Y1DA--528A6-25-614 Replace Sidewalks Station Wide 36C24226B0007

Solicitation 36C24226B0007 Copied Notice ID 71a95892faa44e67966c0c97fc29c352 Copied VETERANS AFFAIRS, DEPARTMENT OF — 242-NETWORK CONTRACT OFFICE 02 (36C242)
SAM.gov
Posted
Oct 17, 2025
Deadline
Dec 10, 2025
Set-aside
SDVOSBC
NAICS
238110
PSC
Y1DA

Summary

AI-generated · Oct 18, 2025

Replace sidewalks station-wide at the Bath VA Medical Center, including demolition/removal of existing sidewalks, subbase preparation, installation of new concrete sidewalks with ADA tactile warning surfaces, and restoration of disturbed lawns. The project must be completed within 120 days from the Notice to Proceed, covering all steps from submittal approvals to final punch list.

A site visit will be conducted (the solicitation will specify the one and only date/time). Bids require a 20% bid bond, and performance and payment bonds will be required. The project is expected to cost between $250,000 and $500,000.

This pre-solicitation notice is to inform that the VA Medical Center, Bath, New York will be posting a solicitation on or about November 4th, 2025 for Replace Sidewalks Station Wide at the Bath VA Medical Center. Project No. 528A6-25-614 The Scope of this project includes but is not limited to demolishing/removing existing sidewalks, preparing subbase, installing new concrete sidewalks, including ADA tactile warning surfaces, & restoring disturbed lawns. The total project duration for this project is not to exceed 120 days from the date of the NTP issuance. This includes all processes starting with submission and approval of all submittals and ending with final punch list completion. The NAICS code is 238110 - Poured Concrete Foundation and Structure Contractors. The small business standard is $19.0 M. The cost range is between $250,000 and $500,000. Information regarding the one and only site visit scheduled will be stated in the Solicitation. A 20% Bid Bond must be submitted with the bid. Performance and Payment bonds will be required.

From Presolicitation posted on Oct 17, 2025

REPLACE SIDWALKS, STATION WIDE 528A6-25-614 GENERAL PROJECT WORK SCOPE DESCRIPTION Existing Conditions: The Bath VAMC is located at 76 Veterans Avenue, Bath, NY 14810. The layout is a campus with more than 30 buildings located on over 200 acres. Normal working hours are Monday Friday 8:00am 4:30pm. Current sidewalks, station wide, are deteriorating and in need of repair/replacement. The Scope of this project includes but is not limited to demolishing/removing existing sidewalks, preparing subbase, installing new concrete sidewalks, including ADA tactile warning surfaces, & restoring disturbed lawns. Scope of Work: Demolition: Contractor is to provide all labor, material, equipment, supervision, to complete demolition of existing sidewalks as well as an existing metal handrail near the south end driveway of B-76 as identified in the contract drawings. Contractor is required to dispose of all demolition at an approved location offsite. Site Work: Contractor is to provide all labor, material, equipment, supervision, to excavate unsuitable base material and place new subbase material as specified. Contractor is required to locate all underground utilities and is responsible for all costs associated with any utility strike or damage. Contractor is to form new sidewalks to be 6 feet wide, unless otherwise specified in the drawings, and to be a minimum of 6 thick with the specified reinforcement. Contractor is to pin new concrete sidewalk into existing sidewalk where applicable. Contractor is to install cast-in-place, cast-iron with epoxy coat finish ADA tactile warning surfaces where specified in the contract drawings. Contractor is to provide and install new black anodized steel hand railing as specified. Contractor is to coordinate all 3rd party testing necessary as specified. All work to be in compliance with contract drawings, and specifications. Code requirements: The installed product must, at a minimum, be in accordance with all applicable codes including Veterans Affairs standards which can be found at https://www.cfm.va.gov/til/. This will include, but not be limited to: Department of Veterans Affairs Design Manuals, VA Publications, and Construction Standards, National Fire Protection Code (NFPA), Life Safety Code, Underwriters Laboratory (UL), International Building Code IBC, National Electric Code (NEC), the VA Information Security Handbook 6500.6, Occupational Health and Safety (OSHA), and Environmental Protection Agency (EPA) requirements (to include Mold Remediation in Schools and Commercial Buildings). All work will be completed by certified individuals. Contract Drawings: Please see attached. Specifications: Please see attached. General Requirements: The contractor shall review the contract documents for conflicts. Where conflicts exist work shall not proceed until the COR has been notified and has given direction. Where incidental work is required to accomplish work shown on the drawings, this work is implied and shall be included as part of the base bid. Prior to any work commencing in an area, the contractor shall notify the COR of his intention to work in the area and shall schedule a walkthrough with the COR to determine existing conditions. After the work, the existing work areas shall be returned to their original state before final approval shall be given. After the completion of construction, the contractor shall completely clean all surfaces of construction debris. The contractor shall receive all deliveries of materials, equipment, tools, or other goods off station, and bring them to the job site. The Bath VA shall not accept deliveries for project purposes. The contractor shall prepare and submit an excel spreadsheet submittal log listing all submittals required. The worksheet shall be submitted by the contractor and reviewed and re-submitted as necessary. The contractor shall not proceed with any on-site work until the completion of the submittal process or approval to proceed from the CO and COR without completion of the submittal process. Not less than 14 calendar days shall be planned for COR review of each submittal. Re-submittals shall be provided as required by the COR, and shall be treated as a new, separate submittal. Any non-lead time materials will only be paid for when installed. Any items identified as punch list items will be fixed prior to project closeout. Special care will be taken to secure tools and construction equipment during construction as this facility has patients in it. Work cleanliness must be adhered to throughout the project. Sounds and vibrations must be kept to a minimum to avoid patient disruption. The COR reserves the right to stop work if sound and vibrations are impacting patient living or employees. Off tour work may be required to minimize the impact on Veterans and employees. The contractor shall warranty all work including for 1 year from the date of acceptance. Warranty shall include any labor or parts necessary to ensure complete functionality of the new area. The contractor shall plan accordingly to stage and store materials in the contractor s designated area shown. The contractor shall be responsible for coordinating any traffic interruption with the COR. The contractor is responsible for providing traffic control personnel as needed during the period of the performance. Submittals: Submittals are required for all items outlined in the specification and include but are not limited to the submittals as shown in the submittal log. Project Duration: The total project duration for this project is not to exceed 120 days from the date of the NTP issuance. The period of performance for this project is expected to be from March 1st, 2026 to June 29th, 2026. This includes all processes starting with submission and approval of all submittals and ending with final punch list completion.

From Solicitation posted on Nov 06, 2025

REPLACE SIDWALKS, STATION WIDE 528A6-25-614 GENERAL PROJECT WORK SCOPE DESCRIPTION Existing Conditions: The Bath VAMC is located at 76 Veterans Avenue, Bath, NY 14810. The layout is a campus with more than 30 buildings located on over 200 acres. Normal working hours are Monday Friday 8:00am 4:30pm. Current sidewalks, station wide, are deteriorating and in need of repair/replacement. The Scope of this project includes but is not limited to demolishing/removing existing sidewalks, preparing subbase, installing new concrete sidewalks, including ADA tactile warning surfaces, & restoring disturbed lawns. Scope of Work: Demolition: Contractor is to provide all labor, material, equipment, supervision, to complete demolition of existing sidewalks as well as an existing metal handrail near the south end driveway of B-76 as identified in the contract drawings. Contractor is required to dispose of all demolition at an approved location offsite. Site Work: Contractor is to provide all labor, material, equipment, supervision, to excavate unsuitable base material and place new subbase material as specified. Contractor is required to locate all underground utilities and is responsible for all costs associated with any utility strike or damage. Contractor is to form new sidewalks to be 6 feet wide, unless otherwise specified in the drawings, and to be a minimum of 6 thick with the specified reinforcement. Contractor is to pin new concrete sidewalk into existing sidewalk where applicable. Contractor is to install cast-in-place, cast-iron with epoxy coat finish ADA tactile warning surfaces where specified in the contract drawings. Contractor is to provide and install new black anodized steel hand railing as specified. Contractor is to coordinate all 3rd party testing necessary as specified. All work to be in compliance with contract drawings, and specifications. Code requirements: The installed product must, at a minimum, be in accordance with all applicable codes including Veterans Affairs standards which can be found at https://www.cfm.va.gov/til/. This will include, but not be limited to: Department of Veterans Affairs Design Manuals, VA Publications, and Construction Standards, National Fire Protection Code (NFPA), Life Safety Code, Underwriters Laboratory (UL), International Building Code IBC, National Electric Code (NEC), the VA Information Security Handbook 6500.6, Occupational Health and Safety (OSHA), and Environmental Protection Agency (EPA) requirements (to include Mold Remediation in Schools and Commercial Buildings). All work will be completed by certified individuals. Contract Drawings: Please see attached. Specifications: Please see attached. General Requirements: The contractor shall review the contract documents for conflicts. Where conflicts exist work shall not proceed until the COR has been notified and has given direction. Where incidental work is required to accomplish work shown on the drawings, this work is implied and shall be included as part of the base bid. Prior to any work commencing in an area, the contractor shall notify the COR of his intention to work in the area and shall schedule a walkthrough with the COR to determine existing conditions. After the work, the existing work areas shall be returned to their original state before final approval shall be given. After the completion of construction, the contractor shall completely clean all surfaces of construction debris. The contractor shall receive all deliveries of materials, equipment, tools, or other goods off station, and bring them to the job site. The Bath VA shall not accept deliveries for project purposes. The contractor shall prepare and submit an excel spreadsheet submittal log listing all submittals required. The worksheet shall be submitted by the contractor and reviewed and re-submitted as necessary. The contractor shall not proceed with any on-site work until the completion of the submittal process or approval to proceed from the CO and COR without completion of the submittal process. Not less than 14 calendar days shall be planned for COR review of each submittal. Re-submittals shall be provided as required by the COR, and shall be treated as a new, separate submittal. Any non-lead time materials will only be paid for when installed. Any items identified as punch list items will be fixed prior to project closeout. Special care will be taken to secure tools and construction equipment during construction as this facility has patients in it. Work cleanliness must be adhered to throughout the project. Sounds and vibrations must be kept to a minimum to avoid patient disruption. The COR reserves the right to stop work if sound and vibrations are impacting patient living or employees. Off tour work may be required to minimize the impact on Veterans and employees. The contractor shall warranty all work including for 1 year from the date of acceptance. Warranty shall include any labor or parts necessary to ensure complete functionality of the new area. The contractor shall plan accordingly to stage and store materials in the contractor s designated area shown. The contractor shall be responsible for coordinating any traffic interruption with the COR. The contractor is responsible for providing traffic control personnel as needed during the period of the performance. Submittals: Submittals are required for all items outlined in the specification and include but are not limited to the submittals as shown in the submittal log. Project Duration: The total project duration for this project is not to exceed 120 days from the date of the NTP issuance. The period of performance for this project is expected to be from March 1st, 2026 to June 29th, 2026. This includes all processes starting with submission and approval of all submittals and ending with final punch list completion.

From Solicitation posted on Nov 10, 2025

fdfdfdsfdf

From Solicitation posted on Nov 17, 2025

AGENDA FOR SITE VISIT/PRE-BID CONFERENCE November 13th , 2025 Replace Sidewalks Station Wide, Bath, NY VAMC Project 528A6-25-614/Solicitation: 36C24226B0007 Introduction: Names of Key Individuals for this Acquisition: Contracting Officer: Devan Bertch: Devan.Bertch@va.gov (716)-698-6459 COR: Michael Cagle: Michael.Cagle@va.gov General Comments/Instructions to Offeror: The Invitation for Bid (IFB) package consists of: Description of Work, Specifications, and Drawings Instructions to Offerors Solicitation Provisions and Contract Clauses Certifications/Representations When submitting the proposal: Offeror must complete and submit one (1) set of the SF1442 at time of Bid submission. Be sure to accurately acknowledge all amendments posted on page 2 with correct dates. Offeror shall submit a Bid Bond along with the bid. Offeror must submit Limitations on Subcontracting and Buy American Certificate form signed. Offeror shall submit EMR (Experience Modification Rate) rating with bid. Offeror must be registered in: www.beta.sam.gov; Certifications/ Representations must be completed. SDVOSB/VOSB offerors must be verified in www.vetbiz.gov at time of offer and award. Offerors must be registered as a small business under the applicable NAICS code noted in the solicitation. Be prepared to provide government with additional financial information if selected for award. Letter of financial capability from your bank or acceptable Dun and Bradstreet report with risk rating. Virtual bid opening is scheduled for Wednesday, December 10th, 2025 @ 1:00 PM EST. CALL: +1 347-566-4838 and enter conference ID: 668 463 742# Bids are due Wednesday, December 10th, 2025 @ 12:30 PM EST Cutoff date for RFI s is Wednesday, November 19th, 2025 at 12:00pm. Procedure for requesting information/clarifications: Offeror is responsible for bringing any blatant ambiguities in the documents to the Contracting Officers attention. All questions must be in writing and emailed/sent to the Contract Specialist Devan.bertch@va.gov All technical questions will be answered by the Contracting Officer, in writing, via amendment to the solicitation. Amendments will be posted at: beta.SAM.gov An amendment may also be used to communicate other information (i.e., updated wage decisions, revised clauses, extended bid closing date, etc.). Offeror must acknowledge receipt of all amendments issued. Offeror and Offeror s subcontractors are not permitted to contact Engineering Service for information regarding this project. To do so will be to your detriment as any answers you receive will not be applicable in a dispute with the Contracting Officer. Additional Site Visits/Questions: This is the only scheduled site visit. There will be no other site visits. An RFI has asked to include linear feet to the SOW. Other requests?

From Solicitation posted on Nov 25, 2025

Notice history

5
  1. Presolicitation Posted Oct 17, 2025
  2. Solicitation Posted Nov 06, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Set-Aside: Service-Disabled Veteran-Owned Small Business Set AsideNone
  3. Solicitation Posted Nov 10, 2025
    No changes from previous notice
  4. Solicitation Posted Nov 17, 2025
    • Description: Description was updated
  5. Solicitation LATEST Posted Nov 25, 2025
    • Description: Description was updated

Details

Solicitation number 36C24226B0007
Notice ID 71a95892faa44e67966c0c97fc29c352
Notice type Presolicitation
Product / Service (PSC) Y1DA
NAICS 238110
Place of performance Bath, New York
Archive date Feb 08, 2026

Award Information

Awardees
0

Documents

1
View on SAM.gov

Contacts

primary
Devan Bertch

Contracting Officer

Email

Phone

Agency

VETERANS AFFAIRS, DEPARTMENT OF
VETERANS AFFAIRS, DEPARTMENT OF
242-NETWORK CONTRACT OFFICE 02 (36C242)

Place of Performance

Bath VA Medical Center 76 Veterans Ave.
Bath, New York 14810
USA

Dates

Posted Oct 17, 2025 9 months ago
Last Updated Aug 06, 2026 1 day ago
Due Dec 10, 2025 7 months ago