASTER CONSTRUCTION SPECIFICATIONS. Demolition and Abatement work shall include, but is not limited to, all labor, material, equipment, and supervision to perform the required demolition, abatement, encapsulation, and disposal. All asbestos containing material shall be demolished and abated mechanically, chemical abatement shall not be permitted. Where the ACM recesses into the floor, ceiling, and adjacent walls, any remaining exposed ACM shall be encapsulated to prevent personnel exposure to any ACM during wall reconstruction. Air monitoring services during abatement activities shall be provided by the VA. CONTRACTOR QUALIFICATIONS: The Contractor shall have an active New York State Department of Labor Asbestos Handling License. All technicians working under this contract on abatement activities shall have an active New York State Department of Labor Asbestos Certificate with one of the following endorsements: Asbestos Handler (worker) Supervisor PERSONAL PROTECTIVE EQUIPMENT (PPE): The Contractor is responsible for obtaining/providing, inspecting, and maintaining any required Personal Protective Equipment (PPE) and access equipment (lifts, scaffolding, etc.) necessary to perform services identified in this scope of work. GUIDING DOCUMENTS: The following documents are applicable to this Scope of Work (SOW) to the extent specified herein. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of applicable documents, whether they are listed here or not. 01 00 00 GENERAL REQUIREMENTS 01 32 16.15 PROJECT SCHEDULES (SMALL PROJECTS) 01 35 26 SAFETY REQUIREMENTS 01 74 19 CONSTRUCTION WASTE MANAGEMENT 02 41 00 DEMOLITION 02 82 11 TRADITIONAL ASBESTOS ABATEMENT 02 82 13.19 FLOOR AND MASTIC ABATEMENT HOURS OF COVERAGE: The VAMC is a health care facility providing critical care 24 hours a day; as such disruptions in operations are not feasible and will need to be coordinated closely with the COR. Work shall take place during normal duty hours: Monday-Friday, 7:30am-3:30pm. Requests to conduct work on weekends and outside of normal duty hours must be submitted in writing at least seven (7) working days in advance of the anticipated work to the COR. If this new schedule is agreed upon, work can begin. The original written request will remain with all test documents along with any written agreements relative to the original requests. The following are Federal Holidays observed by the facility and the Contractor shall not expect access to the VA Facility of VA employees on these dates unless notified otherwise by the COR. Preventive maintenance or other services are not to be scheduled on these dates: New Year s Day Martin Luther King, Jr. Day Washington s Birthday Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veteran s Day Thanksgiving Day Christmas Day If it becomes difficult for the Contractor to complete services because of patient care related activities or security issues, the Contractor shall not be obligated to complete testing in the area of concern at the time of their scheduled visit. They will be obligated to complete their work at the time of the next scheduled visit to the facility. The final authority relative to this decision will be the COR. Unless fully absolved by the VA, Contractor shall be responsible for completing all work. ACCESS: Although the VAWNYHS campuses are public facilities, access to facility maintenance areas, electrical areas, mechanical areas, roof access, and certain other portions of the medical facility are restricted from the public. Accessing these areas may require advance notice, pre approval, and scheduling to gain entry. All visits and access requests to the VAWNYHS under this scope of work shall be coordinated through the Contracting Officer Representative (COR) at least 1 week in advance. IDENTIFICATION, PARKING, SMOKING, AND VAMC REGULATIONS/KEY CONTROL SAFETY: All Contractor employees who have access to VA facilities are subject to the same level of investigation as VA employees. Security and badging process to be determined by COR. Contractor employees shall always wear visible identification while on the premises of the VAMC. It is the responsibility of the vendor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. The VAMC will not invalidate or make reimbursement of parking violations of the vendor under any conditions. Smoking is prohibited on VAMC property to include inside privately owned vehicles (POV) parked on VAMC property. Smoking shall only be allowed off VAMC property. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court. The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of rekeying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. GENERAL REQUIREMENTS: In the performance of this contract, the contractor shall take such safety precautions as the Contracting Officer may determine to be reasonably necessary to protect the lives and health of occupants of the building. The Contracting Officer or designee shall notify the Contractor of any safety issues and the action necessary to correct the issues. Such Notice, when served to the Contractor or their representative at the work site shall be deemed sufficient for the corrective actions to be taken. If the Contractor fails or refuses to comply promptly with notified safety deficiencies, the Contracting Officer may issue an order stopping all or part of the work and hold the Contractor in default. No tools or equipment shall be left unattended. All work areas must be clean at the close of the day and shall be left in the same condition as before work started. KICK OFF MEETING AND SITE SURVEY: This will be a joint meeting with both the abatement contractor and the air monitoring Consultant. The Contractor shall attend a Preconstruction Conference. In preparation for this meeting the Contractor shall submit: An updated work plan that adds additional details based upon approved submittal information. Revised or new Activity Hazard Analysis (AHA) based on approved submittals. Any additional clarifying details about the work to be performed that have been updated bases upon the approved submittals. Any action items resulting from this meeting shall be addressed prior to ordering any materials or beginning the actual construction work. This meeting shall comply with the terms of Section 3.1.2 of this SOW and the terms of PG 18 1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 01 35 26 SAFETY REQUIREMENTS (528 21 135); Article 1.6 Preconstruction Conference. RECORDS MANAGEMENT: Contractor shall not create or maintain any records that are not specifically tied to or authorized by the contract using Government IT equipment and/or Government records. Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected by the Freedom of Information Act. Contractor shall not create or maintain any records containing any Government Agency records that are not specifically tied to or authorized by the contract. The Government Agency owns the rights to all data/records produced as part of this contract. The Government Agency owns the rights to all electronic information (electronic data, electronic information systems, electronic databases, etc.) and all supporting documentation created as part of this contract. Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data. Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format (paper, electronic, etc.) or mode of transmission (email, fax, etc.) or state of completion (draft, final, etc.). No disposition of documents will be allowed without the prior written consent of the Contracting Officer. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the agency records schedules. Contractor is required to obtain the Contracting Officer s approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, this contract. The Contractor (and any sub-contractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information. RISK CONTROL: The Contractor shall take all precautions necessary to protect persons and property from injury or damage during performance of this contract. The Contractor shall be responsible for any injury to any Contractor Representative, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by the contractor s fault or negligence. 11 of 15 3/11/2022 SUBMITTALS: Data Item Type Responsible Party Description Date Delivery Qty SOW Ref Spec Ref Duration of Contract 1 Submittal Contractor Daily Status Report Every Morning NLT 0800 email NA 3.1.1 625B Abatement & Demolition Kick off Meeting and Site Survey 2 Submittal Contractor Kickoff Meeting Agenda Kickoff Meeting 5 Business Day(s) email NA 3.2.1 3 Submittal Contractor Work Plan (Draft) Concurrent with Kickoff Meeting Agenda email NA 3.2.1 01 00 00; 1.7.G 4 Submittal Contractor Schedule, Gantt Chart (Draft) Concurrent with Kickoff Meeting Agenda email NA 3.2.1 01 00 00, 1.7.G; 02 82 11, 2.4.1.A Action Contractor Kickoff Meeting and Site Survey NTP +5 Business Day(s) In person @ VAMC 1 3.2.1 VAMC Work Plan (Draft) Comments Concurrent with Kickoff Meeting VAMC Schedule, Gantt Chart (Draft) Comments Concurrent with Kickoff Meeting 5 Submittal Contractor Kickoff Meeting Minutes (Draft) Kickoff Meeting +5 Business Day(s) email NA 3.1.2 VAMC Kickoff Meeting Minutes (Draft) Comments Receipt of Draft +3 Business Day(s) 6 Submittal Contractor Kickoff Meeting Minutes (Final) Receipt of Comments +3 Business Day(s) email NA 3.1.2 Data Item Type Responsible Party Description Date Delivery Qty SOW Ref Spec Ref Submittals 7 Submittal Contractor Work Plan (Final) NTP +5 Calendar Day(s) email NA 01 00 00, 1.7.G 8 Submittal Contractor Schedule, Gantt Chart (Final) NTP +5 Calendar Day(s) email NA 01 00 00, 1.7.G; 02 82 11, 2.4.1.A 9 Submittal Contractor Employee Lists NTP +5 Calendar Day(s) email NA 01 00 00, 1.6.A; 02 82 11, 2.4.1.B 10 Submittal Contractor Keys and lock combinations (doors, tool boxes, equipment) NTP +5 Calendar Day(s) In person @ VAMC 2 01 00 00, 1.6.D 11 Submittal Contractor Electronic Security Memorandum NTP +5 Calendar Day(s) email NA 01 00 00, 1.6.E 12 Submittal Contractor Vehicle registration NTP +5 Calendar Day(s) email NA 01 00 00, 1.6.F 13 Submittal Contractor Accident Prevention Plan (APP) Preconstruction Conference 5 Calendar Day(s) email NA 01 35 26, 1.4 14 Submittal Contractor Fire Safety Plan Preconstruction Conference 5 Calendar Day(s) email NA 01 35 26, 1.14 15 Submittal Contractor Activity Hazard Analysis (AHA) Preconstruction Conference 5 Calendar Day(s) email NA 01 35 26, 1.5 16 Submittal Contractor OSHA Training Certificates Preconstruction Conference 5 Calendar Day(s) email NA 01 35 26, 1.8 Data Item Type Responsible Party Description Date Delivery Qty SOW Ref Spec Ref 18 Submittal Contractor Certificate of Worker's Acknowledgment Preconstruction Conference 5 Calendar Day(s) email NA 02 82 11, 2.4.1.B 25 Submittal Contractor Experience and Qualifications Preconstruction Conference 5 Calendar Day(s) email NA 02 82 11, 2.4.1.H VAMC Submittal Reviews Submittal Receipt +3Calendar Day(s) Preconstruction Conference 28 Submittal Contractor Preconstruction Conference Agenda Preconstruction Conference 5 Business Day(s) email NA 3.1.2 Action Contractor Preconstruction Conference NTP +5 Calendar Day(s) In person @ VAMC 3.2.3 01 35 26; 1.6 2

From Solicitation posted on Nov 21, 2025

Abate Asbestos Pipe Insulation B76 528A6-26-611 GENERAL PROJECT WORK SCOPE DESCRIPTION Existing Conditions: The Bath VAMC is located at 76 Veterans Avenue, Bath, NY 14810. The layout is a campus with more than 30 buildings located on over 200 acres. Normal working hours are Monday Friday 8:00am 4:30pm. The Scope of this project includes but is not limited to the abatement of ACM pipe insulation found within Building 76. Contactor shall follow all requirements and procedures set by the local, state, and federal rule, regulation, and guidelines for the proper removal and disposal of ACM. Building 76 being a fully operational Medical Center may restrict the hours of work and may require off-tour work to ensure continuous operations of the facility as directed by the COR. Contractor shall have 30 days from the Notice to Proceed to complete all work.

From Solicitation posted on Nov 28, 2025

Abate Asbestos Pipe Insulation B76 528A6-26-611 GENERAL PROJECT WORK SCOPE DESCRIPTION Existing Conditions: The Bath VAMC is located at 76 Veterans Avenue, Bath, NY 14810. The layout is a campus with more than 30 buildings located on over 200 acres. Normal working hours are Monday Friday 8:00am 4:30pm. The Scope of this project includes but is not limited to the abatement of ACM pipe insulation found within Building 76. Contactor shall follow all requirements and procedures set by the local, state, and federal rule, regulation, and guidelines for the proper removal and disposal of ACM. Building 76 being a fully operational Medical Center may restrict the hours of work and may require off-tour work to ensure continuous operations of the facility as directed by the COR. Contractor shall have 30 days from the Notice to Proceed to complete all work. Scope of Work: 1. Demolition: a. Contractor is to provide all labor, material, equipment, supervision, to complete the removal of approximately 200 LF of ACM insulation found on existing plumbing from the crawl space and runs vertically through to the 2nd floor. Contractor is required to dispose of all ACM at an approved location offsite. Clear exposure/wall removal is to be completed by Medical Center maintenance shops prior to the start of the abatement. b. Part of scheduled abatement work is within basement/crawl space which is considered a confined space. 2. Safety Measures: a. Review and incorporate risk assessment and interim life safety plans and measures into safety and construction planning. i. Pre Construction Risk Analysis (PCRA) by VA ii. Interim Life Safety Measures (ILSM) by VA b. Generate and follow a safety plan and incorporate risk and life safety assessments. 3. Communication and Standards a. All contract direction, changes, financials, and contract performance are the responsibility of the VAMC Contracting Officer (CO). b. Contracting Officers Technical Representative (COR) is responsible for the day-today operations in project and the primary point of contact (POC) for the project. i. Communications to/from VAMC ii. Technical communications, submittals, RFI s, change orders iii. On site visits for construction and sub-contractors iv. Construction coordination c. Project is required to use Autodesk Construction Cloud Build Platform (ACC) i. Bath VAMC will provide licensing, permissions, and online training for this cloud-based tool at no cost to the contractors. ii. Contractors are required to actively use Build on ACC for project documentation and coordination. iii. ACC is used for submittals, RFI s, project communications and documentation. 1. No contract financial information on ACC. 2. No personal identification information on ACC. Code requirements: The installed product must, at a minimum, be in accordance with all applicable codes including Veterans Affairs standards which can be found at https://www.cfm.va.gov/til/. This will include, but not be limited to: Department of Veterans Affairs Design Manuals, VA Publications, and Construction Standards, National Fire Protection Code (NFPA), Life Safety Code, Underwriters Laboratory (UL), International Building Code IBC, National Electric Code (NEC), the VA Information Security Handbook 6500.6, Occupational Health and Safety (OSHA), and Environmental Protection Agency (EPA) requirements (to include Mold Remediation in Schools and Commercial Buildings). All work will be completed by certified individuals. Contract Drawings: Please see attached. Specifications: Please see attached. General Requirements: A. The contractor shall review the contract documents for conflicts. Where conflicts exist work shall not proceed until the COR has been notified and has given direction. B. Where incidental work is required to accomplish work shown on the drawings, this work is implied and shall be included as part of the base bid. C. Prior to any work commencing in an area, the contractor shall notify the COR of his intention to work in the area and shall schedule a walkthrough with the COR to determine existing conditions. D. After the work, the existing work areas shall be returned to their original state before final approval shall be given. After the completion of construction, the contractor shall completely clean all surfaces of construction debris. E. The contractor shall receive all deliveries of materials, equipment, tools, or other goods off station, and bring them to the job site. The Bath VA shall not accept deliveries for project purposes. F. The contractor shall prepare and submit an excel spreadsheet submittal log listing all submittals required. The worksheet shall be submitted by the contractor and reviewed and re-submitted as necessary. G. The contractor shall not proceed with any on-site work until the completion of the submittal process or approval to proceed from the CO and COR without completion of the submittal process. Not less than 14 calendar days shall be planned for COR review of each submittal. Resubmittals shall be provided as required by the COR, and shall be treated as a new, separate submittal. H. Any non-lead time materials will only be paid for when installed. I. Any items identified as punch list items will be fixed prior to project closeout. J. Special care will be taken to secure tools and construction equipment during construction as this facility has patients in it. K. Work cleanliness must be adhered to throughout the project. L. Sounds and vibrations must be kept to a minimum to avoid patient disruption. The COR reserves the right to stop work if sound and vibrations are impacting patient living or employees. M. Contractor staging area is east of railroad tracks, coordinate with COR. N. Off tour work may be required to minimize the impact on Veterans and employees. O. The contractor shall warranty all work including for 1 year from the date of acceptance. Warranty shall include any labor or parts necessary to ensure complete functionality of the new area. P. The contractor shall plan accordingly to stage and store materials in the contractor s designated area shown. Q. The contractor shall be responsible for coordinating any traffic interruption with the COR. The contractor is responsible for providing interior pedestrian traffic control as well as any exterior traffic control personnel as needed during the period of the performance. Submittals: Submittals are required for all items outlined in the specification and include but are not limited to the submittals as shown in the submittal log. Project Duration: The total project duration for this project is not to exceed 30 days from the date of the NTP issuance. This includes all processes starting with submission and approval of all submittals and ending with final punch list c

From Solicitation posted on Dec 10, 2025

Abate Asbestos Pipe Insulation B76 528A6-26-611 GENERAL PROJECT WORK SCOPE DESCRIPTION Existing Conditions: The Bath VAMC is located at 76 Veterans Avenue, Bath, NY 14810. The layout is a campus with more than 30 buildings located on over 200 acres. Normal working hours are Monday Friday 8:00am 4:30pm. The Scope of this project includes but is not limited to the abatement of ACM pipe insulation found within Building 76. Contactor shall follow all requirements and procedures set by the local, state, and federal rule, regulation, and guidelines for the proper removal and disposal of ACM. Building 76 being a fully operational Medical Center may restrict the hours of work and may require off-tour work to ensure continuous operations of the facility as directed by the COR. Contractor shall have 30 days from the award to complete all work.

From Solicitation posted on Dec 11, 2025

Notice history

5
  1. Presolicitation Posted Nov 21, 2025
  2. Solicitation Posted Nov 21, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Set-Aside: Service-Disabled Veteran-Owned Small Business Set AsideNone
  3. Solicitation Posted Nov 28, 2025
    • Description: Description was updated
  4. Solicitation Posted Dec 10, 2025
    • Description: Description was updated
  5. Solicitation LATEST Posted Dec 11, 2025
    • Description: Description was updated
    • Set-Aside: NoneService-Disabled Veteran-Owned Small Business Set Aside

Details

Solicitation number 36C24226B0021
Notice ID 34e0ff204e644619b8d7f703c2296204
Notice type Presolicitation
Product / Service (PSC) Y1DA
NAICS 562910
Place of performance Bath, New York
Archive date Feb 15, 2026

Award Information

Awardees
0

Documents

1
View on SAM.gov

Contacts

primary
Devan Bertch

Contracting Officer

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
242-NETWORK CONTRACT OFFICE 02 (36C242)

Place of Performance

Bath VA Medical Center 76 Veterans Ave
Bath, New York 14810
USA

Dates

Posted Nov 21, 2025 8 months ago
Last Updated Aug 06, 2026 1 day ago
Due Dec 17, 2025 7 months ago